Washington

1 wage determination 42 trade rates

Popular Trades In Washington

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
(4) Caisson Worker - Topman Building
LABO0113-001
$40.86 $23.92 $64.78
(5) Construction Specialist Building
LABO0113-001
$41.09 $23.92 $65.01
(6) Nozzleman Building
LABO0113-001
$41.13 $23.92 $65.05
(7) Caisson Work Building
LABO0113-001
$41.28 $23.92 $65.20
(8) Barco Tamper Building
LABO0113-001
$41.97 $23.92 $65.89
Asbestos Laborer Asbestos Abatement [Preparation, removal, and encapsulation of hazardous materials from non- mechanical systems] Building
LABO0113-010
$40.48 $23.92 $64.40
Asbestos Worker/Heat and Frost Insulator Building
SUWI2002-002
$25.36 $8.37 $33.73
BOILERMAKER Boilermaker Building
BOIL0107-001
$46.52 $34.63 $81.15
BRICKLAYER Building
BRWI0008-001
$45.72 $27.42 $73.14
Carpenter & Soft Floor Layer Building
CARP0231-001 (Including Acoustical work and Drywall hanging; Excluding Batt Insulation)
$45.46 $31.52 $76.98
CEMENT MASON/CONCRETE FINISHER Building
PLAS0599-004
$43.27 $25.69 $68.96
ELECTRICIAN Building
ELEC0494-001
$50.86 $28.26 $79.12
ELEVATOR MECHANIC Building
ELEV0015-001
$61.96 $38.44 $100.40
GLAZIER Building
PAIN1204-002
$49.79 $25.15 $74.94
Group 2 Building
ENGI0139-001
$54.71 $28.55 $83.26
Group 3 Building
ENGI0139-001
$54.21 $28.55 $82.76
Group 4 Building
ENGI0139-001
$52.72 $28.55 $81.27
Group 5 Building
ENGI0139-001
$48.74 $28.55 $77.29
Group 6 Building
ENGI0139-001
$43.59 $28.55 $72.14
IRONWORKER Building
IRON0008-005
$47.52 $33.67 $81.19
LABORER Building
LABO0113-001 (1) General Laborer (Including Plaster Tender)
$40.48 $23.92 $64.40
Laborers: Concrete Worker Building
SUWI2002-002
$16.34 $3.59 $19.93
Laborers: Landscape Building
SUWI2002-002
$8.73 $8.40 $17.13
Laborers: ROOFER Building
SUWI2002-002
$18.01 $3.28 $21.29
Laborers: Tile & Marble Finisher Building
SUWI2002-002
$13.89 $7.43 $21.32
Marble Mason Building
BRWI0008-003
$45.72 $27.42 $73.14
MILLWRIGHT Building
CARP2337-002
$44.03 $32.94 $76.97
Painters: (1) Brush, Roller Building
PAIN0781-001
$42.44 $24.87 $67.31
Painters: (2) Spray & Sandblast Building
PAIN0781-001
$43.19 $24.87 $68.06
Painters: (3) Drywall Taper/Finisher Building
PAIN0781-001
$42.79 $24.87 $67.66
PILEDRIVERMAN Building
CARP2337-008
$44.39 $34.79 $79.18
PIPEFITTER Building
PLUM0601-001 (Including HVAC work)
$58.92 $31.34 $90.26
PLASTERER Building
PLAS0599-005
$39.89 $28.04 $67.93
PLUMBER (Including HVAC work) Building
PLUM0075-001
$60.05 $27.90 $87.95
Power Equipment Operator Group 1 Building
ENGI0139-001
$55.21 $28.55 $83.76
Sheet Metal Worker Building
SHEE0018-001 (Including HVAC duct work and Technicians)
$58.03 $29.98 $88.01
Sound & Communications Installer Building
ELEC0494-003
$37.13 $21.58 $58.71
SPRINKLER FITTER Building
SFWI0183-001
$52.40 $34.31 $86.71
Technician Building
ELEC0494-003
$37.13 $21.58 $58.71
TERRAZZO WORKER Building
BRWI0005-001
$42.24 $26.78 $69.02
TILE LAYER Building
BRWI0005-001
$41.27 $26.78 $68.05
TRUCK DRIVER 1 & 2 Axles Building
TEAM0662-003
$39.57 $28.70 $68.27

Wage Determinations

Building

0 trades

Applies to

Milwaukee, Ozaukee, Washington, Waukesha in Wisconsin.