UT20260017

Heavy

Davis-Bacon Act general wage determination for heavy construction in Utah.

Modification 1, revised 05/18/2026 24 trade rates 6 counties View on SAM.gov

Track UT20260017

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ENGI0003-046 Effective 07/01/2020
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR $30.78 $16.09 $46.87
ENGI0003-054 Effective 07/01/2013
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $22.03 $11.88 $33.91
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $35.68 $17.57 $53.25
LABO0295-018 Effective 07/01/2014
Trade Rate Fringe Total
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY $21.65 $8.65 $30.30
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50
LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.59 $8.65 $29.24
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY $20.85 $8.65 $29.50
SUUT2008-033 Effective 08/19/2008
Trade Rate Fringe Total
TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) $12.00 $0.00 $12.00
OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) $13.63 $0.00 $13.63
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) $10.89 $0.00 $10.89
OPERATOR: LOADER (FRONT END) $11.38 $0.00 $11.38
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION $13.61 $0.00 $13.61
LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) $9.00 $0.00 $9.00
LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) $10.92 $0.00 $10.92
LABORER: MASON TENDER - CEMENT/CONCRETE $9.00 $0.36 $9.36
CEMENT MASON/CONCRETE FINISHER $14.00 $0.56 $14.56
CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) $14.75 $3.03 $17.78
TEAM0222-003 Effective 07/01/2025
Trade Rate Fringe Total
TRUCK DRIVER ZONE 2: GROUP 3 $41.57 $14.90 $56.47
TRUCK DRIVER ZONE 2: GROUP 2 $45.57 $14.90 $60.47
TRUCK DRIVER ZONE 2: GROUP 1 $46.18 $14.90 $61.08
TRUCK DRIVER ZONE 1: GROUP 3 $40.66 $15.75 $56.41
TRUCK DRIVER ZONE 1: GROUP 2 $41.06 $15.75 $56.81
TRUCK DRIVER ZONE 1: GROUP 1 $41.71 $14.75 $56.46

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 6 counties in Utah.

Get notified when UT20260017 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.