Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ENGI0003-046 Effective 07/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR | $30.78 | $16.09 | $46.87 |
ENGI0003-054 Effective 07/01/2013 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 | $33.91 |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 | $53.25 |
LABO0295-018 Effective 07/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $21.65 | $8.65 | $30.30 |
| LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
| LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 | $29.24 |
| LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 |
SUUT2008-033 Effective 08/19/2008 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 | $12.00 |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | $0.00 | $13.63 |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | $0.00 | $10.89 |
| OPERATOR: LOADER (FRONT END) | $11.38 | $0.00 | $11.38 |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | $0.00 | $13.61 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 | $9.00 |
| LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $10.92 | $0.00 | $10.92 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 | $9.36 |
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 | $14.56 |
| CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 |
TEAM0222-003 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER ZONE 2: GROUP 3 | $41.57 | $14.90 | $56.47 |
| TRUCK DRIVER ZONE 2: GROUP 2 | $45.57 | $14.90 | $60.47 |
| TRUCK DRIVER ZONE 2: GROUP 1 | $46.18 | $14.90 | $61.08 |
| TRUCK DRIVER ZONE 1: GROUP 3 | $40.66 | $15.75 | $56.41 |
| TRUCK DRIVER ZONE 1: GROUP 2 | $41.06 | $15.75 | $56.81 |
| TRUCK DRIVER ZONE 1: GROUP 1 | $41.71 | $14.75 | $56.46 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 6 counties in Utah.
Get notified when UT20260017 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.