| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR Building ASBE0012-001 (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 | |
| ASBESTOS WORKERS/INSULATOR Building ASBE0012-001 (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 | |
| BRICKLAYER Building BRNY0001-001 Scope differs by code/WD | $67.39 | $35.90 | $103.29 | |
| BRICKLAYER Building BRNY0001-001 Scope differs by code/WD | $67.39 | $35.90 | $103.29 | |
| BRICKLAYER (MARBLE POLISHERS) Building BRNY0024-001 | $52.32 | $36.25 | $88.57 | |
| CARPENTER, BUILDING & RESIDENTIAL Building CARP0157-001 (BRONX AND NEW YORK COUNTIES) | $59.05 | $48.08 | $107.13 | |
| CARPENTER, BUILDING & RESIDENTIAL (KINGS COUNTY) Building CARP0926-001 | $59.05 | $48.08 | $107.13 | |
| CARPENTER, BUILDING & RESIDENTIAL (QUEENS COUNTY) Building CARP0045-001 | $59.05 | $48.08 | $107.13 | |
| CARPENTER, BUILDING & RESIDENTIAL (RICHMOND COUNTY) Building CARP0020-001 | $59.05 | $48.08 | $107.13 | |
| CARPENTER: HEAVY & HIGHWAY Building CARP0157-002 (BRONX AND NEW YORK COUNTIES) | $61.59 | $55.84 | $117.43 | |
| CARPENTER: HEAVY & HIGHWAY (KINGS COUNTY) Building CARP0926-002 | $61.59 | $55.84 | $117.43 | |
| CARPENTER: HEAVY & HIGHWAY (QUEENS COUNTY) Building CARP0045-002 | $61.59 | $55.84 | $117.43 | |
| CARPENTER: HEAVY & HIGHWAY (RICHMOND COUNTY) Building CARP0020-002 | $61.59 | $55.84 | $117.43 | |
| CARPENTERS: (SOFT FLOOR LAYERS) Building CARP2287-004 | $59.05 | $48.08 | $107.13 | |
| CARPENTERS: (TIMBERMEN) Building CARP1556-011 | $55.59 | $55.41 | $111.00 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0780-001 | $59.87 | $41.81 | $101.68 | |
| CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 1 Building ENGI0014-002 (BUILDING & RESIDENTIAL) DOUBLE DRUM FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $92.32 | $38.95 | $131.27 | |
| CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 2 Building ENGI0014-002 (BUILDING & RESIDENTIAL) STONE DERRICK, CRANES, HYDRAULIC 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.79 | $38.95 | $136.74 | |
| DIVER Building CARP1556-007 | $75.46 | $55.84 | $131.30 | |
| DIVER TENDER Building CARP1556-007 | $55.00 | $55.84 | $110.84 | |
| DOCK BUILDER & PILEDRIVERMEN Building CARP1556-006 | $60.59 | $55.84 | $116.43 | |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $48.48 | $15.34 | $63.82 | |
| DREDGING: CLASS A2: CRANE OPERATOR Heavy ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $43.20 | $14.99 | $58.19 | |
| DREDGING: CLASS B1: DERRICK OPERATOR Heavy ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $41.93 | $14.90 | $56.83 | |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $39.46 | $14.73 | $54.19 | |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $38.38 | $14.66 | $53.04 | |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $37.15 | $14.57 | $51.72 | |
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $30.86 | $14.15 | $45.01 | |
| ELECTRICIAN Building ELEC0003-001 (JOBBING, AND MAINTENANCE AND REPAIR WORK) PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $32.00 | $27.16 | $59.16 | |
| ELEVATOR MECHANIC: ELEVATOR CONSTRUCTOR Building ELEV0001-002 (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED.) | $75.14 | $47.45 | $122.59 | |
| ELEVATOR MECHANIC: MODERNIZATION AND REPAIR Building ELEV0001-002 (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED.) | $59.09 | $45.56 | $104.65 | |
| GLAZIER Building PAIN0009-001 | $49.20 | $57.20 | $106.40 | |
| HAZARDOUS MATERIAL HANDLER Building ASBE0012-001 Scope differs by code/WD | $47.75 | $13.70 | $61.45 | |
| HAZARDOUS MATERIAL HANDLER Building ASBE0012-001 Scope differs by code/WD | $47.75 | $13.70 | $61.45 | |
| IRONWORKER: METALLIC LATHERS AND REINFORCING IRONWORKERS Building IRON0046-003 | $57.00 | $32.96 | $89.96 | |
| IRONWORKER: ORNAMENTAL Building IRON0580-001 | $48.15 | $67.62 | $115.77 | |
| IRONWORKER: STONE DERRICKMAN Building IRON0197-001 | $60.40 | $60.14 | $120.54 | |
| IRONWORKER: STRUCTURAL (BRONX, NEW YORK, RICHMOND) Building IRON0040-002 | $58.95 | $92.02 | $150.97 | |
| IRONWORKERS: STRUCTURAL (KINGS, QUEENS) Building IRON0361-002 | $58.95 | $92.02 | $150.97 | |
| LABOERE, BUILDING CONSTRUCTION: MASON TENDER/GENERAL LABORER Building LABO0079-001 | $44.70 | $29.55 | $74.25 | |
| LABORER (CEMENT AND CONCRETE WORKERS) Building LABO0006-001 | $49.28 | $27.05 | $76.33 | |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION LABORER: Building LABO0731-001 (ASBESTOS, LEAD, HAZARDOUS WASTE REMOVAL (INCLUDING SOIL)/CEMENT/CONCRETE (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY) | $44.50 | $52.08 | $96.58 | |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION UTILITY LABORER Building LABO0731-001 (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY) | $44.35 | $52.08 | $96.43 | |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS Building LABO0079-001 (INTERIOR) (Tier A- RESPONSIBLE FOR THE REMOVAL OF ALL INTERIOR PETITIONS AND STRUCTURAL PETITIONS THAT CN CONSIST OF SHEET ROCK, BLOCK OR MASONRY. ALSO, ALL STRUCTURAL SLAB OPENINGS AND EXTERIOR WALLS WHERE THE BUILDING IS NOT BEING COMPLETELY DEMOLITIONED.) | $40.22 | $25.17 | $65.39 | |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS Building LABO0079-001 (INTERIOR) (Tier B- RESPONSIBLE FOR SHOVELING OF DEBRIS INTO CONTAINER, PUSHING CONTAINERS FROM THE INSIDE TO THE OUTSIDE OF THE BIULDING) | $29.29 | $20.29 | $49.58 | |
| LABORERS-ASPHALT CONSTRUCTION: MICRO PAVER Building LABO1010-002 | $50.80 | $54.05 | $104.85 | |
| LABORERS-ASPHALT CONSTRUCTION: RAKER Building LABO1010-002 | $50.20 | $54.05 | $104.25 | |
| LABORERS-ASPHALT CONSTRUCTION: SCREEDPERSON Building LABO1010-002 | $50.80 | $54.05 | $104.85 | |
| LABORERS-ASPHALT CONSTRUCTION: SHOVELER Building LABO1010-002 (PRODUCTION PAVING ONLY) | $46.33 | $54.05 | $100.38 | |
| LABORERS-ASPHALT CONSTRUCTION: SMALL EQUIPMENT OPERATOR (ASPHALT) Building LABO1010-002 | $46.33 | $54.05 | $100.38 | |
| LABORERS: ASBESTOS Building LABO0078-001 (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) | $41.15 | $20.90 | $62.05 | |
| LABORERS: FENCE INSTALLER & REPAIRER Building LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 | |
| LABORERS: FORMSETTERS Building LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $50.80 | $54.04 | $104.84 | |
| LABORERS: FREE AIR & TUNNEL Building LABO0147-001 (MAINTENANCE MEN, INSIDE MUCK LOCK TENDERS, PUMP MEN, ELECTRICIANS, CEMENT FINISHERS, CAULKERS, HYDRAULIC MEN, SHIELD MEN, MONORAIL OPERATORS, MOTOR MEN, CONVEYOR MEN, POWDER CARRIERS, PAN MEN, RIGGERS, CHUCK TENDERS, TRACK MEN PAINTERS, NIPPERS, BRAKEMEN, CABLE MEN, HOSE MEN, GROUT MEN, GRAVEL MEN, FORM WORKERS, CONCRETE WORKERS, TUNNEL LABORERS, MOLE NIPPER (ONE (1) MOLE SIPPER PER WORKING SHAFT PER SHIFT FOR UP TO AND INCLUDING TWO (2) MOLES) | $64.08 | $54.00 | $118.08 | |
| LABORERS: HEAVY (BLASTERS (HYDRAULIC TRAC DRILL)) Building LABO0731-002 | $51.85 | $52.08 | $103.93 | |
| LABORERS: HEAVY (BLASTERS) Building LABO0731-002 | $57.71 | $52.08 | $109.79 | |
| LABORERS: HEAVY (HYDRAULIC TRAC DRILL) Building LABO0731-002 | $51.85 | $52.08 | $103.93 | |
| LABORERS: HEAVY (POWDER CARRIERS) Building LABO0731-002 | $44.50 | $52.08 | $96.58 | |
| LABORERS: LABORERS Building LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 | |
| LABORERS: LANDSCAPE PLANTING & MAINTENANCE Building LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 | |
| LABORERS: MAINTENANCE SAFETY SURFACE Building LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 | |
| LABORERS: SLURRY/SEALCOATER/PLAY EQUIPMENT INSTALLER Building LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 | |
| LABORERS: SMALL EQUIPMENT OPERATOR Building LABO1010-001 (NOT OPERATING ENGINEER) (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 | |
| LABORERS: SMALL POWER TOOLS OPERATOR Building LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 | |
| LABORERS:, HEAVY Building LABO0731-002 (JACKHAMMERS, CHIPPERS, SPADERS, CONCRETE BREAKERS, ALL OTHER PNEUMATIC TOOLS, WALK BEHIND SELF-PROPELLED HYDRAULIC ASPHALT AND CONCRETE BREAKER) | $44.50 | $52.08 | $96.58 | |
| LINE CONSTRUCTION: GROUNDMAN Building ELEC1049-001 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $42.34 | $30.05 | $72.39 | |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR Building ELEC1049-001 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $56.46 | $34.63 | $91.09 | |
| LINE CONSTRUCTION: LINEMAN AND CABLE SPLICER Building ELEC1049-001 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $70.57 | $39.19 | $109.76 | |
| MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 1 Building ENGI0015-001 (HEAVY AND HIGHWAY) CHERRYPICKERS 20 TONS AND OVER AND LOADERS (RUBBER-TIRED AND/OR TRACTOR TYPE WITH A MANFUFACTURER'S RATED CAPACITY OF SIX CUBIC YARDS AND OVER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $74.65 | $38.00 | $112.65 | |
| MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 2 Building ENGI0015-001 (HEAVY AND HIGHWAY) RUBBER TIRE BACKHOES UP TO AND INCLUDING 37,000 LBS, BASIN MACHINES, GROOVER, MECHANICAL SWEEPERS, BOBCAT, BOOM TRUCK, BARRIER TRANSPORT (BARRIER MOVER) AND MACHINES OF A SIMILAR NATURE, BOAT CAPTAINS, BOAT OPERATORS, OPERATION OF CHURN DRILLS AND MACHINES OF A SIMILAR NATURE, STETCO SILENT HOIST AND MACHINES OF A SIMILAR NATURE, VAC-ALLS, MEYERS MACHINES, JOHN BEAM AND MACHINES OF A SIMILAR NATURE, ROSS CARRIERS AND TRAVEL LIFTS AND MACHINES OF A SIMILAR NATURE, BULLDOZERS, SCRAPERS, AND TURN-A PULLS, TUGGER HOIST (USED EXCLUSIVELY FOR HANDLING EXCAVATED MATERIAL), TRACTORS WITH ATTACHMENTS, HYSTER AND ROUSTABOUT CRANES, CHERRYPICKERS, AUSTIN WESTERN, GROVE AND MACHINES OF A SIMILAR NATURE, SCOOPMOBILES, MONORAILS, CONVEYORS, TRENCHERS, LOADERS- RUBBER-TIRED AND TRACTOR, BARBER GREENE, EIMCO LOADERS AND EIMCO BACKHOES, MIGHTY MIDGET AND SIMILAR BREAKERS AND TAMPERS, CURB AND GUTTER PAVERS AND MOTOR PATROL, MOTOR GRADERS AND ALL MACHINES OF A SIMILAR NATURE, LOCOMOTIVES TEN (10) TONS OR UNDER, MINI-MAX, BREAK-TECH AND MACHINES OF A SIMILAR NATURE, MILLING MACHINES, ROBOTIC AND DEMOLITION MACHINES AND MACHINES OF A SIMILAR NATURE INCLUDING BOBCAT, PILE RIG RUBBER-TIRED EXCAVATOR (37,000 LBS. AND UNDER), 2 MAN AUGER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $72.40 | $38.00 | $110.40 | |
| MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 3 Building ENGI0015-001 (HEAVY AND HIGHWAY) MINOR EQUIPMENT SUCH AS TRACTORS, POST HOLE DIGGERS AND DRIVERS, DITCH WITCH (WALK BEHIND), ROAD FINISHING MACHINES, ROLLERS (FIVE (5) TONS AND UNDER), TUGGER HOISTS, DUAL PURPOSE TRUCKS, FORK LIFTS AND DEMPSEY DUMPSTERS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $68.62 | $38.00 | $106.62 | |
| MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 4 Building ENGI0015-001 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) GRADALLS AND CONCRETE PUMPS OR SIMILARLY EQUIPMENT 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $64.82 | $38.00 | $102.82 | |
| MARBLE FINISHER Building BRNY0020-001 | $49.99 | $37.54 | $87.53 | |
| MARBLE MASON Building BRNY0004-001 | $63.92 | $40.20 | $104.12 | |
| MASON - STONE Building BRNY0001-001 Scope differs by code/WD | $69.91 | $44.02 | $113.93 | |
| MASON - STONE Building BRNY0001-001 Scope differs by code/WD | $69.91 | $44.02 | $113.93 | |
| MILLWRIGHT Building CARP0740-001 | $60.83 | $58.03 | $118.86 | |
| PAINTER Building PAIN0009-001 (PAINTERS, DRYWALL FINISHERS, LEAD ABATEMENT WORKER) | $44.75 | $44.11 | $88.86 | |
| PAINTER (SPRAY, SCAFFOLD AND SANDBLASTING) Building PAIN0009-001 | $47.75 | $44.11 | $91.86 | |
| PAINTERS (DRYWALL TAPERS/POINTERS) Building PAIN1974-001 | $48.47 | $35.91 | $84.38 | |
| PAINTERS (STRUCTURAL STEEL AND BRIDGE) Building PAIN0806-001 | $56.25 | $55.14 | $111.39 | |
| PLASTERER Building PLAS0262-001 | $48.51 | $32.78 | $81.29 | |
| PLASTERER (KINGS AND QUEENS COUNTIES) Building PLAS0262-002 | $48.51 | $32.78 | $81.29 | |
| PLUMBER Building PLUM0001-001 | $73.00 | $32.81 | $105.81 | |
| PLUMBER: MECHANICAL EQUIPMENT AND SERVICE Building PLUM0001-001 (ANY REPAIR AND/OR REPLACEMENT OF THE PRESENT PLUMBING SYSTEM THAT DOES NOT CHANGE THE EXISTING ROUGHING) | $48.90 | $22.26 | $71.16 | |
| PLUMBER: SERVICE FITTERS Building PLUM0638-001 (SERVICE FITTER WORK SHALL CONSIST OF ALL REPAIR, SERVICE AND MAINTENANCE WORK ON DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS ETC., INCLUDING BUT NOT EXCLLUSIVLY FOR CHARGING, EVACUATION, LEAK TESTING AND ASSEMBLING FOR ALL MACHINES FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND HEATING APPARATUS. ALSO, WORK SHALL INCLUDE ADJUSTING, INCLUDING CAPACITY ADJUSTMENTS, CHECKING AND REPAIRING OR REPLACEMENT OF ALL CONTROLS AND START UP OF ALL MACHINES AND REPAIRING ALL DEFECTS THAT MAY DEVELOP ON ANY SYSTEM FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION AND ALL AIR CONDITINIONG, AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS REGARDLESS OF SIZE OR TYPE.) | $47.85 | $23.96 | $71.81 | |
| PLUMBER: SPRINKLER FITTERS, STEAMFITTERS Building PLUM0638-001 | $70.36 | $54.24 | $124.60 | |
| POINTER, CLEANER AND CAULKER Building BRNY0001-002 | $63.69 | $32.42 | $96.11 | |
| POWER EQUIPMENT OPERATOR GROUP 1 Building ENGI0015-002 (BUILDING) OILER LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $65.94 | $32.95 | $98.89 | |
| POWER EQUIPMENT OPERATOR GROUP 2 Building ENGI0015-002 (BUILDING) OILERS ON CRAWLER CRANES, BACKHOES, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $63.98 | $32.95 | $96.93 | |
| POWER EQUIPMENT OPERATOR GROUP 3 Building ENGI0014-002 (BUILDING & RESIDENTIAL) 4 POLE HOIST, SINGLE DRUM HOISTS LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $79.70 | $38.95 | $118.65 | |
| POWER EQUIPMENT OPERATOR GROUP 3 Building ENGI0015-002 (BUILDING) GRADALLS: CONCRETE PUMPS, POWER HOUSES - ALL EQUIPMENT IN SAME IS MANNED BY TWO (2) MEN ONLY, DRIVING TRUCK CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.42 | $32.95 | $90.37 | |
| POWER EQUIPMENT OPERATOR GROUP 4 Building ENGI0014-002 (BUILDING & RESIDENTIAL) FORK LIFT, HOUSE CARS, PLASTER (PLATFORM MACHINE), PLASTER BUCKET, CONCRETE PUMP AND ALL OTHER EQUIPMENT USED FOR HOISTING MATERIAL LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $72.46 | $38.95 | $111.41 | |
| POWER EQUIPMENT OPERATOR GROUP 5 Building ENGI0014-002 (BUILDING & RESIDENTIAL) COMPRESSORS, WELDING MACHINES (CUTTING CONCRETE WORK), PAINT SPRAYING, SAND BLASTING, PUMPS (WITH THE EXCLUSION OF CONCRETE PUMPS), HOUSE CAR (SETTLEMENT BASIS ONLY), ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILIARY EQUIPMENT, AIR, HYDRAULIC, ETC., BOILERS DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $54.12 | $38.95 | $93.07 | |
| POWER EQUIPMENT OPERATOR GROUP 5 Building ENGI0015-001 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) SHOVELS, CRANES (DRAGLINES), BACKHOES, PAVERS, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $44.45 | $38.00 | $82.45 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES Building ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $117.60 | $38.95 | $156.55 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES Building ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $117.60 | $38.95 | $156.55 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS Building ENGI0014-001 (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $81.38 | $38.95 | $120.33 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS Building ENGI0014-001 (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $81.38 | $38.95 | $120.33 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS Building ENGI0014-001 (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $61.87 | $38.95 | $100.82 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS Building ENGI0014-001 (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $61.87 | $38.95 | $100.82 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS Building ENGI0014-001 (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.52 | $38.95 | $96.47 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS Building ENGI0014-001 (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.52 | $38.95 | $96.47 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES Building ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $100.18 | $38.95 | $139.13 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES Building ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $100.18 | $38.95 | $139.13 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES Building ENGI0014-001 (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.75 | $38.95 | $136.70 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES Building ENGI0014-001 (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.75 | $38.95 | $136.70 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES Building ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $93.74 | $38.95 | $132.69 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES Building ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $93.74 | $38.95 | $132.69 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS Building ENGI0014-001 (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $91.04 | $38.95 | $129.99 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS Building ENGI0014-001 (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $91.04 | $38.95 | $129.99 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE Building ENGI0014-001 (OTHER THAN ABOVE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $88.72 | $38.95 | $127.67 | |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE Building ENGI0014-001 (OTHER THAN ABOVE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $88.72 | $38.95 | $127.67 | |
| ROOFER Building ROOF0008-003 | $50.25 | $32.62 | $82.87 | |
| SHEET METAL WORKER (BUILDING CONSTRUCTION) Building SHEE0028-002 | $53.60 | $60.74 | $114.34 | |
| SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) Building SHEE0028-002 | $35.79 | $25.37 | $61.16 | |
| TERRAZZO FINISHER Building BRNY0007-001 | $49.59 | $34.25 | $83.84 | |
| TERRAZZO WORKER/SETTER Building BRNY0007-001 | $64.62 | $37.63 | $102.25 | |
| TILE FINISHER Building BRNY0007-002 | $49.59 | $34.25 | $83.84 | |
| TILE LAYER Building BRNY0052-001 | $64.40 | $37.13 | $101.53 | |
| TRUCK DRIVER EUCLIDS & TURNAPULLS Building TEAM0282-001 (FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK.) | $49.38 | $57.65 | $107.03 | |
| TRUCK DRIVER: ASPHALT Building TEAM0282-001 (FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK.) | $46.12 | $59.65 | $105.77 | |
| TRUCK DRIVER: HIGH RISE Building TEAM0282-001 (FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK.) | $65.43 | $53.15 | $118.58 |
No trade rates match your search and filter selection.
Heavy
Applies to
Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more
Building, Heavy, Highway, Residential
Applies to
Bronx, Kings, New York, Queens, Richmond