NY20260001
rev 2Heavy
7 trades
Applies to
Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Suffolk County, New York are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR Building ASBE0012-001 (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 | |
| ASBESTOS WORKERS/INSULATOR Building ASBE0012-001 (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $71.76 | $36.81 | $108.57 | |
| BRICKLAYER Building BRNY0001-001 Scope differs by code/WD | $67.39 | $35.90 | $103.29 | |
| BRICKLAYER Building BRNY0001-001 Scope differs by code/WD | $67.39 | $35.90 | $103.29 | |
| CARPENTER (SOFT FLOOR LAYERS) Building CARP2287-003 | $59.05 | $48.08 | $107.13 | |
| CARPENTERS: (DIVERS TENDERS) Building CARP1556-008 | $55.00 | $55.84 | $110.84 | |
| CARPENTERS: (DOCKBUILDERS) Building CARP1556-008 | $60.59 | $55.84 | $116.43 | |
| CARPENTERS: (HEAVY & HIGHWAY) Building CARP0290-001 | $53.56 | $34.28 | $87.84 | |
| CARPENTERS: (PILEDRIVERMAN) Building CARP1556-008 | $60.59 | $55.84 | $116.43 | |
| CARPENTERS: (RESIDENTIAL) Building CARP0290-001 | $34.14 | $23.15 | $57.29 | |
| CARPENTERS: (TIMBERMEN) Building CARP1556-011 | $55.59 | $55.41 | $111.00 | |
| CARPENTERS: DIVERS Building CARP1556-008 | $75.46 | $55.84 | $131.30 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0780-001 | $59.87 | $41.81 | $101.68 | |
| DREDGING: CLASS A1: DECK CAPTAIN; MECHANICAL DREDGE OPERATOR, LEVERMAN, LICENSED TUG OPERATOR OVER 1000 HP. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $48.48 | $15.34 | $63.82 | |
| DREDGING: CLASS A2: CRANE OPERATOR Heavy ENGI0025-001 (360 SWING) INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $43.20 | $14.99 | $58.19 | |
| DREDGING: CLASS B1: DERRICK OPERATOR Heavy ENGI0025-001 (180 SWING), SPIDER/SPILL BARGE OPERATOR, ENGINEER, ELECTRICIAN, CHIEF WELDER, CHIEF MATE, FILL PLACER, OPERATOR II, MAINTENANCE ENGINEER, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. INCENTIVE PAY: (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $41.93 | $14.90 | $56.83 | |
| DREDGING: CLASS B2: CERTIFIED WELDER. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $39.46 | $14.73 | $54.19 | |
| DREDGING: CLASS C1: MATE, DRAG BARGE OPERATOR, ASSISTANT FILL PLACER, WELDER, STEWARD. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $38.38 | $14.66 | $53.04 | |
| DREDGING: CLASS C2: BOAT OPERATOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY) USCG $1.55; DECKHAND OR MATE (AB WITH LIFEBOATMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $37.15 | $14.57 | $51.72 | |
| DREDGING: CLASS D: OILER, DECKHAND, SHOREMAN, RODMAN, SCOWMAN, COOK, MESSMAN, PORTER/JANITOR. INCENTIVE PAY: Heavy ENGI0025-001 (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80 LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) (USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) $1.80 OILER (QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (TANKERMAN ENDORSEMENT ONLY) USCG ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS (LIFEBOATMAN ENDORSEMENT ONLY (USCG) $1.55; WELDER (ABS CERTIFICATION) $1.55 FOOTNOTES APPLICABLE TO ABOVE CRAFTS: A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. VACATION: EIGHT PERCENT (8%) OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED | $30.86 | $14.15 | $45.01 | |
| ELECTRICIAN Building ELEC0025-001 | $64.55 | $47.40 | $111.95 | |
| ELECTRICIANS: (MAINTENANCE UNIT) Building ELEC0025-002 | $49.79 | $32.27 | $82.06 | |
| ELECTRICIANS: (TELEPHONE UNIT) Building ELEC0025-002 | $42.93 | $32.43 | $75.36 | |
| ELEVATOR MECHANIC Building ELEV0001-002 (MODERNIZATION AND REPAIR) GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED | $59.09 | $45.56 | $104.65 | |
| ELEVATOR MECHANIC Building ELEV0001-002 (ELEVATOR CONSTRUCTOR) GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED | $75.14 | $47.45 | $122.59 | |
| HAZARDOUS MATERIAL HANDLER Building ASBE0012-001 Scope differs by code/WD | $47.75 | $13.70 | $61.45 | |
| HAZARDOUS MATERIAL HANDLER Building ASBE0012-001 Scope differs by code/WD | $47.75 | $13.70 | $61.45 | |
| IRONWORKER Building IRON0046-003 (METALLIC LATHERS AND REINFORCING IRONWORKERS) | $57.00 | $32.96 | $89.96 | |
| IRONWORKER (STONE DERRICKMAN) Building IRON0197-001 | $60.40 | $60.14 | $120.54 | |
| IRONWORKER: ORNAMENTAL Building IRON0580-001 | $48.15 | $67.62 | $115.77 | |
| IRONWORKER: STRUCTURAL Building IRON0361-001 | $58.95 | $92.02 | $150.97 | |
| LABORERS (BUILDING) Building LABO0066-001 | $42.55 | $34.79 | $77.34 | |
| LABORERS: ASBESTOS Building LABO0078-001 (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) | $41.15 | $20.90 | $62.05 | |
| LABORERS: ASPHALT RAKERS; FORMSETTERS Building LABO1298-001 (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM | $51.43 | $35.98 | $87.41 | |
| LABORERS: ASPHALT SHOVELERS, ROLLER BOYS & TAMPERS Building LABO1298-001 (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM | $49.96 | $35.98 | $85.94 | |
| LABORERS: PLASTERERS TENDERS (BUILDING) Building LABO0066-001 | $42.55 | $34.79 | $77.34 | |
| LABORERS: REGULAR LABORERS Building LABO1298-001 (HEAVY & HIGHWAY) A. MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM | $45.49 | $35.98 | $81.47 | |
| LINE CONSTRUCTION: GROUNDMAN Building ELEC1049-002 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $42.34 | $30.05 | $72.39 | |
| LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR Building ELEC1049-002 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $56.46 | $34.63 | $91.09 | |
| LINE CONSTRUCTION: LINEMAN & CABLE SPLICER Building ELEC1049-002 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $70.57 | $39.19 | $109.76 | |
| LINE CONSTRUCTION: MATERIAL MAN Building ELEC1049-002 (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) | $61.40 | $36.24 | $97.64 | |
| MASON - STONE Building BRNY0001-001 Scope differs by code/WD | $69.91 | $44.02 | $113.93 | |
| MASON - STONE Building BRNY0001-001 Scope differs by code/WD | $69.91 | $44.02 | $113.93 | |
| MILLWRIGHT Building CARP0740-001 | $60.83 | $58.03 | $118.86 | |
| PAINTER (GLAZIERS) Building PAIN0009-002 | $49.20 | $57.20 | $106.40 | |
| PAINTER (PAINTERS, DRYWALL FINISHERS) Building PAIN0009-002 | $44.75 | $44.11 | $88.86 | |
| PAINTER (SPRAY, SCAFFOLD, SANDBLASTING) Building PAIN0009-002 | $47.75 | $44.11 | $91.86 | |
| PAINTERS: (DRYWALL TAPERS/POINTERS) Building PAIN1974-002 | $48.47 | $35.91 | $84.38 | |
| PAINTERS: (STUCTURAL STEEL AND BRIDGE) Building PAIN0806-010 | $56.25 | $55.14 | $111.39 | |
| PLASTERER Building PLAS0262-003 | $48.51 | $32.78 | $81.29 | |
| PLUMBER (BUILDING CONSTRUCTION:) Building PLUM0200-001 | $60.73 | $45.75 | $106.48 | |
| PLUMBER (RESIDENTIAL CONSTRUCTION:) Building PLUM0200-001 | $36.05 | $19.63 | $55.68 | |
| PLUMBER, SERVICE FITTERS Building PLUM0638-001 | $47.85 | $23.96 | $71.81 | |
| POWER EQUIPMENT OPERATORS: GROUP 1 Building ENGI0138-001 (BUILDING CONSTRUCTION) ASPHALT SPREADER, BACKHOE CRAWLER CAPACITY OVER CATER- PILLER 225 AND LOMATSU 300, BOILER (THERMOPLASTIC), CHERRY PICKER, OVER 50 TONS, CMI OR MAXIM SPREADER, CONCRETE PUMP (WITH OILER), CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING), CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUM), LOADING MACHINE (BUCKET) CAP OF 10 YDS OR OVER MICRO-TRAP, WITH COMPRESSOR (NEGATIVE AIR MACHINE), MILLING MACHINE, LARGE PILE DRIVER, POWER WINCH, STONE SETTING/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED/STONE STEEL) POWERHOUSE, ROAD PAVER SCOOP, CARRY-ALL, SCRAPER IN TANDEM SHOVEL, SIDEBOOM TRACTOR, SIDEBOOM TRACTOR (USED IN TANK WORK), STONE SPREADER (SELF PROPELLED TANK WORK), ZAMBONI (ICE MACHINE) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY | $80.43 | $39.99 | $120.42 | |
| POWER EQUIPMENT OPERATORS: GROUP 2 Building ENGI0138-001 (BUILDING CONSTRUCTION) BACKHOE, BOOM TRUCK, BULLDOZER, CHERYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST, 2 DRUM, LOADING MACHINE, LOADING MACHINE (FRONT END) MECHANICAL COMPACTORS, (MACHINE DRAWN), MULCH MACHINE (MACHINE-FED), MECHANIC, POWER WINCH, OTHER THAN STONE/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED OTHER THAN STONE STEEL) PUMP (HYDRAULIC, WITH BORING MACHINE), ROLLER, (ASPHALT), SCOOP (CARRY-ALL SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY | $76.44 | $39.99 | $116.43 | |
| POWER EQUIPMENT OPERATORS: GROUP 3 Building ENGI0138-001 (BUILDING CONSTRUCTION) COMRPESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE IN BATTERY), CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE (ASPHALT OR CONCRETE), CURING MACHINE, FIREMAN, HOIST (1 DRUM), MICRO-TRAP, (SELF CONTAINED, NEGATIVE AIR MACHINE), PUMP (4 INCHES OR OVER), PUMP (HYDRAULIC), PUMP (JET), PUMP (SUMBERSIBLE), PUMP (WELL POINT), PULVI-MIXER, RIDGE CUTTER, ROLLER (DIRT), STRIPING MACHINE, VAC-ALL, WELDING AND BURNING, WELDING MACHINE (PILE WORK), WELDING MACHINE (STRUCTURAL STEEL) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY | $73.78 | $39.99 | $113.77 | |
| POWER EQUIPMENT OPERATORS: GROUP 4 Building ENGI0138-001 (BUILDING CONSTRUCTION) COMPRESSOR, COMPRESSOR (ON CRANE), COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORKLIFT (WALK BEHIND, POWER OPERATED), GENERATOR-PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, PUMP (DOUBLE ACTION DIAPHGRGM), PUMP (GYPSUM), TRENCH MACHINE (HAND), WELDING MACHINE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY | $56.54 | $39.99 | $96.53 | |
| POWER EQUIPMENT OPERATORS: GROUP 5 Building ENGI0138-001 (BUILDING CONSTRUCTION) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACTOR (CATERPILLAR OR WHEEL VIBRATOR) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY | $54.21 | $39.99 | $94.20 | |
| POWER EQUIPMENT OPERATORS: GROUP 5 Building ENGI0138-002 (HEAVY & HIGHWAY) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), GRINDER, MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACK TAMPER (2 ENGINEERS, EACH), TRACTOR (CATERPILLAR OR WHEEL), VIBRATOR, WORK BOAT (DECKHAND), NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY | $56.55 | $40.15 | $96.70 | |
| POWER EQUIPMENT OPERATORS: GROUP 6 Building ENGI0138-002 (HEAVY & HIGHWAY) WELL DRILLERS NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY | $44.37 | $12.95 | $57.32 | |
| ROOFER Building ROOF0154-001 | $51.25 | $47.36 | $98.61 | |
| SHEET METAL WORKER (BUILDING CONSTRUCTION) Building SHEE0028-002 | $53.60 | $60.74 | $114.34 | |
| SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) Building SHEE0028-002 | $35.79 | $25.37 | $61.16 | |
| TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: POWER EQUIPMENT OPERATORS: GROUP 1 Building ENGI0138-002 (HEAVY & HIGHWAY) ASPHALT SPREADER, BACKHOE CRAWLER (CAPACITY OVER CATERPILLER 225 AND KOMATSU 300), BOILER (THERMOPLASTIC), BORING MACHINE (POST HOLE), CGHERRY PICKER (OVER 50 TON), CMI OR MAXIM SPREADER, CONCRETE PUMP, WITH OILER, CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING) CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUMS), LOADING MACHINE (BUCKET) CAPACITY OF 10 YARDS OR OVER, MICRO-TRAP (WITH COMPRESSOR-NEGATIVE AIR MACHINE), MILLING MACHINE (LARGE), PILEDRIVER, POWER WINCH (STONE SETTING STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/STONE STEEL), POWER-HOUSE, ROAD PAVER, SCOOP, CARRY ALL (SCRAPER IN TANDEM), SHOVEL, SIDEBOOM TRACTOR, SIDEBOOM TRACTOR (USED IN TANK WORK), STONE SPREADER (SELF-PROPELLED), TANK WORK, TOWER CRANE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY | $84.70 | $40.15 | $124.85 | |
| TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: POWER EQUIPMENT OPERATORS: GROUP 2 Building ENGI0138-002 (HEAVY & HIGHWAY) BULLDOZER, BACKHOE, BOOM TRUCK, BORING MACHINE/AUGUR, CHERRYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST (2 DRUM), LOADING MACHINE, LOADING MACHINE (FRONT END), MECHANICAL COMPACTOR (MACHINE DRAWN), MECHANIC, MULCH MACHINE (MACHINE- FED), POWER WINCH (OTHER THAN STONE/STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/OTHER THAN STONE STEEL), PUMP HYDRAULIC (WITH BORING MACHINE), ROLLER (ASPHALT), SCOOP (CARRY-ALL, SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINE, VERMEER CUTTER, WORK BOAT 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY | $79.33 | $40.15 | $119.48 | |
| TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: POWER EQUIPMENT OPERATORS: GROUP 3 Building ENGI0138-002 (HEAVY & HIGHWAY) CURB MACHINE (ASPHALT OR CONCRETE), MAINTENANCE ENGINEER (SMALL EQUIPMENT), MAINTENANCE ENGINEER (WELL-POINT) MECHANIC (FIELDMAN), MICRO-TRAP (SELF CONTAINED, NEGATIVE AIR MACHINE), MILLING MACHINE (SMALL), PULVI-MIXER, PUMP (4 INCHES OR OVER), PUMP HYDRAULIC, PUMP JET, PUMP SUBMERSIBLE, PUMP (WELL POINT), ROLLER DIRT, VAC-ALL, WELDING AND BURNING, COMPRESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE BATTERY), CONCRETE FINISHING MACHINE, CONCRETE SPREADER, CONVEYOR, CURING MACHINE, FIREMAN, HOIST (ONE DRUM), RIDGE CUTTER, STRIPING MACHINE, WELDING MACHINE (PILE WORK), WELDING MACHINE (STRUCTURAL STEEL). NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY | $76.61 | $40.15 | $116.76 | |
| TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: POWER EQUIPMENT OPERATORS: GROUP 4 Building ENGI0138-002 (HEAVY & HIGHWAY) COMPRESSOR, COMPRESSOR ON CRANE, COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORK LIFT (WALK BEHIND, POWER OPERATED), GENERATOR- PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPOACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, POWER GRINDERS, PUMP (DOUBLE ACTION DIAPHRAGM), PUMP GYPSUM, PUMP (SINGLE ACTION 1 TO 3 INCHES), TRENCH MACHINE HAND, WELDING MACHINE 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY | $58.93 | $40.15 | $99.08 |
No trade rates match your search and filter selection.
Heavy
Applies to
Albany, Allegany, Bronx, Broome, Cattaraugus, Cayuga, Chautauqua, Chemung, Chenango, Clinton +52 more
Building, Heavy, Highway, Residential
Applies to
Nassau, Suffolk