Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0012-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 |
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 |
ASBE0012-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 |
| HAZARDOUS MATERIAL HANDLER | $47.75 | $13.70 | $61.45 |
| ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 |
BRNY0001-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MASON - STONE | $69.91 | $44.02 | $113.93 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 |
| MASON - STONE | $69.91 | $44.02 | $113.93 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 |
BRNY0001-001 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MASON - STONE | $69.91 | $44.02 | $113.93 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 |
| MASON - STONE | $69.91 | $44.02 | $113.93 |
| BRICKLAYER | $67.39 | $35.90 | $103.29 |
BRNY0001-002 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POINTER, CLEANER AND CAULKER | $63.69 | $32.42 | $96.11 |
BRNY0004-001 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MARBLE MASON | $63.92 | $40.20 | $104.12 |
BRNY0007-001 Effective 12/02/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TERRAZZO WORKER/SETTER | $64.62 | $37.63 | $102.25 |
| TERRAZZO FINISHER | $49.59 | $34.25 | $83.84 |
BRNY0007-002 Effective 12/02/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE FINISHER | $49.59 | $34.25 | $83.84 |
BRNY0020-001 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MARBLE FINISHER | $49.99 | $37.54 | $87.53 |
BRNY0024-001 Effective 06/03/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER (MARBLE POLISHERS) | $52.32 | $36.25 | $88.57 |
BRNY0052-001 Effective 06/03/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE LAYER | $64.40 | $37.13 | $101.53 |
CARP0020-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, BUILDING & RESIDENTIAL (RICHMOND COUNTY) | $59.05 | $48.08 | $107.13 |
CARP0020-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER: HEAVY & HIGHWAY (RICHMOND COUNTY) | $61.59 | $55.84 | $117.43 |
CARP0045-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, BUILDING & RESIDENTIAL (QUEENS COUNTY) | $59.05 | $48.08 | $107.13 |
CARP0045-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER: HEAVY & HIGHWAY (QUEENS COUNTY) | $61.59 | $55.84 | $117.43 |
CARP0157-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, BUILDING & RESIDENTIAL (BRONX AND NEW YORK COUNTIES) | $59.05 | $48.08 | $107.13 |
CARP0157-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER: HEAVY & HIGHWAY (BRONX AND NEW YORK COUNTIES) | $61.59 | $55.84 | $117.43 |
CARP0740-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $60.83 | $58.03 | $118.86 |
CARP0926-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, BUILDING & RESIDENTIAL (KINGS COUNTY) | $59.05 | $48.08 | $107.13 |
CARP0926-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER: HEAVY & HIGHWAY (KINGS COUNTY) | $61.59 | $55.84 | $117.43 |
CARP1556-006 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 |
CARP1556-007 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| DIVER TENDER | $55.00 | $55.84 | $110.84 |
| DIVER | $75.46 | $55.84 | $131.30 |
CARP1556-011 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTERS: (TIMBERMEN) | $55.59 | $55.41 | $111.00 |
CARP2287-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTERS: (SOFT FLOOR LAYERS) | $59.05 | $48.08 | $107.13 |
ELEC0003-001 Effective 04/10/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (JOBBING, AND MAINTENANCE AND REPAIR WORK) PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $32.00 | $27.16 | $59.16 |
ELEC1049-001 Effective 03/30/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: LINEMAN AND CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $70.57 | $39.19 | $109.76 |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $56.46 | $34.63 | $91.09 |
| LINE CONSTRUCTION: GROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT; QUEENS COUNTY) | $42.34 | $30.05 | $72.39 |
ELEV0001-002 Effective 03/17/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELEVATOR MECHANIC: MODERNIZATION AND REPAIR (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED.) | $59.09 | $45.56 | $104.65 |
| ELEVATOR MECHANIC: ELEVATOR CONSTRUCTOR (FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED.) | $75.14 | $47.45 | $122.59 |
ENGI0014-001 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.52 | $38.95 | $96.47 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $61.87 | $38.95 | $100.82 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $81.38 | $38.95 | $120.33 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE (OTHER THAN ABOVE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $88.72 | $38.95 | $127.67 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $91.04 | $38.95 | $129.99 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $93.74 | $38.95 | $132.69 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.75 | $38.95 | $136.70 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $100.18 | $38.95 | $139.13 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $117.60 | $38.95 | $156.55 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.52 | $38.95 | $96.47 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $61.87 | $38.95 | $100.82 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $81.38 | $38.95 | $120.33 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE (OTHER THAN ABOVE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $88.72 | $38.95 | $127.67 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $91.04 | $38.95 | $129.99 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $93.74 | $38.95 | $132.69 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.75 | $38.95 | $136.70 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $100.18 | $38.95 | $139.13 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $117.60 | $38.95 | $156.55 |
ENGI0014-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.52 | $38.95 | $96.47 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $61.87 | $38.95 | $100.82 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $81.38 | $38.95 | $120.33 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE (OTHER THAN ABOVE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $88.72 | $38.95 | $127.67 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $91.04 | $38.95 | $129.99 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $93.74 | $38.95 | $132.69 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.75 | $38.95 | $136.70 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $100.18 | $38.95 | $139.13 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $117.60 | $38.95 | $156.55 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 15 BOILERS (HIGH PRESSURE, COMPRESSORS (PORTABLE, SINGLE, OR 2 IN BATTERY, NOT OVER 100' APART), PUMPS (RIVER COFFERDAM AND WELDING MACHINES (EXCEPT WHERE ARC IS OPERATED BY MEMBERS OF LOCAL 15) PUSH BUTTON MACHINES, ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILLIARY EQUIPMENT, AIR, HYDRAULIC ETC. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.52 | $38.95 | $96.47 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 14 COMPRESSORS (PORTABLE 3 OR MORE IN BATTERY), TUGGER MACHINE (CAISSONS), WELL POINT PUMPS, CHUM DRILL LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $61.87 | $38.95 | $100.82 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 12 CONCRETE BREAKING MACHINE, HOISTS (SINGLE DRUM), LOAD MASTERS, LOCOMOTIVE AND DINKIES OVER 10 LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $81.38 | $38.95 | $120.33 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 9 CONCRETE PLANTS, WELL DRILLING MACHINES, STONE CRUSHERS DOUBLE DRUM HOIST, POWER HOUSE (OTHER THAN ABOVE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $88.72 | $38.95 | $127.67 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 8 MIXERS (CONCRETE W/LOADING ATTACHMENTS), CONCRETE PAVERS, CABLEWAYS, LAND DERRICKS, POWER HOUSE (LOW PRESSURE UNITS), CONCRETE PUMPS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $91.04 | $38.95 | $129.99 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 7 BACK FILLING MACHINES, CRANES, MUCKING MACHINES, DUAL DRUM PAVERS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $93.74 | $38.95 | $132.69 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4 GRADALLS, KEYSTONES, CRANES (WITH DIGGING BUCKETS), BRIDGE CRANES, TRENCHING MACHINES, VERMEER CUTTER AND MACHINES OF A SIMILAR NATURE REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.75 | $38.95 | $136.70 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 MINE HOISTS AND CRANE, ETC. USED AS MINE HOISTS REMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $100.18 | $38.95 | $139.13 |
| POWER EQUIPMENT OPERATOR, PAVEMENT-HEAVY & HIGHWAY: POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1 TOWER CRANE PREMIUMS ON CRANES (CRAWLER OR TRUCK): 100' TO 149' BOOM - ADD .50 150' TO 249' BOOM - ADD .75 250' TO 349' BOOM - ADD 1.00 350' TO 450' BOOM - ADD 1.50 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; WASHINGTON'S BIRTHDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY; PROVIDED THE EMPLOYEE WORKS ONE DAY THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $117.60 | $38.95 | $156.55 |
ENGI0014-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING & RESIDENTIAL) COMPRESSORS, WELDING MACHINES (CUTTING CONCRETE WORK), PAINT SPRAYING, SAND BLASTING, PUMPS (WITH THE EXCLUSION OF CONCRETE PUMPS), HOUSE CAR (SETTLEMENT BASIS ONLY), ALL ENGINES IRRESPECTIVE OF POWER (POWER PAC) USED TO DRIVE AUXILIARY EQUIPMENT, AIR, HYDRAULIC, ETC., BOILERS DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $54.12 | $38.95 | $93.07 |
| POWER EQUIPMENT OPERATOR GROUP 4 (BUILDING & RESIDENTIAL) FORK LIFT, HOUSE CARS, PLASTER (PLATFORM MACHINE), PLASTER BUCKET, CONCRETE PUMP AND ALL OTHER EQUIPMENT USED FOR HOISTING MATERIAL LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $72.46 | $38.95 | $111.41 |
| POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING & RESIDENTIAL) 4 POLE HOIST, SINGLE DRUM HOISTS LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $79.70 | $38.95 | $118.65 |
| CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING & RESIDENTIAL) STONE DERRICK, CRANES, HYDRAULIC 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $97.79 | $38.95 | $136.74 |
| CRANES, BOOM TRUCKS PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING & RESIDENTIAL) DOUBLE DRUM FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $92.32 | $38.95 | $131.27 |
ENGI0015-001 Effective 07/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) SHOVELS, CRANES (DRAGLINES), BACKHOES, PAVERS, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $44.45 | $38.00 | $82.45 |
| MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY AND HIGHWAY) OILERS FOR THE FOLLOWING EQUIPMENT: (ALL GASOLINE, ELECTRIC, DIESEL, OR AIR OPERATED) GRADALLS AND CONCRETE PUMPS OR SIMILARLY EQUIPMENT 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $64.82 | $38.00 | $102.82 |
| MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY AND HIGHWAY) MINOR EQUIPMENT SUCH AS TRACTORS, POST HOLE DIGGERS AND DRIVERS, DITCH WITCH (WALK BEHIND), ROAD FINISHING MACHINES, ROLLERS (FIVE (5) TONS AND UNDER), TUGGER HOISTS, DUAL PURPOSE TRUCKS, FORK LIFTS AND DEMPSEY DUMPSTERS PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $68.62 | $38.00 | $106.62 |
| MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY AND HIGHWAY) CHERRYPICKERS 20 TONS AND OVER AND LOADERS (RUBBER-TIRED AND/OR TRACTOR TYPE WITH A MANFUFACTURER'S RATED CAPACITY OF SIX CUBIC YARDS AND OVER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $74.65 | $38.00 | $112.65 |
| MANNED BY TWO-MEN PREMIUMS FOR CRANES: POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY AND HIGHWAY) RUBBER TIRE BACKHOES UP TO AND INCLUDING 37,000 LBS, BASIN MACHINES, GROOVER, MECHANICAL SWEEPERS, BOBCAT, BOOM TRUCK, BARRIER TRANSPORT (BARRIER MOVER) AND MACHINES OF A SIMILAR NATURE, BOAT CAPTAINS, BOAT OPERATORS, OPERATION OF CHURN DRILLS AND MACHINES OF A SIMILAR NATURE, STETCO SILENT HOIST AND MACHINES OF A SIMILAR NATURE, VAC-ALLS, MEYERS MACHINES, JOHN BEAM AND MACHINES OF A SIMILAR NATURE, ROSS CARRIERS AND TRAVEL LIFTS AND MACHINES OF A SIMILAR NATURE, BULLDOZERS, SCRAPERS, AND TURN-A PULLS, TUGGER HOIST (USED EXCLUSIVELY FOR HANDLING EXCAVATED MATERIAL), TRACTORS WITH ATTACHMENTS, HYSTER AND ROUSTABOUT CRANES, CHERRYPICKERS, AUSTIN WESTERN, GROVE AND MACHINES OF A SIMILAR NATURE, SCOOPMOBILES, MONORAILS, CONVEYORS, TRENCHERS, LOADERS- RUBBER-TIRED AND TRACTOR, BARBER GREENE, EIMCO LOADERS AND EIMCO BACKHOES, MIGHTY MIDGET AND SIMILAR BREAKERS AND TAMPERS, CURB AND GUTTER PAVERS AND MOTOR PATROL, MOTOR GRADERS AND ALL MACHINES OF A SIMILAR NATURE, LOCOMOTIVES TEN (10) TONS OR UNDER, MINI-MAX, BREAK-TECH AND MACHINES OF A SIMILAR NATURE, MILLING MACHINES, ROBOTIC AND DEMOLITION MACHINES AND MACHINES OF A SIMILAR NATURE INCLUDING BOBCAT, PILE RIG RUBBER-TIRED EXCAVATOR (37,000 LBS. AND UNDER), 2 MAN AUGER PREMIUMS FOR CRANES: 100'-149' BOOM - ADD 1.75 150'-249' BOOM - ADD 2.00 250'-349' BOOM - ADD 2.25 350'-450' BOOM - ADD 2.75 TOWER CRANES ADD 2.00 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $72.40 | $38.00 | $110.40 |
ENGI0015-002 Effective 07/01/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING) GRADALLS: CONCRETE PUMPS, POWER HOUSES - ALL EQUIPMENT IN SAME IS MANNED BY TWO (2) MEN ONLY, DRIVING TRUCK CRANES FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $57.42 | $32.95 | $90.37 |
| POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING) OILERS ON CRAWLER CRANES, BACKHOES, TRENCHING MACHINES, GUNITE MACHINES, COMPRESSORS (3 OR MORE IN BATTERY) LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $63.98 | $32.95 | $96.93 |
| POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING) OILER LINCOLN'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE PAYROLL WEEK IN WHICH THE HOLIDAY OCCURS | $65.94 | $32.95 | $98.89 |
IRON0040-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL (BRONX, NEW YORK, RICHMOND) | $58.95 | $92.02 | $150.97 |
IRON0046-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: METALLIC LATHERS AND REINFORCING IRONWORKERS | $57.00 | $32.96 | $89.96 |
IRON0197-001 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STONE DERRICKMAN | $60.40 | $60.14 | $120.54 |
IRON0361-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKERS: STRUCTURAL (KINGS, QUEENS) | $58.95 | $92.02 | $150.97 |
IRON0580-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL | $48.15 | $67.62 | $115.77 |
LABO0006-001 Effective 07/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (CEMENT AND CONCRETE WORKERS) | $49.28 | $27.05 | $76.33 |
LABO0078-001 Effective 01/06/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: ASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) | $41.15 | $20.90 | $62.05 |
LABO0079-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABOERE, BUILDING CONSTRUCTION: MASON TENDER/GENERAL LABORER | $44.70 | $29.55 | $74.25 |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS (INTERIOR) (Tier A- RESPONSIBLE FOR THE REMOVAL OF ALL INTERIOR PETITIONS AND STRUCTURAL PETITIONS THAT CN CONSIST OF SHEET ROCK, BLOCK OR MASONRY. ALSO, ALL STRUCTURAL SLAB OPENINGS AND EXTERIOR WALLS WHERE THE BUILDING IS NOT BEING COMPLETELY DEMOLITIONED.) | $40.22 | $25.17 | $65.39 |
| LABORER, BUILDING CONSTRUCTION: DEMOLITION LABORERS (INTERIOR) (Tier B- RESPONSIBLE FOR SHOVELING OF DEBRIS INTO CONTAINER, PUSHING CONTAINERS FROM THE INSIDE TO THE OUTSIDE OF THE BIULDING) | $29.29 | $20.29 | $49.58 |
LABO0147-001 Effective 07/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: FREE AIR & TUNNEL (MAINTENANCE MEN, INSIDE MUCK LOCK TENDERS, PUMP MEN, ELECTRICIANS, CEMENT FINISHERS, CAULKERS, HYDRAULIC MEN, SHIELD MEN, MONORAIL OPERATORS, MOTOR MEN, CONVEYOR MEN, POWDER CARRIERS, PAN MEN, RIGGERS, CHUCK TENDERS, TRACK MEN PAINTERS, NIPPERS, BRAKEMEN, CABLE MEN, HOSE MEN, GROUT MEN, GRAVEL MEN, FORM WORKERS, CONCRETE WORKERS, TUNNEL LABORERS, MOLE NIPPER (ONE (1) MOLE SIPPER PER WORKING SHAFT PER SHIFT FOR UP TO AND INCLUDING TWO (2) MOLES) | $64.08 | $54.00 | $118.08 |
LABO0731-001 Effective 07/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION UTILITY LABORER (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY) | $44.35 | $52.08 | $96.43 |
| LABORER BUILDING, HEAVY AND RESIDENTIAL CONSTRUCTION LABORER: (ASBESTOS, LEAD, HAZARDOUS WASTE REMOVAL (INCLUDING SOIL)/CEMENT/CONCRETE (PAID HOLIDAYS: LABOR DAY AND THANKSGIVING DAY) | $44.50 | $52.08 | $96.58 |
LABO0731-002 Effective 07/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS:, HEAVY (JACKHAMMERS, CHIPPERS, SPADERS, CONCRETE BREAKERS, ALL OTHER PNEUMATIC TOOLS, WALK BEHIND SELF-PROPELLED HYDRAULIC ASPHALT AND CONCRETE BREAKER) | $44.50 | $52.08 | $96.58 |
| LABORERS: HEAVY (POWDER CARRIERS) | $44.50 | $52.08 | $96.58 |
| LABORERS: HEAVY (HYDRAULIC TRAC DRILL) | $51.85 | $52.08 | $103.93 |
| LABORERS: HEAVY (BLASTERS) | $57.71 | $52.08 | $109.79 |
| LABORERS: HEAVY (BLASTERS (HYDRAULIC TRAC DRILL)) | $51.85 | $52.08 | $103.93 |
LABO1010-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: SMALL POWER TOOLS OPERATOR (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 |
| LABORERS: SMALL EQUIPMENT OPERATOR (NOT OPERATING ENGINEER) (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 |
| LABORERS: SLURRY/SEALCOATER/PLAY EQUIPMENT INSTALLER (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 |
| LABORERS: MAINTENANCE SAFETY SURFACE (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 |
| LABORERS: LANDSCAPE PLANTING & MAINTENANCE (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 |
| LABORERS: LABORERS (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 |
| LABORERS: FORMSETTERS (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $50.80 | $54.04 | $104.84 |
| LABORERS: FENCE INSTALLER & REPAIRER (HIGHWAY CONSTRUCTION) (FOOTNOTES: A. PAID HOLIDAYS: MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, COLUMBUS DAY, ELECTION DAY AND THANKSGIVING DAY, PROVIDED THE EMPLOYEE HAS WORKED ONE (1) DAY IN THE CALENDAR WEEK IN WHICH THE SAID HOLIDAY OCCURS.) | $46.33 | $54.04 | $100.37 |
LABO1010-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS-ASPHALT CONSTRUCTION: SMALL EQUIPMENT OPERATOR (ASPHALT) | $46.33 | $54.05 | $100.38 |
| LABORERS-ASPHALT CONSTRUCTION: SHOVELER (PRODUCTION PAVING ONLY) | $46.33 | $54.05 | $100.38 |
| LABORERS-ASPHALT CONSTRUCTION: SCREEDPERSON | $50.80 | $54.05 | $104.85 |
| LABORERS-ASPHALT CONSTRUCTION: RAKER | $50.20 | $54.05 | $104.25 |
| LABORERS-ASPHALT CONSTRUCTION: MICRO PAVER | $50.80 | $54.05 | $104.85 |
PAIN0009-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (SPRAY, SCAFFOLD AND SANDBLASTING) | $47.75 | $44.11 | $91.86 |
| PAINTER (PAINTERS, DRYWALL FINISHERS, LEAD ABATEMENT WORKER) | $44.75 | $44.11 | $88.86 |
| GLAZIER | $49.20 | $57.20 | $106.40 |
PAIN0806-001 Effective 10/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS (STRUCTURAL STEEL AND BRIDGE) | $56.25 | $55.14 | $111.39 |
PAIN1974-001 Effective 06/28/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTERS (DRYWALL TAPERS/POINTERS) | $48.47 | $35.91 | $84.38 |
PLAS0262-001 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $48.51 | $32.78 | $81.29 |
PLAS0262-002 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER (KINGS AND QUEENS COUNTIES) | $48.51 | $32.78 | $81.29 |
PLAS0780-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $59.87 | $41.81 | $101.68 |
PLUM0001-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER: MECHANICAL EQUIPMENT AND SERVICE (ANY REPAIR AND/OR REPLACEMENT OF THE PRESENT PLUMBING SYSTEM THAT DOES NOT CHANGE THE EXISTING ROUGHING) | $48.90 | $22.26 | $71.16 |
| PLUMBER | $73.00 | $32.81 | $105.81 |
PLUM0638-001 Effective 01/01/2026 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER: SPRINKLER FITTERS, STEAMFITTERS | $70.36 | $54.24 | $124.60 |
| PLUMBER: SERVICE FITTERS (SERVICE FITTER WORK SHALL CONSIST OF ALL REPAIR, SERVICE AND MAINTENANCE WORK ON DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS ETC., INCLUDING BUT NOT EXCLLUSIVLY FOR CHARGING, EVACUATION, LEAK TESTING AND ASSEMBLING FOR ALL MACHINES FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION, AIR CONDITIONING AND HEATING APPARATUS. ALSO, WORK SHALL INCLUDE ADJUSTING, INCLUDING CAPACITY ADJUSTMENTS, CHECKING AND REPAIRING OR REPLACEMENT OF ALL CONTROLS AND START UP OF ALL MACHINES AND REPAIRING ALL DEFECTS THAT MAY DEVELOP ON ANY SYSTEM FOR DOMESTIC, COMMERCIAL AND INDUSTRIAL REFRIGERATION AND ALL AIR CONDITINIONG, AIR COOLING, STOKER AND OIL BURNER APPARATUS AND HEATING APPARATUS REGARDLESS OF SIZE OR TYPE.) | $47.85 | $23.96 | $71.81 |
ROOF0008-003 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $50.25 | $32.62 | $82.87 |
SHEE0028-002 Effective 11/02/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) | $35.79 | $25.37 | $61.16 |
| SHEET METAL WORKER (BUILDING CONSTRUCTION) | $53.60 | $60.74 | $114.34 |
TEAM0282-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: HIGH RISE (FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK.) | $65.43 | $53.15 | $118.58 |
| TRUCK DRIVER: ASPHALT (FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK.) | $46.12 | $59.65 | $105.77 |
| TRUCK DRIVER EUCLIDS & TURNAPULLS (FOOTNOTES: PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, VETERANS' DAY (ARMISTICE DAY), THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY. EMPLOYEES WORKING TWO (2) DAYS IN THE CALENDAR WEEK IN WHICH A HOLIDAY FALLS ARE TO BE PAID FOR SUCH HOLIDAY, PROVIDED THAT THEY SHAPE EACH REMAINING WORKDAY DURING SUCH CALENDAR WEEK.) | $49.38 | $57.65 | $107.03 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
| 3 | 05/21/2026 |
| 4 | 05/26/2026 |
Counties Covered
This wage determination applies to 5 counties in New York.
Get notified when NY20260003 is modified
This determination has been revised 4 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.