Richmond

2 wage determinations 123 trade rates

Popular Trades In Richmond

Track Richmond County updates

Get an email when wage determinations covering Richmond County, New York are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
ASBESTOS WORKERS/INSULATOR Building
ASBE0012-001 (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.)
$71.76 $36.81 $108.57
ASBESTOS WORKERS/INSULATOR Building
ASBE0012-001 (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.)
$71.76 $36.81 $108.57
BRICKLAYER Building
BRNY0001-001 Scope differs by code/WD
$67.39 $35.90 $103.29
BRICKLAYER Building
BRNY0001-001 Scope differs by code/WD
$67.39 $35.90 $103.29
BRICKLAYER (MARBLE POLISHERS) Building
BRNY0024-001
$52.32 $36.25 $88.57
CARPENTER, BUILDING & RESIDENTIAL Building
CARP0157-001 (BRONX AND NEW YORK COUNTIES)
$59.05 $48.08 $107.13
CARPENTER, BUILDING & RESIDENTIAL (KINGS COUNTY) Building
CARP0926-001
$59.05 $48.08 $107.13
CARPENTER, BUILDING & RESIDENTIAL (QUEENS COUNTY) Building
CARP0045-001
$59.05 $48.08 $107.13
CARPENTER, BUILDING & RESIDENTIAL (RICHMOND COUNTY) Building
CARP0020-001
$59.05 $48.08 $107.13
CARPENTER: HEAVY & HIGHWAY Building
CARP0157-002 (BRONX AND NEW YORK COUNTIES)
$61.59 $55.84 $117.43
CARPENTER: HEAVY & HIGHWAY (KINGS COUNTY) Building
CARP0926-002
$61.59 $55.84 $117.43
CARPENTER: HEAVY & HIGHWAY (QUEENS COUNTY) Building
CARP0045-002
$61.59 $55.84 $117.43
CARPENTER: HEAVY & HIGHWAY (RICHMOND COUNTY) Building
CARP0020-002
$61.59 $55.84 $117.43
CARPENTERS: (SOFT FLOOR LAYERS) Building
CARP2287-004
$59.05 $48.08 $107.13
CARPENTERS: (TIMBERMEN) Building
CARP1556-011
$55.59 $55.41 $111.00
CEMENT MASON/CONCRETE FINISHER Building
PLAS0780-001
$59.87 $41.81 $101.68
CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 1 Building
ENGI0014-002 (BUILDING & RESIDENTIAL) DOUBLE DRUM FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$92.32 $38.95 $131.27
CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 2 Building
ENGI0014-002 (BUILDING & RESIDENTIAL) STONE DERRICK, CRANES, HYDRAULIC 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$97.79 $38.95 $136.74
DIVER Building
CARP1556-007
$75.46 $55.84 $131.30
DIVER TENDER Building
CARP1556-007
$55.00 $55.84 $110.84
DOCK BUILDER & PILEDRIVERMEN Building
CARP1556-006
$60.59 $55.84 $116.43
DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$48.48 $15.34 $63.82
DREDGING: CLASS A2: CRANE OPERATOR Heavy
ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$43.20 $14.99 $58.19
DREDGING: CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$41.93 $14.90 $56.83
DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$39.46 $14.73 $54.19
DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$38.38 $14.66 $53.04
DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$37.15 $14.57 $51.72
DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy
ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
$30.86 $14.15 $45.01
ELECTRICIAN Building
ELEC0003-001 (JOBBING, AND MAINTENANCE AND REPAIR WORK) PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY
$32.00 $27.16 $59.16
ELEVATOR MECHANIC: ELEVATOR CONSTRUCTOR Building
ELEV0001-002 (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED.)
$75.14 $47.45 $122.59
ELEVATOR MECHANIC: MODERNIZATION AND REPAIR Building
ELEV0001-002 (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED.)
$59.09 $45.56 $104.65
GLAZIER Building
PAIN0009-001
$49.20 $57.20 $106.40
HAZARDOUS MATERIAL HANDLER Building
ASBE0012-001 Scope differs by code/WD
$47.75 $13.70 $61.45
HAZARDOUS MATERIAL HANDLER Building
ASBE0012-001 Scope differs by code/WD
$47.75 $13.70 $61.45
IRONWORKER: METALLIC LATHERS AND REINFORCING IRONWORKERS Building
IRON0046-003
$57.00 $32.96 $89.96
IRONWORKER: ORNAMENTAL Building
IRON0580-001
$48.15 $67.62 $115.77
IRONWORKER: STONE DERRICKMAN Building
IRON0197-001
$60.40 $60.14 $120.54
IRONWORKER: STRUCTURAL (BRONX, NEW YORK, RICHMOND) Building
IRON0040-002
$58.95 $92.02 $150.97
IRONWORKERS: STRUCTURAL (KINGS, QUEENS) Building
IRON0361-002
$58.95 $92.02 $150.97
LABOERE, BUILDING CONSTRUCTION: MASON TENDER/GENERAL LABORER Building
LABO0079-001
$44.70 $29.55 $74.25
LABORER (CEMENT AND CONCRETE WORKERS) Building
LABO0006-001
$49.28 $27.05 $76.33
LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION LABORER: Building
LABO0731-001 (ASBESTOS, LEAD, HAZARDOUS WASTE REMOVAL (INCLUDING SOIL)/CEMENT/CONCRETE (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY)
$44.50 $52.08 $96.58
LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION UTILITY LABORER Building
LABO0731-001 (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY)
$44.35 $52.08 $96.43
LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS Building
LABO0079-001 (INTERIOR) (Tier A- RESPONSIBLE FOR THE REMOVAL OF ALL INTERIOR PETITIONS AND STRUCTURAL PETITIONS THAT CN CONSIST OF SHEET ROCK, BLOCK OR MASONRY. ALSO, ALL STRUCTURAL SLAB OPENINGS AND EXTERIOR WALLS WHERE THE BUILDING IS NOT BEING COMPLETELY DEMOLITIONED.)
$40.22 $25.17 $65.39
LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS Building
LABO0079-001 (INTERIOR) (Tier B- RESPONSIBLE FOR SHOVELING OF DEBRIS INTO CONTAINER, PUSHING CONTAINERS FROM THE INSIDE TO THE OUTSIDE OF THE BIULDING)
$29.29 $20.29 $49.58
LABORERS-ASPHALT CONSTRUCTION: MICRO PAVER Building
LABO1010-002
$50.80 $54.05 $104.85
LABORERS-ASPHALT CONSTRUCTION: RAKER Building
LABO1010-002
$50.20 $54.05 $104.25
LABORERS-ASPHALT CONSTRUCTION: SCREEDPERSON Building
LABO1010-002
$50.80 $54.05 $104.85
LABORERS-ASPHALT CONSTRUCTION: SHOVELER Building
LABO1010-002 (PRODUCTION PAVING ONLY)
$46.33 $54.05 $100.38
LABORERS-ASPHALT CONSTRUCTION: SMALL EQUIPMENT OPERATOR (ASPHALT) Building
LABO1010-002
$46.33 $54.05 $100.38
LABORERS: ASBESTOS Building
LABO0078-001 (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION)
$41.15 $20.90 $62.05
LABORERS: FENCE INSTALLER & REPAIRER Building
LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.)
$46.33 $54.04 $100.37
LABORERS: FORMSETTERS Building
LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.)
$50.80 $54.04 $104.84
LABORERS: FREE AIR & TUNNEL Building
LABO0147-001 (MAINTENANCE MEN, INSIDE MUCK LOCK TENDERS, PUMP MEN, ELECTRICIANS, CEMENT FINISHERS, CAULKERS, HYDRAULIC MEN, SHIELD MEN, MONORAIL OPERATORS, MOTOR MEN, CONVEYOR MEN, POWDER CARRIERS, PAN MEN, RIGGERS, CHUCK TENDERS, TRACK MEN PAINTERS, NIPPERS, BRAKEMEN, CABLE MEN, HOSE MEN, GROUT MEN, GRAVEL MEN, FORM WORKERS, CONCRETE WORKERS, TUNNEL LABORERS, MOLE NIPPER (ONE (1) MOLE SIPPER PER WORKING SHAFT PER SHIFT FOR UP TO AND INCLUDING TWO (2) MOLES)
$64.08 $54.00 $118.08
LABORERS: HEAVY (BLASTERS (HYDRAULIC TRAC DRILL)) Building
LABO0731-002
$51.85 $52.08 $103.93
LABORERS: HEAVY (BLASTERS) Building
LABO0731-002
$57.71 $52.08 $109.79
LABORERS: HEAVY (HYDRAULIC TRAC DRILL) Building
LABO0731-002
$51.85 $52.08 $103.93
LABORERS: HEAVY (POWDER CARRIERS) Building
LABO0731-002
$44.50 $52.08 $96.58
LABORERS: LABORERS Building
LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.)
$46.33 $54.04 $100.37
LABORERS: LANDSCAPE PLANTING & MAINTENANCE Building
LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.)
$46.33 $54.04 $100.37
LABORERS: MAINTENANCE SAFETY SURFACE Building
LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.)
$46.33 $54.04 $100.37
LABORERS: SLURRY/SEALCOATER/PLAY EQUIPMENT INSTALLER Building
LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.)
$46.33 $54.04 $100.37
LABORERS: SMALL EQUIPMENT OPERATOR Building
LABO1010-001 (NOT OPERATING ENGINEER) (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.)
$46.33 $54.04 $100.37
LABORERS: SMALL POWER TOOLS OPERATOR Building
LABO1010-001 (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.)
$46.33 $54.04 $100.37
LABORERS:, HEAVY Building
LABO0731-002 (JACKHAMMERS, CHIPPERS, SPADERS, CONCRETE BREAKERS, ALL OTHER PNEUMATIC TOOLS, WALK BEHIND SELF-PROPELLED HYDRAULIC ASPHALT AND CONCRETE BREAKER)
$44.50 $52.08 $96.58
LINE CONSTRUCTION: GROUNDMAN Building
ELEC1049-001 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY)
$42.34 $30.05 $72.39
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR Building
ELEC1049-001 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY)
$56.46 $34.63 $91.09
LINE CONSTRUCTION: LINEMAN AND CABLE SPLICER Building
ELEC1049-001 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY)
$70.57 $39.19 $109.76
MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 1 Building
ENGI0015-001 (HEAVY AND HIGHWAY) CHERRYPICKERS 20 TONS AND OVER AND LOADERS (RUBBER-TIRED AND/OR TRACTOR TYPE WITH A MANFUFACTURER'S RATED CAPACITY OF SIX CUBIC YARDS AND OVER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$74.65 $38.00 $112.65
MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 2 Building
ENGI0015-001 (HEAVY AND HIGHWAY) RUBBER TIRE BACKHOES UP TO AND INCLUDING 37,000 LBS, BASIN MACHINES, GROOVER, MECHANICAL SWEEPERS, BOBCAT, BOOM TRUCK, BARRIER TRANSPORT (BARRIER MOVER) AND MACHINES OF A SIMILAR NATURE, BOAT CAPTAINS, BOAT OPERATORS, OPERATION OF CHURN DRILLS AND MACHINES OF A SIMILAR NATURE, STETCO SILENT HOIST AND MACHINES OF A SIMILAR NATURE, VAC-ALLS, MEYERS MACHINES, JOHN BEAM AND MACHINES OF A SIMILAR NATURE, ROSS CARRIERS AND TRAVEL LIFTS AND MACHINES OF A SIMILAR NATURE, BULLDOZERS, SCRAPERS, AND TURN-A PULLS, TUGGER HOIST (USED EXCLUSIVELY FOR HANDLING EXCAVATED MATERIAL), TRACTORS WITH ATTACHMENTS, HYSTER AND ROUSTABOUT CRANES, CHERRYPICKERS, AUSTIN WESTERN, GROVE AND MACHINES OF A SIMILAR NATURE, SCOOPMOBILES, MONORAILS, CONVEYORS, TRENCHERS, LOADERS- RUBBER-TIRED AND TRACTOR, BARBER GREENE, EIMCO LOADERS AND EIMCO BACKHOES, MIGHTY MIDGET AND SIMILAR BREAKERS AND TAMPERS, CURB AND GUTTER PAVERS AND MOTOR PATROL, MOTOR GRADERS AND ALL MACHINES OF A SIMILAR NATURE, LOCOMOTIVES TEN (10) TONS OR UNDER, MINI-MAX, BREAK-TECH AND MACHINES OF A SIMILAR NATURE, MILLING MACHINES, ROBOTIC AND DEMOLITION MACHINES AND MACHINES OF A SIMILAR NATURE INCLUDING BOBCAT, PILE RIG RUBBER-TIRED EXCAVATOR (37,000 LBS. AND UNDER), 2 MAN AUGER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$72.40 $38.00 $110.40
MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 3 Building
ENGI0015-001 (HEAVY AND HIGHWAY) MINOR EQUIPMENT SUCH AS TRACTORS, POST HOLE DIGGERS AND DRIVERS, DITCH WITCH (WALK BEHIND), ROAD FINISHING MACHINES, ROLLERS (FIVE (5) TONS AND UNDER), TUGGER HOISTS, DUAL PURPOSE TRUCKS, FORK LIFTS AND DEMPSEY DUMPSTERS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$68.62 $38.00 $106.62
MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 4 Building
ENGI0015-001 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) GRADALLS AND CONCRETE PUMPS OR SIMILARLY EQUIPMENT 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$64.82 $38.00 $102.82
MARBLE FINISHER Building
BRNY0020-001
$49.99 $37.54 $87.53
MARBLE MASON Building
BRNY0004-001
$63.92 $40.20 $104.12
MASON - STONE Building
BRNY0001-001 Scope differs by code/WD
$69.91 $44.02 $113.93
MASON - STONE Building
BRNY0001-001 Scope differs by code/WD
$69.91 $44.02 $113.93
MILLWRIGHT Building
CARP0740-001
$60.83 $58.03 $118.86
PAINTER Building
PAIN0009-001 (PAINTERS, DRYWALL FINISHERS, LEAD ABATEMENT WORKER)
$44.75 $44.11 $88.86
PAINTER (SPRAY, SCAFFOLD AND SANDBLASTING) Building
PAIN0009-001
$47.75 $44.11 $91.86
PAINTERS (DRYWALL TAPERS/POINTERS) Building
PAIN1974-001
$48.47 $35.91 $84.38
PAINTERS (STRUCTURAL STEEL AND BRIDGE) Building
PAIN0806-001
$56.25 $55.14 $111.39
PLASTERER Building
PLAS0262-001
$48.51 $32.78 $81.29
PLASTERER (KINGS AND QUEENS COUNTIES) Building
PLAS0262-002
$48.51 $32.78 $81.29
PLUMBER Building
PLUM0001-001
$73.00 $32.81 $105.81
PLUMBER: MECHANICAL EQUIPMENT AND SERVICE Building
PLUM0001-001 (ANY REPAIR AND/OR REPLACEMENT OF THE PRESENT PLUMBING SYSTEM THAT DOES NOT CHANGE THE EXISTING ROUGHING)
$48.90 $22.26 $71.16
PLUMBER: SERVICE FITTERS Building
PLUM0638-001 (SERVICE FITTER WORK SHALL CONSIST OF ALL REPAIR, SERVICE AND MAINTENANCE WORK ON DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS ETC., INCLUDING BUT NOT EXCLLUSIVLY FOR CHARGING, EVACUATION, LEAK TESTING AND ASSEMBLING FOR ALL MACHINES FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND HEATING APPARATUS. ALSO, WORK SHALL INCLUDE ADJUSTING, INCLUDING CAPACITY ADJUSTMENTS, CHECKING AND REPAIRING OR REPLACEMENT OF ALL CONTROLS AND START UP OF ALL MACHINES AND REPAIRING ALL DEFECTS THAT MAY DEVELOP ON ANY SYSTEM FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION AND ALL AIR CONDITINIONG, AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS REGARDLESS OF SIZE OR TYPE.)
$47.85 $23.96 $71.81
PLUMBER: SPRINKLER FITTERS, STEAMFITTERS Building
PLUM0638-001
$70.36 $54.24 $124.60
POINTER, CLEANER AND CAULKER Building
BRNY0001-002
$63.69 $32.42 $96.11
POWER EQUIPMENT OPERATOR GROUP 1 Building
ENGI0015-002 (BUILDING) OILER LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$65.94 $32.95 $98.89
POWER EQUIPMENT OPERATOR GROUP 2 Building
ENGI0015-002 (BUILDING) OILERS ON CRAWLER CRANES, BACKHOES, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$63.98 $32.95 $96.93
POWER EQUIPMENT OPERATOR GROUP 3 Building
ENGI0014-002 (BUILDING & RESIDENTIAL) 4 POLE HOIST, SINGLE DRUM HOISTS LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$79.70 $38.95 $118.65
POWER EQUIPMENT OPERATOR GROUP 3 Building
ENGI0015-002 (BUILDING) GRADALLS: CONCRETE PUMPS, POWER HOUSES - ALL EQUIPMENT IN SAME IS MANNED BY TWO (2) MEN ONLY, DRIVING TRUCK CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$57.42 $32.95 $90.37
POWER EQUIPMENT OPERATOR GROUP 4 Building
ENGI0014-002 (BUILDING & RESIDENTIAL) FORK LIFT, HOUSE CARS, PLASTER (PLATFORM MACHINE), PLASTER BUCKET, CONCRETE PUMP AND ALL OTHER EQUIPMENT USED FOR HOISTING MATERIAL LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$72.46 $38.95 $111.41
POWER EQUIPMENT OPERATOR GROUP 5 Building
ENGI0014-002 (BUILDING & RESIDENTIAL) COMPRESSORS, WELDING MACHINES (CUTTING CONCRETE WORK), PAINT SPRAYING, SAND BLASTING, PUMPS (WITH THE EXCLUSION OF CONCRETE PUMPS), HOUSE CAR (SETTLEMENT BASIS ONLY), ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILIARY EQUIPMENT, AIR, HYDRAULIC, ETC., BOILERS DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$54.12 $38.95 $93.07
POWER EQUIPMENT OPERATOR GROUP 5 Building
ENGI0015-001 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) SHOVELS, CRANES (DRAGLINES), BACKHOES, PAVERS, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$44.45 $38.00 $82.45
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES Building
ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$117.60 $38.95 $156.55
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES Building
ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$117.60 $38.95 $156.55
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS Building
ENGI0014-001 (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$81.38 $38.95 $120.33
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS Building
ENGI0014-001 (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$81.38 $38.95 $120.33
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS Building
ENGI0014-001 (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$61.87 $38.95 $100.82
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS Building
ENGI0014-001 (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$61.87 $38.95 $100.82
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS Building
ENGI0014-001 (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$57.52 $38.95 $96.47
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS Building
ENGI0014-001 (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$57.52 $38.95 $96.47
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES Building
ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$100.18 $38.95 $139.13
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES Building
ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$100.18 $38.95 $139.13
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES Building
ENGI0014-001 (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$97.75 $38.95 $136.70
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES Building
ENGI0014-001 (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$97.75 $38.95 $136.70
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES Building
ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$93.74 $38.95 $132.69
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES Building
ENGI0014-001 (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$93.74 $38.95 $132.69
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS Building
ENGI0014-001 (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$91.04 $38.95 $129.99
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS Building
ENGI0014-001 (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$91.04 $38.95 $129.99
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE Building
ENGI0014-001 (OTHER THAN ABOVE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$88.72 $38.95 $127.67
POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE Building
ENGI0014-001 (OTHER THAN ABOVE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS
$88.72 $38.95 $127.67
ROOFER Building
ROOF0008-003
$50.25 $32.62 $82.87
SHEET METAL WORKER (BUILDING CONSTRUCTION) Building
SHEE0028-002
$53.60 $60.74 $114.34
SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) Building
SHEE0028-002
$35.79 $25.37 $61.16
TERRAZZO FINISHER Building
BRNY0007-001
$49.59 $34.25 $83.84
TERRAZZO WORKER/SETTER Building
BRNY0007-001
$64.62 $37.63 $102.25
TILE FINISHER Building
BRNY0007-002
$49.59 $34.25 $83.84
TILE LAYER Building
BRNY0052-001
$64.40 $37.13 $101.53
TRUCK DRIVER EUCLIDS & TURNAPULLS Building
TEAM0282-001 (FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK.)
$49.38 $57.65 $107.03
TRUCK DRIVER: ASPHALT Building
TEAM0282-001 (FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK.)
$46.12 $59.65 $105.77
TRUCK DRIVER: HIGH RISE Building
TEAM0282-001 (FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK.)
$65.43 $53.15 $118.58

Wage Determinations

Heavy

7 trades

Applies to

Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more

Building, Heavy, Highway, Residential

116 trades

Applies to

Bronx, Kings, New York, Queens, Richmond