UT20260017
rev 0Heavy
0 trades
Applies to
Beaver, Emery, Grand, Kane, Piute, Wayne in Utah.
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER Building BOIL0004-001 | $44.37 | $26.87 | $71.24 |
| BRICKLAYER Building SUUT2012-012 | $23.88 | 0.00 | $23.88 |
| CARPENTER Building SUUT2012-012 (Acoustical Ceiling Installation Only) | $20.64 | $0.80 | $21.44 |
| CARPENTER, Excludes Acoustical Ceiling Installation Building SUUT2012-012 | $19.51 | $4.71 | $24.22 |
| CARPENTER, Includes Form Work Heavy SUUT2008-033 (Excludes Natural Gas Pipeline Construction Form Work) | $14.75 | $3.03 | $17.78 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUUT2008-033 | $14.00 | $0.56 | $14.56 |
| CEMENT MASON/CONCRETE FINISHER Building SUUT2012-012 | $21.11 | 0.00 | $21.11 |
| Common or General, Nail gun, Pipelayer, Pot Tender Heavy LABO0295-018 | $20.59 | $8.65 | $29.24 |
| ELECTRICIAN Building ELEC0354-003 (Excluding Low Voltage Wiring) | $41.23 | $17.12 | $58.35 |
| ELECTRICIAN Building SUUT2012-012 (Low Voltage Wiring Only) | $23.36 | $6.06 | $29.42 |
| Formworker Heavy LABO0295-018 | $20.85 | $8.65 | $29.50 |
| Group 2 Heavy TEAM0222-003 Scope differs by code/WD | $41.06 | $15.75 | $56.81 |
| Group 2 Heavy TEAM0222-003 Scope differs by code/WD | $45.57 | $14.90 | $60.47 |
| Group 3 Heavy TEAM0222-003 Scope differs by code/WD | $40.66 | $15.75 | $56.41 |
| Group 3 Heavy TEAM0222-003 Scope differs by code/WD | $41.57 | $14.90 | $56.47 |
| INSTALLER - SIDING Building SUUT2012-012 (METAL/ALUMINUM/VINYL) | $14.75 | 0.00 | $14.75 |
| INSULATOR - BATT Building SUUT2012-012 | $13.77 | 0.00 | $13.77 |
| IRONWORKER, REINFORCING Building SUUT2012-012 | $15.00 | 0.00 | $15.00 |
| IRONWORKER, STRUCTURAL Building SUUT2012-012 | $17.41 | $6.13 | $23.54 |
| LABORER Chain Saw and Power Drill Heavy LABO0295-018 | $20.85 | $8.65 | $29.50 |
| LABORER: Common or General Heavy SUUT2008-033 (Excluding Natural Gas Pipeline Construction) | $10.92 | 0.00 | $10.92 |
| LABORER: Common or General Building SUUT2012-012 | $10.63 | 0.00 | $10.63 |
| LABORER: Mason Tender - Brick Building SUUT2012-012 | $16.54 | 0.00 | $16.54 |
| LABORER: Mason Tender - Cement/Concrete Heavy SUUT2008-033 | $9.00 | $0.36 | $9.36 |
| LABORER: Pipelayer Heavy SUUT2008-033 (Excluding Natural Gas Pipeline Construction) | $9.00 | 0.00 | $9.00 |
| Oiler Heavy ENGI0003-054 | $22.03 | $11.88 | $33.91 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUUT2012-012 | $16.59 | $0.79 | $17.38 |
| OPERATOR: Grader/Blade, Excludes Natural Gas Pipeline Construction Heavy SUUT2008-033 | $13.61 | 0.00 | $13.61 |
| OPERATOR: Loader (Front End) Heavy SUUT2008-033 | $11.38 | 0.00 | $11.38 |
| OPERATOR: PLUMBER Building SUUT2012-012 | $24.00 | $4.62 | $28.62 |
| OPERATOR: Power Equipment Heavy ENGI0003-046 (3)Backhoe/Excavator | $30.78 | $16.09 | $46.87 |
| OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher Heavy ENGI0003-054 | $35.68 | $17.57 | $53.25 |
| OPERATOR: Roller Heavy SUUT2008-033 (Dirt and Grade Compaction) | $10.89 | 0.00 | $10.89 |
| OPERATOR: TILE FINISHER Building SUUT2012-012 | $17.00 | 0.00 | $17.00 |
| OPERATOR: TILE SETTER Building SUUT2012-012 | $19.40 | 0.00 | $19.40 |
| OPERATOR: Trackhoe Heavy SUUT2008-033 (Excluding Natural Gas Pipeline Construction) | $13.63 | 0.00 | $13.63 |
| Powderman Heavy LABO0295-018 | $21.65 | $8.65 | $30.30 |
| Sandblaster Heavy LABO0295-018 | $20.85 | $8.65 | $29.50 |
| SHEET METAL WORKER Building SHEE0312-001 (HVAC Duct Installation Only) | $46.79 | $14.89 | $61.68 |
| SPRINKLER FITTER Building SFUT0669-003 (Fire Sprinklers) | $42.17 | $26.63 | $68.80 |
| TRUCK DRIVER Heavy SUUT2008-033 (Excluding Natural Gas Pipeline Construction) | $12.00 | 0.00 | $12.00 |
| TRUCK DRIVER ZONE 1: Group 1 Heavy TEAM0222-003 | $41.71 | $14.75 | $56.46 |
| ZONE 2: Group 1 Heavy TEAM0222-003 | $46.18 | $14.90 | $61.08 |
No trade rates match your search and filter selection.
Heavy
Applies to
Beaver, Emery, Grand, Kane, Piute, Wayne in Utah.
Building
Applies to
Emery, Kane, Millard, Sevier, Wayne in Utah.