WV20260002
rev 1Residential
Applies to
Barbour, Boone, Braxton, Calhoun, Clay, Doddridge, Fayette, Gilmer, Grant, Greenbrier +33 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Lincoln County, West Virginia are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0002-002 | $46.50 | $29.43 | $75.93 | |
| BOILERMAKER Building BOIL0667-005 | $47.13 | $28.93 | $76.06 | |
| BRICKLAYER Residential SUWV1996-001 | $12.00 | 0.00 | $12.00 | |
| BRICKLAYER Building BRWV0009-006 (BRICKLAYER & BRICK POINTER/CAULKER/CLEANER) | $31.65 | $25.56 | $57.21 | |
| CARPENTER Building CARP0439-003 (INCLUDING DRYWALL HANGING, FORM WORK, SCAFFOLD BUILDER AND FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL) | $33.84 | $25.51 | $59.35 | |
| CARPENTER Heavy CARP0302-001 (INCLUDES FORM WORK; EXCLUDES SCAFFOLD BUILDER) | $29.00 | $22.41 | $51.41 | |
| CARPENTER Highway SUWV2022-028 | $27.72 | $19.44 | $47.16 | |
| CARPENTER (SCAFFOLD BUILDER ONLY) Heavy CARP1207-003 | $29.00 | $22.41 | $51.41 | |
| CARPENTER, INCLUDING DRYWALL HANGING Residential SUWV1996-001 | $10.31 | 0.00 | $10.31 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUWV1996-001 | $9.40 | 0.00 | $9.40 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0926-010 Scope differs by code/WD | $32.52 | $22.34 | $54.86 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0926-011 Scope differs by code/WD | $34.77 | $26.66 | $61.43 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0926-001 | $35.77 | $27.54 | $63.31 | |
| CEMENT MASON/CONCRETE FINISHER Highway SUWV2022-028 | $28.67 | $18.85 | $47.52 | |
| ELECTRICIAN Residential SUWV1996-001 | $10.41 | 0.00 | $10.41 | |
| ELECTRICIAN Building ELEC0317-003 | $32.75 | $15.00 | $47.75 | |
| ELECTRICIAN Heavy SUWV2012-075 | $28.70 | $17.12 | $45.82 | |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) Building ELEC0466-009 | $39.00 | $23.45 | $62.45 | |
| GLAZIER Building PAIN1195-002 | $32.89 | $13.38 | $46.27 | |
| INSULATOR - PIPE & PIPEWRAPPER Heavy ASBE0080-003 | $38.05 | $28.47 | $66.52 | |
| IRONWORKER Highway SUWV2022-028 | $34.87 | $19.50 | $54.37 | |
| IRONWORKER (REINFORCING AND STRUCTURAL) Building IRON0787-004 | $36.10 | $24.65 | $60.75 | |
| IRONWORKER: ORNAMENTAL Building IRON0549-006 | $35.19 | $25.66 | $60.85 | |
| IRONWORKER: ORNAMENTAL Heavy IRON0549-011 | $35.50 | $29.11 | $64.61 | |
| IRONWORKER: REINFORCING AND STRUCTURAL Heavy IRON0787-005 | $36.10 | $24.65 | $60.75 | |
| LABORER: AIR TOOL OPERATOR Heavy LABO1353-007 | $29.05 | $16.95 | $46.00 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway LADC0001-007 | $29.00 | $17.40 | $46.40 | |
| LABORER: COMMON OR GENERAL Highway LADC0001-001 | $29.00 | $17.40 | $46.40 | |
| LABORER: GRADE CHECKER Heavy LABO1353-007 | $29.05 | $16.95 | $46.00 | |
| LABORER: GRADE CHECKER Highway LADC0001-004 | $29.00 | $17.40 | $46.40 | |
| LABORER: GROUP 1 ASPHALT RAKER, CHAIN SAW, CONCRETE SAW Heavy LABO0379-025 (HAND HELD/WALK BEHIND), CONCRETE WORKER, HAND HELD DRILL | $26.32 | $16.50 | $42.82 | |
| LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, DEMOLITION, LANDSCAPE, WATER BOY Building LABO1353-005 | $24.16 | $17.25 | $41.41 | |
| LABORER: GROUP 2 BOBCAT OPERATOR Building LABO1353-005 (CLEAN UP/DEMOLITION), CHIPPING GUNS, CONCRETE SAW (HAND HELD/WALK BEHIND), CONCRETE WORKER, FENCE ERECTION, GRADE CHECKER, JACK HAMMER, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WACKER ROLLER OPERATOR | $24.78 | $17.25 | $42.03 | |
| LABORER: GROUP 2 CARPENTER TENDER, COMMON OR GENERAL, FLAGGER Heavy LABO0379-025 | $25.26 | $16.50 | $41.76 | |
| LABORER: GROUP 3 PIPELAYER Building LABO1353-005 | $25.62 | $17.25 | $42.87 | |
| LABORER: GUARDRAIL INSTALLATION Highway LADC0001-008 | $29.00 | $17.40 | $46.40 | |
| LABORER: LASER SCREED OPERATOR Highway LADC0001-006 | $30.03 | $17.40 | $47.43 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Highway SUWV2022-028 | $26.59 | $16.30 | $42.89 | |
| LABORER: MASON TENDER-CEMENT/CONCRETE Heavy LABO1353-007 | $29.05 | $16.95 | $46.00 | |
| LABORER: PIPELAYER Heavy SUWV2012-075 | $22.82 | $10.95 | $33.77 | |
| LABORER: PIPELAYER Highway LADC0001-010 | $29.00 | $17.40 | $46.40 | |
| LABORER: WACKER ROLLER OPERATOR Heavy LABO1353-007 | $29.05 | $16.95 | $46.00 | |
| LABORERS: LANDSCAPE Residential SUWV1996-001 | $7.58 | 0.00 | $7.58 | |
| LABORERS: UNSKILLED Residential SUWV1996-001 | $7.25 | 0.00 | $7.25 | |
| MASON - STONE Building BRWV0009-008 | $31.65 | $25.56 | $57.21 | |
| MILLWRIGHT Building CARP0443-009 | $37.40 | $26.06 | $63.46 | |
| MILLWRIGHT Heavy CARP0443-008 | $39.60 | $26.06 | $65.66 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway ENGI0132-003 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Heavy SUWV2012-075 | $25.28 | $14.99 | $40.27 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway ENGI0132-004 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: BOOM Heavy SUWV2012-075 | $28.71 | $11.59 | $40.30 | |
| OPERATOR: BROOM/SWEEPER Highway ENGI0132-005 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: BULLDOZER Highway ENGI0132-030 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: CRANE Heavy SUWV2012-075 | $25.43 | $13.10 | $38.53 | |
| OPERATOR: CRANE Highway ENGI0132-002 | $40.35 | $20.30 | $60.65 | |
| OPERATOR: DRILL Highway ENGI0132-031 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: EXCAVATOR Heavy SUWV2012-075 | $24.39 | $15.50 | $39.89 | |
| OPERATOR: FORKLIFT Highway ENGI0132-032 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: GRADER/BLADE Highway ENGI0132-033 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: LOADER Highway ENGI0132-036 (UP TO SIX (6) CUBIC YARD CAPACITY) | $37.59 | $20.30 | $57.89 | |
| OPERATOR: MECHANIC Highway ENGI0132-037 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: MILLING MACHINE Highway ENGI0132-034 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: OILER Heavy SUWV2012-075 | $21.44 | $14.42 | $35.86 | |
| OPERATOR: PAVER Heavy SUWV2012-075 (ASPHALT, AGGREGATE, AND CONCRETE) | $24.39 | $15.50 | $39.89 | |
| OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT Highway ENGI0132-035 (ASPHALT, AGGREGATE, & CONCRETE) | $37.59 | $20.30 | $57.89 | |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) Highway ENGI0132-038 | $37.59 | $20.30 | $57.89 | |
| OPERATOR: ROLLER Highway SUWV2022-028 | $29.38 | $18.60 | $47.98 | |
| PAINTER Building PAIN0970-008 (DRYWALL FINISHING/TAPING; BRUSH, ROLLER AND SPRAY) | $30.85 | $17.80 | $48.65 | |
| PAINTER: SPRAY Heavy PAIN1144-006 | $34.49 | $17.53 | $52.02 | |
| PAINTERS: Residential SUWV1996-001 (BRUSH, ROLLER, SPRAY, INCLUDING DRYWALL FINISHING) | $10.38 | 0.00 | $10.38 | |
| PILEDRIVERMAN Heavy SUWV2012-075 | $25.05 | $8.33 | $33.38 | |
| PIPEFITTER Building PLUM0083-004 | $38.04 | $39.72 | $77.76 | |
| PIPELINE: OPERATOR-EXCAVATOR Heavy ENGI0132-028 | $41.95 | $20.45 | $62.40 | |
| PLASTERER (EIFS) Building PLAS0926-011 | $32.52 | $22.34 | $54.86 | |
| PLUMBER Building PLUM0565-004 | $41.00 | $37.63 | $78.63 | |
| PLUMBER (EXCLUDING HVAC PIPE WORK) Residential SUWV1996-001 | $11.50 | 0.00 | $11.50 | |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE Heavy ENGI0132-025 (TOWER), LOADERS OF SIX (6) CUBIC YARD CAPACITY AND OVER | $41.95 | $20.45 | $62.40 | |
| POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX Heavy ENGI0132-025 (6) CUBIC YARD CAPACITY, BACKHOE, BULLDOZERS, COMPACTOR, FORKLIFT, GRADER/BLADE, MECHANIC, TRACTOR, TRENCHER | $39.19 | $20.45 | $59.64 | |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER Building ENGI0132-011 | $46.21 | $22.05 | $68.26 | |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS Building ENGI0132-011 | $45.21 | $22.05 | $67.26 | |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER Heavy ENGI0132-025 | $38.08 | $20.45 | $58.53 | |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER Building ENGI0132-011 | $34.71 | $22.05 | $56.76 | |
| ROOFER Residential SUWV1996-001 | $9.40 | 0.00 | $9.40 | |
| ROOFER Building ROOF0034-003 | $29.75 | $16.71 | $46.46 | |
| SHEET METAL MECHANIC (INCLUDING DUCT WORK) Residential SUWV1996-001 | $10.00 | $0.53 | $10.53 | |
| SHEET METAL WORKER Building SHEE0033-013 (INCLUDES HVAC DUCT INSTALLATION) | $32.07 | $27.52 | $59.59 | |
| TILE FINISHER Building BRWV0015-014 | $27.00 | $22.57 | $49.57 | |
| TILE SETTER Building BRWV0009-007 | $31.65 | $25.56 | $57.21 | |
| TRAFFIC CONTROL PERSON Highway LADC0001-002 | $27.91 | $17.40 | $45.31 | |
| TRAFFIC SIGNALIZATION: GROUNDSMAN Highway ELEC0317-006 | $22.12 | $26.26 | $48.38 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUWV2022-028 | $29.04 | $16.15 | $45.19 | |
| TRUCK DRIVER: GROUP 1 SINGLE AXLE TRUCKS USED AS DUMPS, PICK-UP TRUCKS Heavy TEAM0175-007 | $27.12 | $16.60 | $43.72 | |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK Building TEAM0175-005 (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 | $52.31 | |
| TRUCK DRIVER: GROUP 2 TANDEM AND TRI-AXLE TRUCKS USED AS DUMPS, TRUCK TRACTORS USED IN COMBINATION WITH DUMP, FLATBED TRUCK Heavy TEAM0175-007 | $27.91 | $16.60 | $44.51 | |
| TRUCK DRIVER: GROUP 3 DUMP TRUCK Building TEAM0175-005 (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 | $52.46 | |
| TRUCK DRIVER: GROUP 3 OFF THE ROAD TRUCKS, REAR DUMP TRUCKS, ARTICULATING DUMPS, TRACTOR HAUL TRUCK Heavy TEAM0175-007 | $28.59 | $16.60 | $45.19 |
No trade rates match your search and filter selection.
Residential
Applies to
Barbour, Boone, Braxton, Calhoun, Clay, Doddridge, Fayette, Gilmer, Grant, Greenbrier +33 more
Building
Heavy
Applies to
Clay, Lincoln
Highway
Applies to
Boone, Jackson, Lincoln