Kane

3 wage determinations 59 trade rates

Popular Trades In Kane

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BOILERMAKER Building
BOIL0004-001
$44.37 $26.87 $71.24
BRICKLAYER Residential
SUUT1997-004
$7.25 $0.47 $7.72
BRICKLAYER Building
SUUT2012-012
$23.88 0.00 $23.88
CARPENTER Residential
SUUT1997-004
$7.25 $0.00 $7.25
CARPENTER Building
SUUT2012-012 (Acoustical Ceiling Installation Only)
$20.64 $0.80 $21.44
CARPENTER, Excludes Acoustical Ceiling Installation Building
SUUT2012-012
$19.51 $4.71 $24.22
CARPENTER, Includes Form Work Heavy
SUUT2008-033 (Excludes Natural Gas Pipeline Construction Form Work)
$14.75 $3.03 $17.78
CEMENT MASON/CONCRETE FINISHER Residential
SUUT1997-004
$7.25 $0.00 $7.25
CEMENT MASON/CONCRETE FINISHER Heavy
SUUT2008-033
$14.00 $0.56 $14.56
CEMENT MASON/CONCRETE FINISHER Building
SUUT2012-012
$21.11 0.00 $21.11
Common or General, Nail gun, Pipelayer, Pot Tender Heavy
LABO0295-018
$20.59 $8.65 $29.24
Drywall Mechanic Residential
SUUT1997-004
$7.25 $0.00 $7.25
ELECTRICIAN Residential
SUUT1997-004
$7.25 $0.00 $7.25
ELECTRICIAN Building
ELEC0354-003 (Excluding Low Voltage Wiring)
$41.23 $17.12 $58.35
ELECTRICIAN Building
SUUT2012-012 (Low Voltage Wiring Only)
$23.36 $6.06 $29.42
Formworker Heavy
LABO0295-018
$20.85 $8.65 $29.50
Group 2 Heavy
TEAM0222-003 Scope differs by code/WD
$41.06 $15.75 $56.81
Group 2 Heavy
TEAM0222-003 Scope differs by code/WD
$45.57 $14.90 $60.47
Group 3 Heavy
TEAM0222-003 Scope differs by code/WD
$40.66 $15.75 $56.41
Group 3 Heavy
TEAM0222-003 Scope differs by code/WD
$41.57 $14.90 $56.47
HVAC MECHANIC Residential
SUUT1997-004
$7.25 $0.00 $7.25
INSTALLER - SIDING Building
SUUT2012-012 (METAL/ALUMINUM/VINYL)
$14.75 0.00 $14.75
INSULATOR - BATT Building
SUUT2012-012
$13.77 0.00 $13.77
IRONWORKER, REINFORCING Building
SUUT2012-012
$15.00 0.00 $15.00
IRONWORKER, STRUCTURAL Building
SUUT2012-012
$17.41 $6.13 $23.54
LABORER Residential
SUUT1997-004
$7.25 $0.00 $7.25
LABORER Chain Saw and Power Drill Heavy
LABO0295-018
$20.85 $8.65 $29.50
LABORER: Common or General Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$10.92 0.00 $10.92
LABORER: Common or General Building
SUUT2012-012
$10.63 0.00 $10.63
LABORER: Mason Tender Residential
SUUT1997-004
$7.25 $0.00 $7.25
LABORER: Mason Tender - Brick Building
SUUT2012-012
$16.54 0.00 $16.54
LABORER: Mason Tender - Cement/Concrete Heavy
SUUT2008-033
$9.00 $0.36 $9.36
LABORER: Pipelayer Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$9.00 0.00 $9.00
Oiler Heavy
ENGI0003-054
$22.03 $11.88 $33.91
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUUT2012-012
$16.59 $0.79 $17.38
OPERATOR: Grader/Blade, Excludes Natural Gas Pipeline Construction Heavy
SUUT2008-033
$13.61 0.00 $13.61
OPERATOR: Loader (Front End) Heavy
SUUT2008-033
$11.38 0.00 $11.38
OPERATOR: PLUMBER Building
SUUT2012-012
$24.00 $4.62 $28.62
OPERATOR: Power Equipment Heavy
ENGI0003-046 (3)Backhoe/Excavator
$30.78 $16.09 $46.87
OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher Heavy
ENGI0003-054
$35.68 $17.57 $53.25
OPERATOR: Roller Heavy
SUUT2008-033 (Dirt and Grade Compaction)
$10.89 0.00 $10.89
OPERATOR: TILE FINISHER Building
SUUT2012-012
$17.00 0.00 $17.00
OPERATOR: TILE SETTER Building
SUUT2012-012
$19.40 0.00 $19.40
OPERATOR: Trackhoe Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$13.63 0.00 $13.63
PAINTER: Brush Only Residential
SUUT1997-004
$7.25 $0.00 $7.25
PLUMBER Residential
SUUT1997-004
$7.25 $0.00 $7.25
Powderman Heavy
LABO0295-018
$21.65 $8.65 $30.30
Power equipment operators: Bulldozers Residential
SUUT1997-004
$7.25 $0.00 $7.25
Power equipment operators: Cranes, Derricks, Draglines Residential
SUUT1997-004
$7.25 $0.00 $7.25
Power equipment operators: ROOFER Residential
SUUT1997-004
$7.25 $0.00 $7.25
Power equipment operators: Sheet metal worker Residential
SUUT1997-004
$7.25 $0.00 $7.25
Power equipment operators: Trenching machines Residential
SUUT1997-004
$7.25 $0.00 $7.25
Power equipment operators: TRUCK DRIVER Residential
SUUT1997-004
$7.25 $0.00 $7.25
Sandblaster Heavy
LABO0295-018
$20.85 $8.65 $29.50
SHEET METAL WORKER Building
SHEE0312-001 (HVAC Duct Installation Only)
$46.79 $14.89 $61.68
SPRINKLER FITTER Building
SFUT0669-003 (Fire Sprinklers)
$42.17 $26.63 $68.80
TRUCK DRIVER Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$12.00 0.00 $12.00
TRUCK DRIVER ZONE 1: Group 1 Heavy
TEAM0222-003
$41.71 $14.75 $56.46
ZONE 2: Group 1 Heavy
TEAM0222-003
$46.18 $14.90 $61.08

Wage Determinations

Residential

0 trades

Applies to

Kane, Millard in Utah.

Heavy

0 trades

Applies to

Beaver, Emery, Grand, Kane, Piute, Wayne in Utah.

Building

0 trades

Applies to

Emery, Kane, Millard, Sevier, Wayne in Utah.