Wayne

3 wage determinations 71 trade rates

Popular Trades In Wayne

Track Wayne County updates

Get an email when wage determinations covering Wayne County, Utah are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BOILERMAKER Building
BOIL0004-001
$44.37 $26.87 $71.24
BRICKLAYER Building
SUUT2012-012
$23.88 0.00 $23.88
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) Building
SUUT2012-012
$20.64 $0.80 $21.44
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION Building
SUUT2012-012
$19.51 $4.71 $24.22
CARPENTER, INCLUDES FORM WORK Heavy
SUUT2008-033 (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK)
$14.75 $3.03 $17.78
CARPENTER, INCLUDES FORM WORK Highway
SUUT2019-014
$22.07 $6.88 $28.95
CEMENT MASON/CONCRETE FINISHER Heavy
SUUT2008-033
$14.00 $0.56 $14.56
CEMENT MASON/CONCRETE FINISHER Building
SUUT2012-012
$21.11 0.00 $21.11
CEMENT MASON/CONCRETE FINISHER Highway
SUUT2019-014
$17.36 $2.04 $19.40
ELECTRICIAN Highway
SUUT2019-014
$26.83 0.00 $26.83
ELECTRICIAN (EXCLUDING LOW VOLTAGE WIRING) Building
ELEC0354-003
$41.23 $17.66 $58.89
ELECTRICIAN (LOW VOLTAGE WIRING ONLY) Building
SUUT2012-012
$23.36 $6.06 $29.42
HIGHWAY/PARKING LOT STRIPING: PAINTER Highway
SUUT2019-014
$16.76 $1.62 $18.38
INSTALLER - GUARDRAIL Highway
SUUT2019-014
$17.79 0.00 $17.79
INSTALLER - SIDING (METAL/ALUMINUM/VINYL) Building
SUUT2012-012
$14.75 0.00 $14.75
INSTALLER - SIGN Highway
SUUT2019-014
$18.22 $2.79 $21.01
INSULATOR - BATT Building
SUUT2012-012
$13.77 0.00 $13.77
IRONWORKER, REINFORCING Building
SUUT2012-012
$15.00 0.00 $15.00
IRONWORKER, STRUCTURAL Building
SUUT2012-012
$17.41 $6.13 $23.54
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy
LABO0295-018
$20.85 $8.65 $29.50
LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy
LABO0295-018
$20.59 $8.65 $29.24
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy
LABO0295-018
$20.85 $8.65 $29.50
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy
LABO0295-018
$21.65 $8.65 $30.30
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy
LABO0295-018
$20.85 $8.65 $29.50
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway
SUUT2019-014
$19.88 $5.71 $25.59
LABORER: COMMON OR GENERAL Heavy
SUUT2008-033 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)
$10.92 0.00 $10.92
LABORER: COMMON OR GENERAL Building
SUUT2012-012
$10.63 0.00 $10.63
LABORER: COMMON OR GENERAL Highway
SUUT2019-014
$17.77 $3.95 $21.72
LABORER: LANDSCAPE Highway
SUUT2019-014
$14.45 $2.79 $17.24
LABORER: MASON TENDER - BRICK Building
SUUT2012-012
$16.54 0.00 $16.54
LABORER: MASON TENDER - CEMENT/CONCRETE Heavy
SUUT2008-033
$9.00 $0.36 $9.36
LABORER: MASON TENDER - CEMENT/CONCRETE Highway
SUUT2019-014
$17.03 $0.36 $17.39
LABORER: PIPELAYER Heavy
SUUT2008-033 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)
$9.00 0.00 $9.00
LABORER: PIPELAYER Highway
SUUT2019-014
$15.52 $2.79 $18.31
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Building
SUUT2012-012
$16.59 $0.79 $17.38
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway
SUUT2019-014
$22.10 $5.97 $28.07
OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway
SUUT2019-014
$20.05 $3.31 $23.36
OPERATOR: BROOM/SWEEPER Highway
SUUT2019-014
$18.29 $5.65 $23.94
OPERATOR: BULLDOZER Highway
SUUT2019-014
$21.77 $4.40 $26.17
OPERATOR: CONCRETE FINISHING MACHINE Highway
SUUT2019-014
$22.57 $6.55 $29.12
OPERATOR: GRADER/BLADE Highway
SUUT2019-014
$23.69 $5.95 $29.64
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION Heavy
SUUT2008-033
$13.61 0.00 $13.61
OPERATOR: LOADER Highway
SUUT2019-014
$22.53 $6.92 $29.45
OPERATOR: LOADER (FRONT END) Heavy
SUUT2008-033
$11.38 0.00 $11.38
OPERATOR: MECHANIC Highway
SUUT2019-014
$25.24 $10.96 $36.20
OPERATOR: MILLING MACHINE Highway
SUUT2019-014
$26.53 $6.00 $32.53
OPERATOR: OILER Highway
SUUT2019-014
$19.00 $5.44 $24.44
OPERATOR: PAVER Highway
SUUT2019-014 (ASPHALT, AGGREGATE, AND CONCRETE)
$23.43 $8.13 $31.56
OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR Heavy
ENGI0003-046
$30.78 $16.09 $46.87
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy
ENGI0003-054
$35.68 $17.57 $53.25
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY Heavy
ENGI0003-054
$22.03 $11.88 $33.91
OPERATOR: ROLLER Highway
SUUT2019-014
$20.23 $5.61 $25.84
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) Heavy
SUUT2008-033
$10.89 0.00 $10.89
OPERATOR: SCREED Highway
SUUT2019-014
$19.89 $5.45 $25.34
OPERATOR: TRACKHOE Heavy
SUUT2008-033 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)
$13.63 0.00 $13.63
PLUMBER Building
SUUT2012-012
$24.00 $4.62 $28.62
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) Building
SHEE0312-001
$46.79 $14.89 $61.68
SPRINKLER FITTER (FIRE SPRINKLERS) Building
SFUT0669-003
$42.17 $26.63 $68.80
TILE FINISHER Building
SUUT2012-012
$17.00 0.00 $17.00
TILE SETTER Building
SUUT2012-012
$19.40 0.00 $19.40
TRAFFIC CONTROL: FLAGGER Highway
SUUT2019-014
$12.47 $2.53 $15.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway
SUUT2019-014
$17.14 $2.79 $19.93
TRUCK DRIVER Heavy
SUUT2008-033 (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)
$12.00 0.00 $12.00
TRUCK DRIVER ZONE 1: GROUP 1 Heavy
TEAM0222-003
$41.71 $14.75 $56.46
TRUCK DRIVER ZONE 1: GROUP 2 Heavy
TEAM0222-003
$41.06 $15.75 $56.81
TRUCK DRIVER ZONE 1: GROUP 3 Heavy
TEAM0222-003
$40.66 $15.75 $56.41
TRUCK DRIVER ZONE 2: GROUP 1 Heavy
TEAM0222-003
$46.18 $14.90 $61.08
TRUCK DRIVER ZONE 2: GROUP 2 Heavy
TEAM0222-003
$45.57 $14.90 $60.47
TRUCK DRIVER ZONE 2: GROUP 3 Heavy
TEAM0222-003
$41.57 $14.90 $56.47
TRUCK DRIVER: DUMP TRUCK Highway
SUUT2019-014
$20.31 $4.06 $24.37
TRUCK DRIVER: WATER TRUCK Highway
TEAM0222-005
$29.53 $14.65 $44.18

Wage Determinations

Heavy

24 trades

Applies to

Beaver, Emery, Grand, Kane, Piute, Wayne

Building

19 trades

Applies to

Emery, Kane, Millard, Sevier, Wayne

Highway

28 trades

Applies to

Beaver, Wayne