Saluda

5 wage determinations 108 trade rates

Popular Trades In Saluda

Track Saluda County updates

Get an email when wage determinations covering Saluda County, South Carolina are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BRICKLAYER Building
SUSC2011-029
$18.00 0.00 $18.00
CARPENTER Residential
SUSC2016-008
$14.53 0.00 $14.53
CARPENTER (DRYWALL HANGING ONLY) Building
SUSC2011-029
$16.32 $1.50 $17.82
CARPENTER (FORM WORK ONLY) Building
SUSC2011-029
$13.83 $4.69 $18.52
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK Building
SUSC2011-029
$15.57 $4.66 $20.23
CARPENTER, INCLUDES FORM WORK Heavy
SUSC2011-048
$14.85 0.00 $14.85
CEMENT MASON/CONCRETE FINISHER Building
SUSC2011-029
$15.29 0.00 $15.29
CEMENT MASON/CONCRETE FINISHER Residential
SUSC2016-008
$13.59 0.00 $13.59
DRYWALL HANGER Residential
SUSC2016-008
$12.00 0.00 $12.00
ELECTRICIAN Residential
SUSC2016-008
$17.55 0.00 $17.55
ELECTRICIAN WORK MORE THAN 40 FT. ABOVE THE GROUND ON OR FROM SWINGING SCAFFOLDS, BOSON CHAIRS, OR RAW STRUCTURAL STEEL: $1.00 PER HOUR ADDITIONAL Building
ELEC0776-002
$32.80 $13.99 $46.79
GLAZIER Building
SUSC2011-029
$18.41 0.00 $18.41
HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) Building
SUSC2011-029
$19.71 $1.93 $21.64
IRONWORKER, STRUCTURAL Heavy
IRON0848-001
$29.75 $18.00 $47.75
LABORER: COMMON OR GENERAL Building
SUSC2011-029
$10.33 0.00 $10.33
LABORER: COMMON OR GENERAL Heavy
SUSC2011-048
$9.00 $1.92 $10.92
LABORER: COMMON OR GENERAL Residential
SUSC2016-008
$11.20 0.00 $11.20
LABORER: LANDSCAPE Building
SUSC2011-029
$9.45 $0.49 $9.94
LABORER: MASON TENDER-BRICK/CONCRETE/CEMENT/STONE Building
SUSC2011-029
$11.00 0.00 $11.00
LABORER: PIPELAYER Building
SUSC2011-029
$14.69 $2.08 $16.77
LABORER: PIPELAYER Heavy
SUSC2011-048
$13.50 $2.41 $15.91
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DECKHAND Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.77 $1.73 $9.50
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DECKHAND Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.77 $1.73 $9.50
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS A2: CRANE OPERATOR Heavy
ENGI0025-002 (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$43.20 $14.99 $58.19
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS A2: CRANE OPERATOR Heavy
ENGI0025-002 (360 SWING) . PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$43.20 $14.99 $58.19
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-002 (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80; OILER QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS TANKERMAN ENDORSEMENT ONLY (USCG) (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$41.93 $14.90 $56.83
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS B1: DERRICK OPERATOR Heavy
ENGI0025-002 (180 SWING), SPIDER/SPILL BARGE OPERATOR, TIMBER FORK OPERATOR, DOZER OPERATOR, ENGINEER, BLASTER/DRILLER, FILL PLACER, ELECTRICIAN, LICENSED BOAT OPERATOR, LICENSED CREW BOAT OPERATOR. PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR LICENSED ENGINEER (USCG) $1.80; OILER QMED AND TANKERMAN ENDORSEMENT (USCG) $1.80; ALL CLASSIFICATIONS TANKERMAN ENDORSEMENT ONLY (USCG) (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$41.93 $14.90 $56.83
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD Heavy
ENGI0025-002 Scope differs by code/WD
$38.38 $14.66 $53.04
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: DREDGING :, HYDRAULIC DREDGES OVER 20"": CLASS C1: MATE, DRAG BARGE OPERATOR, WELDER, ASSISTANT FILL PLACER, STEWARD Heavy
ENGI0025-002 Scope differs by code/WD
$38.38 $14.66 $53.04
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: ENGINEER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.59 $1.73 $11.32
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: ENGINEER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.59 $1.73 $11.32
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LAUNCHMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.19 $1.73 $9.92
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LAUNCHMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.19 $1.73 $9.92
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LEVERMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$10.03 $1.73 $11.76
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: LEVERMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$10.03 $1.73 $11.76
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MATE Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.82 $1.73 $10.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MATE Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.82 $1.73 $10.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESS COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.71 $1.73 $9.44
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESS COOK Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.71 $1.73 $9.44
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESSMAN & JANITOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.53 $1.73 $9.26
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: MESSMAN & JANITOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.53 $1.73 $9.26
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy
ENGI0025-002 Scope differs by code/WD
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: OILER & FIREMAN (HYDRAULIC DREDGES UNDER 20"") Heavy
ENGI0025-002 Scope differs by code/WD
$8.11 $1.73 $9.84
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SHOREMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.82 $1.73 $9.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SHOREMAN Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$7.82 $1.73 $9.55
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SPIDER BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20"").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: SPIDER BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20"").PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building
SUSC2011-029
$16.81 $2.67 $19.48
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Heavy
SUSC2011-048
$18.00 0.00 $18.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Residential
SUSC2016-008
$18.85 0.00 $18.85
OPERATOR: BULLDOZER Building
SUSC2011-029
$17.07 $2.65 $19.72
OPERATOR: CRANE Building
SUSC2011-029
$19.39 $2.02 $21.41
OPERATOR: GRADER/BLADE Building
SUSC2011-029
$17.50 $1.78 $19.28
OPERATOR: GRADER/BLADE Heavy
SUSC2011-048
$20.11 $1.39 $21.50
OPERATOR: LOADER Building
SUSC2011-029
$14.18 $1.99 $16.17
OPERATOR: LOADER Heavy
SUSC2011-048
$10.50 $1.98 $12.48
PAINTER (BRUSH AND ROLLER) Residential
SUSC2016-008
$13.20 0.00 $13.20
PAINTER: BRUSH, ROLLER AND SPRAY Building
SUSC2011-029
$12.24 0.00 $12.24
PIPEFITTER Building
PLUM0421-005
$36.00 $14.19 $50.19
PLUMBER Building
SUSC2011-029
$16.86 $0.95 $17.81
PLUMBER Residential
SUSC2016-008
$14.17 0.00 $14.17
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway
SUSC2011-033 (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA)
$15.98 0.00 $15.98
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (LEXINGTON) Highway
SUSC2011-033
$16.02 0.00 $16.02
POWER EQUIPMENT OPERATOR: BULLDOZER Highway
SUSC2011-033
$17.38 0.00 $17.38
POWER EQUIPMENT OPERATOR: CARPENTER, FORM WORK ONLY Highway
SUSC2011-033 (FAIRFIELD, KERSHAW, RICHLAND, SALUDA)
$15.04 0.00 $15.04
POWER EQUIPMENT OPERATOR: CARPENTER, FORM WORK ONLY (LEXINGTON) Highway
SUSC2011-033
$14.50 0.00 $14.50
POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FINISHER Highway
SUSC2011-033
$13.65 0.00 $13.65
POWER EQUIPMENT OPERATOR: CRANE Highway
SUSC2011-033
$18.93 0.00 $18.93
POWER EQUIPMENT OPERATOR: GRADER/BLADE Highway
SUSC2011-033 (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA)
$18.44 0.00 $18.44
POWER EQUIPMENT OPERATOR: GRADER/BLADE (LEXINGTON) Highway
SUSC2011-033
$18.54 0.00 $18.54
POWER EQUIPMENT OPERATOR: GUARDRAIL INSTALLER Highway
SUSC2011-033 (INCLUDES GUARDRAIL/POST DRIVER WORK)
$12.49 0.00 $12.49
POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING Highway
SUSC2011-033
$15.02 0.00 $15.02
POWER EQUIPMENT OPERATOR: LABORER Highway
SUSC2011-033 (ASPHALT INCLUDES ASPHALT DISTRIBUTOR, SHOVELER, AND SPREADER)
$11.54 0.00 $11.54
POWER EQUIPMENT OPERATOR: LABORER (LUTEMAN) Highway
SUSC2011-033
$11.61 0.00 $11.61
POWER EQUIPMENT OPERATOR: LABORER (TRAFFIC CONTROL-FLAGGER) Highway
SUSC2011-033
$11.07 0.00 $11.07
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (CALHOUN) Highway
SUSC2011-033
$10.09 0.00 $10.09
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (FAIRFIELD) Highway
SUSC2011-033
$9.55 0.00 $9.55
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (KERSHAW) Highway
SUSC2011-033
$9.88 0.00 $9.88
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (LEXINGTON) Highway
SUSC2011-033
$9.78 0.00 $9.78
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (RICHLAND) Highway
SUSC2011-033
$9.97 0.00 $9.97
POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (SALUDA) Highway
SUSC2011-033
$9.88 0.00 $9.88
POWER EQUIPMENT OPERATOR: LABORER, TRAFFIC CONTROL-CONE SETTER Highway
SUSC2011-033 (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA)
$10.87 0.00 $10.87
POWER EQUIPMENT OPERATOR: LABORER, TRAFFIC CONTROL-CONE SETTER (LEXINGTON) Highway
SUSC2011-033
$11.26 0.00 $11.26
POWER EQUIPMENT OPERATOR: LABORER: MASON TENDER-CEMENT/CONCRETE Highway
SUSC2011-033
$10.40 0.00 $10.40
POWER EQUIPMENT OPERATOR: LABORER: PIPELAYER Highway
SUSC2011-033
$14.46 0.00 $14.46
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) Highway
SUSC2011-033
$17.22 0.00 $17.22
POWER EQUIPMENT OPERATOR: MECHANIC Highway
SUSC2011-033
$15.25 0.00 $15.25
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (HYDROSEEDER) Highway
SUSC2011-033
$11.00 0.00 $11.00
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (MILLING MACHINE) Highway
SUSC2011-033
$11.84 0.00 $11.84
POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (PAVER) Highway
SUSC2011-033
$13.93 0.00 $13.93
POWER EQUIPMENT OPERATOR: ROLLER Highway
SUSC2011-033 (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA)
$14.98 0.00 $14.98
POWER EQUIPMENT OPERATOR: ROLLER (LEXINGTON) Highway
SUSC2011-033
$15.10 0.00 $15.10
POWER EQUIPMENT OPERATOR: SCRAPER Highway
SUSC2011-033
$12.71 0.00 $12.71
POWER EQUIPMENT OPERATOR: SCREED Highway
SUSC2011-033
$13.56 0.00 $13.56
POWER EQUIPMENT OPERATOR: TRACTOR Highway
SUSC2011-033
$13.28 0.00 $13.28
ROOFER Building
SUSC2011-029
$12.21 0.00 $12.21
ROOFER Residential
SUSC2016-008
$15.00 0.00 $15.00
SPILL BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
SPILL BARGE OPERATOR Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK FOOTNOTE APPLICABLE TO ABOVE CRAFTS: A. NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$8.68 $1.73 $10.41
TRUCK DRIVER Building
SUSC2011-029
$14.05 $3.18 $17.23
TRUCK DRIVER Heavy
SUSC2011-048
$14.15 $2.32 $16.47
TRUCK DRIVER: DUMP TRUCK Highway
SUSC2011-033 (CALHOUN, FAIRFIELD, KERSHAW, RICHLAND, SALUDA)
$13.29 0.00 $13.29
TRUCK DRIVER: DUMP TRUCK (LEXINGTON) Highway
SUSC2011-033
$13.22 0.00 $13.22
TRUCK DRIVER: LOWBOY TRUCK Highway
SUSC2011-033
$14.11 0.00 $14.11
WELDER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.79 $1.73 $11.52
WELDER Heavy
ENGI0025-002 (HYDRAULIC DREDGES UNDER 20""). PREMIUMS: ADDITIONAL 20% FOR HAZARDOUS MATERIAL WORK YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME RATE MULTIPLIED BY THE TOTAL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. PLUS VACATION CONTRIBUTION OF 8% OF STRAIGHT TIME PAY FOR ALL HOURS WORKED. INCENTIVE PAY : (ADD TO HOURLY RATE) OPERATOR (NCCCO LICENSE/CERTIFICATION) $1.80; LICENSED TUG OPERATOR OVER 1000 HP (ASSIGNED AS MASTER) USCG LICENSED MASTER OF TOWING VESSELS (MOTV) $1.80; LICENSED BOAT OPERATOR (ASSIGNED AS LEAD BOAT CAPTAIN) USCG LICENSED BOAT OPERATOR $1.30; ENGINEER (QMED AND TANKERMAN ENDORSEMENT OR LICENSED ENGINEER (USCG) ONLY (USCG) $1.55; DECKHAND OR MATER AB W/LIFEBOATMAN ONLY (USCG) $1.80; WELDER (ABS CERTIFICATION) $1.55
$9.79 $1.73 $11.52

Wage Determinations

Heavy

32 trades

Applies to

Abbeville, Aiken, Allendale, Anderson, Bamberg, Barnwell, Beaufort, Berkeley, Calhoun, Charleston +36 more

Building

22 trades

Applies to

Calhoun, Fairfield, Lexington, Saluda

Highway

37 trades

Applies to

Calhoun, Fairfield, Kershaw, Lexington, Richland, Saluda

Heavy

8 trades

Applies to

Calhoun, Lexington, Richland, Saluda

Residential

9 trades

Applies to

Calhoun, Fairfield, Kershaw, Lexington, Saluda