NY20260012

BuildingHeavyHighwayResidential

Davis-Bacon Act general wage determination for building, heavy, highway, residential construction in New York.

Modification 2, revised 05/18/2026 68 trade rates 2 counties View on SAM.gov

Track NY20260012

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0012-001 Effective 01/01/2025
Trade Rate Fringe Total
HAZARDOUS MATERIAL HANDLER $47.75 $13.70 $61.45
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) $71.76 $36.81 $108.57
HAZARDOUS MATERIAL HANDLER $47.75 $13.70 $61.45
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) $71.76 $36.81 $108.57
ASBE0012-001 Effective 06/01/2025
Trade Rate Fringe Total
HAZARDOUS MATERIAL HANDLER $47.75 $13.70 $61.45
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) $71.76 $36.81 $108.57
HAZARDOUS MATERIAL HANDLER $47.75 $13.70 $61.45
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) $71.76 $36.81 $108.57
BRNY0001-001 Effective 05/01/2024
Trade Rate Fringe Total
MASON - STONE $69.91 $44.02 $113.93
BRICKLAYER $67.39 $35.90 $103.29
MASON - STONE $69.91 $44.02 $113.93
BRICKLAYER $67.39 $35.90 $103.29
BRNY0001-001 Effective 07/01/2024
Trade Rate Fringe Total
MASON - STONE $69.91 $44.02 $113.93
BRICKLAYER $67.39 $35.90 $103.29
MASON - STONE $69.91 $44.02 $113.93
BRICKLAYER $67.39 $35.90 $103.29
CARP0290-001 Effective 07/01/2025
Trade Rate Fringe Total
CARPENTERS: (RESIDENTIAL) $34.14 $23.15 $57.29
CARPENTERS: (HEAVY & HIGHWAY) $53.56 $34.28 $87.84
CARP0740-001 Effective 07/01/2025
Trade Rate Fringe Total
MILLWRIGHT $60.83 $58.03 $118.86
CARP1556-008 Effective 07/01/2024
Trade Rate Fringe Total
CARPENTERS: DIVERS $75.46 $55.84 $131.30
CARPENTERS: (PILEDRIVERMAN) $60.59 $55.84 $116.43
CARPENTERS: (DOCKBUILDERS) $60.59 $55.84 $116.43
CARPENTERS: (DIVERS TENDERS) $55.00 $55.84 $110.84
CARP1556-011 Effective 07/01/2024
Trade Rate Fringe Total
CARPENTERS: (TIMBERMEN) $55.59 $55.41 $111.00
CARP2287-003 Effective 07/01/2025
Trade Rate Fringe Total
CARPENTER (SOFT FLOOR LAYERS) $59.05 $48.08 $107.13
ELEC0025-001 Effective 04/26/2025
Trade Rate Fringe Total
ELECTRICIAN $64.55 $47.40 $111.95
ELEC0025-002 Effective 04/26/2025
Trade Rate Fringe Total
ELECTRICIANS: (TELEPHONE UNIT) $42.93 $32.43 $75.36
ELECTRICIANS: (MAINTENANCE UNIT) $49.79 $32.27 $82.06
ELEC1049-002 Effective 03/30/2025
Trade Rate Fringe Total
LINE CONSTRUCTION: MATERIAL MAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) $61.40 $36.24 $97.64
LINE CONSTRUCTION: LINEMAN & CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) $70.57 $39.19 $109.76
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) $56.46 $34.63 $91.09
LINE CONSTRUCTION: GROUNDMAN (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NOT PERFORMED BY RAILROAD EMPLOYEES) OVERHEAD AND UNDERGROUND TRANSMISSION/DISTRIBUTION LINE WORK. FIBER OPTIC, TELEPHONE CABLE AND EQUIPMENT;) $42.34 $30.05 $72.39
ELEV0001-002 Effective 03/17/2022
Trade Rate Fringe Total
ELEVATOR MECHANIC (MODERNIZATION AND REPAIR) GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED $59.09 $45.56 $104.65
ELEVATOR MECHANIC (ELEVATOR CONSTRUCTOR) GOOD FRIDAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. PAID VACATION: AN EMPLOYEE WHO HAS WORKED LESS THAN 5 YEARS SHALL RECIEVE VACATION PAY CREDIT ON THE BASIS OF 4% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 5 TO 15 YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 6% OF HIS HOURLY RATE FOR ALL HOURS WORKED; AN EMPLOYEE WHO HAS WORKED 15 OR MORE YEARS SHALL RECEIVE VACATION PAY CREDIT ON THE BASIS OF 8% OF HIS HOURLY RATE FOR ALL HOURS WORKED $75.14 $47.45 $122.59
ENGI0138-001 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING CONSTRUCTION) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACTOR (CATERPILLAR OR WHEEL VIBRATOR) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY $54.21 $39.99 $94.20
POWER EQUIPMENT OPERATORS: GROUP 4 (BUILDING CONSTRUCTION) COMPRESSOR, COMPRESSOR (ON CRANE), COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORKLIFT (WALK BEHIND, POWER OPERATED), GENERATOR-PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, PUMP (DOUBLE ACTION DIAPHGRGM), PUMP (GYPSUM), TRENCH MACHINE (HAND), WELDING MACHINE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY $56.54 $39.99 $96.53
POWER EQUIPMENT OPERATORS: GROUP 3 (BUILDING CONSTRUCTION) COMRPESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE IN BATTERY), CONCRETE FINISHING MCHINE, CONCRETE SPREADER, CONVEYOR, CURB MACHINE (ASPHALT OR CONCRETE), CURING MACHINE, FIREMAN, HOIST (1 DRUM), MICRO-TRAP, (SELF CONTAINED, NEGATIVE AIR MACHINE), PUMP (4 INCHES OR OVER), PUMP (HYDRAULIC), PUMP (JET), PUMP (SUMBERSIBLE), PUMP (WELL POINT), PULVI-MIXER, RIDGE CUTTER, ROLLER (DIRT), STRIPING MACHINE, VAC-ALL, WELDING AND BURNING, WELDING MACHINE (PILE WORK), WELDING MACHINE (STRUCTURAL STEEL) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY $73.78 $39.99 $113.77
POWER EQUIPMENT OPERATORS: GROUP 2 (BUILDING CONSTRUCTION) BACKHOE, BOOM TRUCK, BULLDOZER, CHERYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST, 2 DRUM, LOADING MACHINE, LOADING MACHINE (FRONT END) MECHANICAL COMPACTORS, (MACHINE DRAWN), MULCH MACHINE (MACHINE-FED), MECHANIC, POWER WINCH, OTHER THAN STONE/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED OTHER THAN STONE STEEL) PUMP (HYDRAULIC, WITH BORING MACHINE), ROLLER, (ASPHALT), SCOOP (CARRY-ALL SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY $76.44 $39.99 $116.43
POWER EQUIPMENT OPERATORS: GROUP 1 (BUILDING CONSTRUCTION) ASPHALT SPREADER, BACKHOE CRAWLER CAPACITY OVER CATER- PILLER 225 AND LOMATSU 300, BOILER (THERMOPLASTIC), CHERRY PICKER, OVER 50 TONS, CMI OR MAXIM SPREADER, CONCRETE PUMP (WITH OILER), CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING), CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUM), LOADING MACHINE (BUCKET) CAP OF 10 YDS OR OVER MICRO-TRAP, WITH COMPRESSOR (NEGATIVE AIR MACHINE), MILLING MACHINE, LARGE PILE DRIVER, POWER WINCH, STONE SETTING/STRUCTURAL STEEL, POWER WINCH (TRUCK MOUNTED/STONE STEEL) POWERHOUSE, ROAD PAVER SCOOP, CARRY-ALL, SCRAPER IN TANDEM SHOVEL, SIDEBOOM TRACTOR, SIDEBOOM TRACTOR (USED IN TANK WORK), STONE SPREADER (SELF PROPELLED TANK WORK), ZAMBONI (ICE MACHINE) NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENT'S DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY), GOOD FRIDAY, MEMORIAL DAY, INDPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON A SATURDAY WILL BE CELEBRATED ON FRIDAY $80.43 $39.99 $120.42
ENGI0138-002 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS: GROUP 6 (HEAVY & HIGHWAY) WELL DRILLERS NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY $44.37 $12.95 $57.32
POWER EQUIPMENT OPERATORS: GROUP 5 (HEAVY & HIGHWAY) BATCHING PLANT (ON SITE OF JOB), GENERATOR (SMALL), GRINDER, MIXER (WITH SKIP), MIXER (2 SMALL WITH OR WITHOUT SKIP), MIXER (2 BAG OR OVER, WITH OR WITHOUT SKIP), MULCH MACHINE, OILER, PUMP (CENTRIFUGAL, UP TO 3 INCHES), ROOT CUTTER, STUMP CHIPPER, TOWER CRANE (OILER), TRACK TAMPER (2 ENGINEERS, EACH), TRACTOR (CATERPILLAR OR WHEEL), VIBRATOR, WORK BOAT (DECKHAND), NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY $56.55 $40.15 $96.70
TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: POWER EQUIPMENT OPERATORS: GROUP 4 (HEAVY & HIGHWAY) COMPRESSOR, COMPRESSOR ON CRANE, COMPRESSOR (PILE WORK), COMPRESSOR (STONE SETTING), CONCRETE BREAKER, CONCRETE SAW OR CUTTER, FORK LIFT (WALK BEHIND, POWER OPERATED), GENERATOR- PILE WORK, GENERATOR, HYDRA HAMMER, MECHANICAL COMPOACTORS (HAND OPERATED), OILER (TRUCK CRANE), PIN PULLER, PORTABLE HEATERS, POWERBROOM, POWER BUGGIES, POWER GRINDERS, PUMP (DOUBLE ACTION DIAPHRAGM), PUMP GYPSUM, PUMP (SINGLE ACTION 1 TO 3 INCHES), TRENCH MACHINE HAND, WELDING MACHINE 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY $58.93 $40.15 $99.08
TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: POWER EQUIPMENT OPERATORS: GROUP 3 (HEAVY & HIGHWAY) CURB MACHINE (ASPHALT OR CONCRETE), MAINTENANCE ENGINEER (SMALL EQUIPMENT), MAINTENANCE ENGINEER (WELL-POINT) MECHANIC (FIELDMAN), MICRO-TRAP (SELF CONTAINED, NEGATIVE AIR MACHINE), MILLING MACHINE (SMALL), PULVI-MIXER, PUMP (4 INCHES OR OVER), PUMP HYDRAULIC, PUMP JET, PUMP SUBMERSIBLE, PUMP (WELL POINT), ROLLER DIRT, VAC-ALL, WELDING AND BURNING, COMPRESSOR (STRUCTURAL STEEL), COMPRESSOR (2 OR MORE BATTERY), CONCRETE FINISHING MACHINE, CONCRETE SPREADER, CONVEYOR, CURING MACHINE, FIREMAN, HOIST (ONE DRUM), RIDGE CUTTER, STRIPING MACHINE, WELDING MACHINE (PILE WORK), WELDING MACHINE (STRUCTURAL STEEL). NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY $76.61 $40.15 $116.76
TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: POWER EQUIPMENT OPERATORS: GROUP 2 (HEAVY & HIGHWAY) BULLDOZER, BACKHOE, BOOM TRUCK, BORING MACHINE/AUGUR, CHERRYPICKER, CONVEYOR (MULTI), DINKY LOCOMOTIVE, FORKLIFT, HOIST (2 DRUM), LOADING MACHINE, LOADING MACHINE (FRONT END), MECHANICAL COMPACTOR (MACHINE DRAWN), MECHANIC, MULCH MACHINE (MACHINE- FED), POWER WINCH (OTHER THAN STONE/STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/OTHER THAN STONE STEEL), PUMP HYDRAULIC (WITH BORING MACHINE), ROLLER (ASPHALT), SCOOP (CARRY-ALL, SCRAPER), TOWER CRANE (MAINTENANCE MAN), TRENCHING MACHINE, VERMEER CUTTER, WORK BOAT 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY $79.33 $40.15 $119.48
TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: POWER EQUIPMENT OPERATORS: GROUP 1 (HEAVY & HIGHWAY) ASPHALT SPREADER, BACKHOE CRAWLER (CAPACITY OVER CATERPILLER 225 AND KOMATSU 300), BOILER (THERMOPLASTIC), BORING MACHINE (POST HOLE), CGHERRY PICKER (OVER 50 TON), CMI OR MAXIM SPREADER, CONCRETE PUMP, WITH OILER, CRANE (CRAWLER TRUCK), CRANE (ON BARGE), CRANE (STONE SETTING) CRANE (STRUCTURAL STEEL), CRANE (WITH CLAM SHELL), DERRICK, DRAGLINE, DREDGE, GRADALL, GRADER, HOIST (3 DRUMS), LOADING MACHINE (BUCKET) CAPACITY OF 10 YARDS OR OVER, MICRO-TRAP (WITH COMPRESSOR-NEGATIVE AIR MACHINE), MILLING MACHINE (LARGE), PILEDRIVER, POWER WINCH (STONE SETTING STRUCTURAL STEEL), POWER WINCH (TRUCK MOUNTED/STONE STEEL), POWER-HOUSE, ROAD PAVER, SCOOP, CARRY ALL (SCRAPER IN TANDEM), SHOVEL, SIDEBOOM TRACTOR, SIDEBOOM TRACTOR (USED IN TANK WORK), STONE SPREADER (SELF-PROPELLED), TANK WORK, TOWER CRANE NOTES: HAZMAT PREMIUMS: LEVEL A 3.50 LEVEL B 2.50 LEVEL C 1.50 LEVEL D 1.00 TRUCK AND CRAWLER CRANES LONG BOOM PREMIUMS: BOOM LENGTHS (INCLUDING JIB) 100-149 FT 1.00 BOOM LENGHTS (INCLUDING JIB) 150-249 FT 1.50 BOOM LENGHTS (INCLUDING JIB) 250-349 FT 2.00 BOOM LENGTHS (INCLUDING JIB) 350 FT 3.00 CRANES USING CLAMSHELL BUCKETS .25 FRONT END LOADER 10 YDS AND ABOVE .25 OILER ON TRUCK CRANES WITH BOOM LENGTH OF 100 FT. OR MORE .25 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY OR PRESIDENTS DAY (IN LIEU OF LINCOLN'S OR WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY OR DAYS CELEBRATED AS SUCH. ANY HOLIDAY THAT FALLS ON SATURDAY WILL BE CELEBRATED ON FRIDAY $84.70 $40.15 $124.85
IRON0046-003 Effective 07/01/2025
Trade Rate Fringe Total
IRONWORKER (METALLIC LATHERS AND REINFORCING IRONWORKERS) $57.00 $32.96 $89.96
IRON0197-001 Effective 07/01/2024
Trade Rate Fringe Total
IRONWORKER (STONE DERRICKMAN) $60.40 $60.14 $120.54
IRON0361-001 Effective 07/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL $58.95 $92.02 $150.97
IRON0580-001 Effective 07/01/2025
Trade Rate Fringe Total
IRONWORKER: ORNAMENTAL $48.15 $67.62 $115.77
LABO0066-001 Effective 07/01/2025
Trade Rate Fringe Total
LABORERS: PLASTERERS TENDERS (BUILDING) $42.55 $34.79 $77.34
LABORERS (BUILDING) $42.55 $34.79 $77.34
LABO0078-001 Effective 01/06/2025
Trade Rate Fringe Total
LABORERS: ASBESTOS (REMOVAL, ABATEMENT, ENCAPSULATION OR DECONTAMINATION OF ASBESTOS); LEAD; & HAZARDOUS WASTE LABORERS (HAZARDOUS WASTE, HAZARDOUS MATERIALS, BIOCHEMICAL AND MOLD REMEDIATION, HVAC, DUCT CLEANING, RE-SPRAY FIREPROOFING, ETC) (BUILDING CONSTRUCTION) $41.15 $20.90 $62.05
LABO1298-001 Effective 06/01/2023
Trade Rate Fringe Total
LABORERS: REGULAR LABORERS (HEAVY & HIGHWAY) A. MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM $45.49 $35.98 $81.47
LABORERS: ASPHALT SHOVELERS, ROLLER BOYS & TAMPERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM $49.96 $35.98 $85.94
LABORERS: ASPHALT RAKERS; FORMSETTERS (HEAVY & HIGHWAY) A. FOOTNOTES: LABORERS WORKING IN A HAZARDOUS MATERIAL HOT ZONE SHALL RECEIVE AN ADDITIONAL 20% PREMIUM. WHERE THE CONTRACT PROVIDES FOR NIGHT WORK OUTSIDE THE REGULAR HOURS OF WORK, THE EMPLOYEES SHALL BE PAID AT STRAIGHT TIME PLUS A 30% NIGHT WORK PREMIUM FOR THE 8 HOURS WORKED DURING THE NIGHT. FIREWATCH WORK PERFORMED AFTER REGULAR HOURS SHALL BE PAID AN ADDITIONAL 10% PREMIUM. SECOND AND THIRD SHIFT WORK WILL BE PAID AT A 30% PREMIUM. CONTRACTOR REQUESTING LABORERS CERTIFIED FOR HAZARDOUS MATERIAL WORK AND/OR EMPLOYED ON HAZARDOUS MATERIAL SHALL BE REQUIRED TO PAY AN ADDITIONAL 10% PREMIUM $51.43 $35.98 $87.41
PAIN0009-002 Effective 05/01/2025
Trade Rate Fringe Total
PAINTER (SPRAY, SCAFFOLD, SANDBLASTING) $47.75 $44.11 $91.86
PAINTER (PAINTERS, DRYWALL FINISHERS) $44.75 $44.11 $88.86
PAINTER (GLAZIERS) $49.20 $57.20 $106.40
PAIN0806-010 Effective 10/01/2024
Trade Rate Fringe Total
PAINTERS: (STUCTURAL STEEL AND BRIDGE) $56.25 $55.14 $111.39
PAIN1974-002 Effective 06/28/2025
Trade Rate Fringe Total
PAINTERS: (DRYWALL TAPERS/POINTERS) $48.47 $35.91 $84.38
PLAS0262-003 Effective 08/01/2025
Trade Rate Fringe Total
PLASTERER $48.51 $32.78 $81.29
PLAS0780-001 Effective 07/01/2025
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $59.87 $41.81 $101.68
PLUM0200-001 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER (RESIDENTIAL CONSTRUCTION:) $36.05 $19.63 $55.68
PLUMBER (BUILDING CONSTRUCTION:) $60.73 $45.75 $106.48
PLUM0638-001 Effective 01/01/2026
Trade Rate Fringe Total
PLUMBER, SERVICE FITTERS $47.85 $23.96 $71.81
ROOF0154-001 Effective 05/01/2025
Trade Rate Fringe Total
ROOFER $51.25 $47.36 $98.61
SHEE0028-002 Effective 11/02/2023
Trade Rate Fringe Total
SHEET METAL WORKER (RESIDENTIAL CONSTRUCTION) $35.79 $25.37 $61.16
SHEET METAL WORKER (BUILDING CONSTRUCTION) $53.60 $60.74 $114.34

Modification History

Modification Publication Date
1 01/30/2026
2 05/18/2026

Counties Covered

This wage determination applies to 2 counties in New York.

Get notified when NY20260012 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.