Emery

2 wage determinations 43 trade rates

Popular Trades In Emery

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BOILERMAKER Building
BOIL0004-001
$44.37 $26.87 $71.24
BRICKLAYER Building
SUUT2012-012
$23.88 0.00 $23.88
CARPENTER Building
SUUT2012-012 (Acoustical Ceiling Installation Only)
$20.64 $0.80 $21.44
CARPENTER, Excludes Acoustical Ceiling Installation Building
SUUT2012-012
$19.51 $4.71 $24.22
CARPENTER, Includes Form Work Heavy
SUUT2008-033 (Excludes Natural Gas Pipeline Construction Form Work)
$14.75 $3.03 $17.78
CEMENT MASON/CONCRETE FINISHER Heavy
SUUT2008-033
$14.00 $0.56 $14.56
CEMENT MASON/CONCRETE FINISHER Building
SUUT2012-012
$21.11 0.00 $21.11
Common or General, Nail gun, Pipelayer, Pot Tender Heavy
LABO0295-018
$20.59 $8.65 $29.24
ELECTRICIAN Building
ELEC0354-003 (Excluding Low Voltage Wiring)
$41.23 $17.12 $58.35
ELECTRICIAN Building
SUUT2012-012 (Low Voltage Wiring Only)
$23.36 $6.06 $29.42
Formworker Heavy
LABO0295-018
$20.85 $8.65 $29.50
Group 2 Heavy
TEAM0222-003 Scope differs by code/WD
$41.06 $15.75 $56.81
Group 2 Heavy
TEAM0222-003 Scope differs by code/WD
$45.57 $14.90 $60.47
Group 3 Heavy
TEAM0222-003 Scope differs by code/WD
$40.66 $15.75 $56.41
Group 3 Heavy
TEAM0222-003 Scope differs by code/WD
$41.57 $14.90 $56.47
INSTALLER - SIDING Building
SUUT2012-012 (METAL/ALUMINUM/VINYL)
$14.75 0.00 $14.75
INSULATOR - BATT Building
SUUT2012-012
$13.77 0.00 $13.77
IRONWORKER, REINFORCING Building
SUUT2012-012
$15.00 0.00 $15.00
IRONWORKER, STRUCTURAL Building
SUUT2012-012
$17.41 $6.13 $23.54
LABORER Chain Saw and Power Drill Heavy
LABO0295-018
$20.85 $8.65 $29.50
LABORER: Common or General Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$10.92 0.00 $10.92
LABORER: Common or General Building
SUUT2012-012
$10.63 0.00 $10.63
LABORER: Mason Tender - Brick Building
SUUT2012-012
$16.54 0.00 $16.54
LABORER: Mason Tender - Cement/Concrete Heavy
SUUT2008-033
$9.00 $0.36 $9.36
LABORER: Pipelayer Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$9.00 0.00 $9.00
Oiler Heavy
ENGI0003-054
$22.03 $11.88 $33.91
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUUT2012-012
$16.59 $0.79 $17.38
OPERATOR: Grader/Blade, Excludes Natural Gas Pipeline Construction Heavy
SUUT2008-033
$13.61 0.00 $13.61
OPERATOR: Loader (Front End) Heavy
SUUT2008-033
$11.38 0.00 $11.38
OPERATOR: PLUMBER Building
SUUT2012-012
$24.00 $4.62 $28.62
OPERATOR: Power Equipment Heavy
ENGI0003-046 (3)Backhoe/Excavator
$30.78 $16.09 $46.87
OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher Heavy
ENGI0003-054
$35.68 $17.57 $53.25
OPERATOR: Roller Heavy
SUUT2008-033 (Dirt and Grade Compaction)
$10.89 0.00 $10.89
OPERATOR: TILE FINISHER Building
SUUT2012-012
$17.00 0.00 $17.00
OPERATOR: TILE SETTER Building
SUUT2012-012
$19.40 0.00 $19.40
OPERATOR: Trackhoe Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$13.63 0.00 $13.63
Powderman Heavy
LABO0295-018
$21.65 $8.65 $30.30
Sandblaster Heavy
LABO0295-018
$20.85 $8.65 $29.50
SHEET METAL WORKER Building
SHEE0312-001 (HVAC Duct Installation Only)
$46.79 $14.89 $61.68
SPRINKLER FITTER Building
SFUT0669-003 (Fire Sprinklers)
$42.17 $26.63 $68.80
TRUCK DRIVER Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$12.00 0.00 $12.00
TRUCK DRIVER ZONE 1: Group 1 Heavy
TEAM0222-003
$41.71 $14.75 $56.46
ZONE 2: Group 1 Heavy
TEAM0222-003
$46.18 $14.90 $61.08

Wage Determinations

Heavy

0 trades

Applies to

Beaver, Emery, Grand, Kane, Piute, Wayne in Utah.

Building

0 trades

Applies to

Emery, Kane, Millard, Sevier, Wayne in Utah.