Grand

1 wage determination 24 trade rates

Popular Trades In Grand

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
CARPENTER, Includes Form Work Heavy
SUUT2008-033 (Excludes Natural Gas Pipeline Construction Form Work)
$14.75 $3.03 $17.78
CEMENT MASON/CONCRETE FINISHER Heavy
SUUT2008-033
$14.00 $0.56 $14.56
Common or General, Nail gun, Pipelayer, Pot Tender Heavy
LABO0295-018
$20.59 $8.65 $29.24
Formworker Heavy
LABO0295-018
$20.85 $8.65 $29.50
Group 2 Heavy
TEAM0222-003 Scope differs by code/WD
$41.06 $15.75 $56.81
Group 2 Heavy
TEAM0222-003 Scope differs by code/WD
$45.57 $14.90 $60.47
Group 3 Heavy
TEAM0222-003 Scope differs by code/WD
$40.66 $15.75 $56.41
Group 3 Heavy
TEAM0222-003 Scope differs by code/WD
$41.57 $14.90 $56.47
LABORER Chain Saw and Power Drill Heavy
LABO0295-018
$20.85 $8.65 $29.50
LABORER: Common or General Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$10.92 0.00 $10.92
LABORER: Mason Tender - Cement/Concrete Heavy
SUUT2008-033
$9.00 $0.36 $9.36
LABORER: Pipelayer Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$9.00 0.00 $9.00
Oiler Heavy
ENGI0003-054
$22.03 $11.88 $33.91
OPERATOR: Grader/Blade, Excludes Natural Gas Pipeline Construction Heavy
SUUT2008-033
$13.61 0.00 $13.61
OPERATOR: Loader (Front End) Heavy
SUUT2008-033
$11.38 0.00 $11.38
OPERATOR: Power Equipment Heavy
ENGI0003-046 (3)Backhoe/Excavator
$30.78 $16.09 $46.87
OPERATOR: Power Equipment Backhoe/Excavator/Trackhoe, Blade/Grader, Boom, Bulldozer, Crane, Mechanic, Trencher Heavy
ENGI0003-054
$35.68 $17.57 $53.25
OPERATOR: Roller Heavy
SUUT2008-033 (Dirt and Grade Compaction)
$10.89 0.00 $10.89
OPERATOR: Trackhoe Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$13.63 0.00 $13.63
Powderman Heavy
LABO0295-018
$21.65 $8.65 $30.30
Sandblaster Heavy
LABO0295-018
$20.85 $8.65 $29.50
TRUCK DRIVER Heavy
SUUT2008-033 (Excluding Natural Gas Pipeline Construction)
$12.00 0.00 $12.00
TRUCK DRIVER ZONE 1: Group 1 Heavy
TEAM0222-003
$41.71 $14.75 $56.46
ZONE 2: Group 1 Heavy
TEAM0222-003
$46.18 $14.90 $61.08

Wage Determinations

Heavy

0 trades

Applies to

Beaver, Emery, Grand, Kane, Piute, Wayne in Utah.