Beaver

2 wage determinations 52 trade rates

Popular Trades In Beaver

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
CARPENTER, Includes Form Work Heavy
SUUT2008-033 (Excludes Natural Gas Pipeline Construction Form Work)
$14.75 $3.03 $17.78
CARPENTER, Includes Form Work Highway
SUUT2019-014
$22.07 $6.88 $28.95
CEMENT MASON/CONCRETE FINISHER Heavy
SUUT2008-033
$14.00 $0.56 $14.56
CEMENT MASON/CONCRETE FINISHER Highway
SUUT2019-014
$17.36 $2.04 $19.40
Common or General, Nail gun, Pipelayer, Pot Tender Heavy
LABO0295-018
$20.59 $8.65 $29.24
ELECTRICIAN Highway
SUUT2019-014
$26.83 0.00 $26.83
Formworker Heavy
LABO0295-018
$20.85 $8.65 $29.50
Group 2 Heavy
TEAM0222-003 Scope differs by code/WD
$41.06 $15.75 $56.81
Group 2 Heavy
TEAM0222-003 Scope differs by code/WD
$45.57 $14.90 $60.47
Group 3 Heavy
TEAM0222-003 Scope differs by code/WD
$40.66 $15.75 $56.41
Group 3 Heavy
TEAM0222-003 Scope differs by code/WD
$41.57 $14.90 $56.47
HIGHWAY/PARKING LOT STRIPING: INSTALLER - GUARDRAIL Highway
SUUT2019-014
$17.79 0.00 $17.79
HIGHWAY/PARKING LOT STRIPING: INSTALLER - SIGN Highway
SUUT2019-014
$18.22 $2.79 $21.01
HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway
SUUT2019-014
$19.88 $5.71 $25.59
HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway
SUUT2019-014
$17.77 $3.95 $21.72
HIGHWAY/PARKING LOT STRIPING: LABORER: Landscape Highway
SUUT2019-014
$14.45 $2.79 $17.24
HIGHWAY/PARKING LOT STRIPING: LABORER: Mason Tender - Cement/Concrete Highway
SUUT2019-014
$17.03 $0.36 $17.39
HIGHWAY/PARKING LOT STRIPING: LABORER: Pipelayer Highway
SUUT2019-014
$15.52 $2.79 $18.31
HIGHWAY/PARKING LOT STRIPING: Painter Highway
SUUT2019-014
$16.76 $1.62 $18.38
LABORER Chain Saw and Power Drill Heavy
LABO0295-018
$20.85 $8.65 $29.50
LABORER: Common or General Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$10.92 0.00 $10.92
LABORER: Mason Tender - Cement/Concrete Heavy
SUUT2008-033
$9.00 $0.36 $9.36
LABORER: Pipelayer Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$9.00 0.00 $9.00
Oiler Heavy
ENGI0003-054
$22.03 $11.88 $33.91
OPERATOR: Backhoe/Excavator/Trackhoe Highway
SUUT2019-014
$22.10 $5.97 $28.07
OPERATOR: Grader/Blade, Excludes Natural Gas Pipeline Construction Heavy
SUUT2008-033
$13.61 0.00 $13.61
OPERATOR: Loader (Front End) Heavy
SUUT2008-033
$11.38 0.00 $11.38
OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway
SUUT2019-014
$20.05 $3.31 $23.36
OPERATOR: OPERATOR: Broom/Sweeper Highway
SUUT2019-014
$18.29 $5.65 $23.94
OPERATOR: OPERATOR: Bulldozer Highway
SUUT2019-014
$21.77 $4.40 $26.17
OPERATOR: OPERATOR: Concrete Finishing Machine Highway
SUUT2019-014
$22.57 $6.55 $29.12
OPERATOR: OPERATOR: Grader/Blade Highway
SUUT2019-014
$23.69 $5.95 $29.64
OPERATOR: OPERATOR: Loader Highway
SUUT2019-014
$22.53 $6.92 $29.45
OPERATOR: OPERATOR: Mechanic Highway
SUUT2019-014
$25.24 $10.96 $36.20
OPERATOR: OPERATOR: Milling Machine Highway
SUUT2019-014
$26.53 $6.00 $32.53
OPERATOR: OPERATOR: Oiler Highway
SUUT2019-014
$19.00 $5.44 $24.44
OPERATOR: OPERATOR: Paver Highway
SUUT2019-014 (Asphalt, Aggregate, and Concrete)
$23.43 $8.13 $31.56
OPERATOR: OPERATOR: Roller Highway
SUUT2019-014
$20.23 $5.61 $25.84
OPERATOR: OPERATOR: Screed Highway
SUUT2019-014
$19.89 $5.45 $25.34
OPERATOR: Power Equipment Heavy
ENGI0003-046 (3)Backhoe/Excavator
$30.78 $16.09 $46.87
OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher Heavy
ENGI0003-054
$35.68 $17.57 $53.25
OPERATOR: Roller Heavy
SUUT2008-033 (Dirt and Grade Compaction)
$10.89 0.00 $10.89
OPERATOR: Trackhoe Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$13.63 0.00 $13.63
OPERATOR: TRAFFIC CONTROL: Flagger Highway
SUUT2019-014
$12.47 $2.53 $15.00
Powderman Heavy
LABO0295-018
$21.65 $8.65 $30.30
Sandblaster Heavy
LABO0295-018
$20.85 $8.65 $29.50
TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway
SUUT2019-014
$17.14 $2.79 $19.93
TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway
SUUT2019-014
$20.31 $4.06 $24.37
TRUCK DRIVER Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$12.00 0.00 $12.00
TRUCK DRIVER (Water Truck) Highway
TEAM0222-005
$29.53 $14.65 $44.18
TRUCK DRIVER ZONE 1: Group 1 Heavy
TEAM0222-003
$41.71 $14.75 $56.46
ZONE 2: Group 1 Heavy
TEAM0222-003
$46.18 $14.90 $61.08

Wage Determinations

Heavy

0 trades

Applies to

Beaver, Emery, Grand, Kane, Piute, Wayne in Utah.

Highway

0 trades

Applies to

Beaver, Wayne in Utah.