DC20260001

HeavyHighway

Davis-Bacon Act general wage determination for heavy, highway construction in District of Columbia.

Modification 4, revised 05/18/2026 65 trade rates 2 counties View on SAM.gov

Track DC20260001

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0024-001 Effective 10/01/2024
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT AND FROST INSULATOR (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) $40.77 $20.17 $60.94
BOIL0193-001 Effective 01/01/2025
Trade Rate Fringe Total
BOILERMAKERS $47.37 $25.60 $72.97
BRDC0001-001 Effective 04/27/2025
Trade Rate Fringe Total
BRICKLAYER $38.80 $15.17 $53.97
BRMD0001-004 Effective 04/27/2025
Trade Rate Fringe Total
BRICKLAYER: REFRACTORY (FIREBRICK) $43.94 $17.74 $61.68
CARP0197-010 Effective 05/01/2024
Trade Rate Fringe Total
CARPENTER/LATHER $34.41 $14.33 $48.74
CARP0219-001 Effective 05/01/2025
Trade Rate Fringe Total
MILLWRIGHT $39.50 $17.32 $56.82
CARP0474-006 Effective 05/01/2024
Trade Rate Fringe Total
PILEDRIVERMAN $36.60 $14.47 $51.07
CARP0474-007 Effective 05/01/2024
Trade Rate Fringe Total
DIVER TENDER $36.60 $14.47 $51.07
DIVER $43.92 $14.47 $58.39
ELEC0026-001 Effective 06/02/2025
Trade Rate Fringe Total
ELECTRICIANS $59.50 $23.06 $82.56
ELEC0070-001 Effective 05/05/2024
Trade Rate Fringe Total
LINE CONSTRUCTION: TRUCK DRIVER $23.00 $12.76 $35.76
LINE CONSTRUCTION: LINEMEN $44.56 $17.50 $62.06
LINE CONSTRUCTION: GROUNDMEN $18.00 $11.66 $29.66
LINE CONSTRUCTION: EQUIPMENT OPERATORS $44.56 $17.50 $62.06
LINE CONSTRUCTION: CABLE SPLICERS $44.56 $17.50 $62.06
ENGI0077-001 Effective 05/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 BOILERS (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY $31.09 $13.27 $44.36
POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 CRANES, HOISTS, DRILL RIGS (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY $40.73 $13.27 $54.00
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2- 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS (+50,000 LBS TORQUE), MOLE, MECHANIC. FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY $43.44 $13.27 $56.71
ENGI0077-002 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 5 MECHANIC $37.93 $10.97 $48.90
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 4 AIR COMPRESSOR, GRADE ROLLERS $25.14 $11.17 $36.31
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 3 BROOM TRUCK, ASPHALT ROLLER $28.09 $11.17 $39.26
POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 1 GRADALL OPERATOR, CRANE $37.07 $11.17 $48.24
ENGI0077-003 Effective 07/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6 $25.89 $11.55 $37.44
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5 $31.16 $11.55 $42.71
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4 $33.26 $11.55 $44.81
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3 $33.80 $11.55 $45.35
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2 $35.00 $11.55 $46.55
POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1 $41.40 $11.55 $52.95
IRON0005-005 Effective 06/01/2024
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL AND ORNAMENTAL $37.86 $25.86 $63.72
IRON0005-012 Effective 05/01/2024
Trade Rate Fringe Total
IRONWORKER, REINFORCING $31.88 $23.78 $55.66
LABO0011-003 Effective 06/01/2025
Trade Rate Fringe Total
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8 $37.95 $8.70 $46.65
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7 $36.81 $8.70 $45.51
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6 $35.93 $8.70 $44.63
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5 $35.00 $8.70 $43.70
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4 $34.32 $8.70 $43.02
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3 $34.27 $8.70 $42.97
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2 $34.27 $8.70 $42.97
LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1 $33.25 $8.70 $41.95
LABO0011-004 Effective 06/01/2025
Trade Rate Fringe Total
LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) $32.25 $8.70 $40.95
LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) $32.25 $8.70 $40.95
LABO0011-005 Effective 06/01/2025
Trade Rate Fringe Total
LABORERS GROUP 4 $39.29 $8.70 $47.99
LABORERS GROUP 3 $38.17 $8.70 $46.87
LABORERS GROUP 2 $35.48 $8.70 $44.18
LABORERS GROUP 1 $34.41 $8.70 $43.11
LABO0011-006 Effective 06/01/2025
Trade Rate Fringe Total
LABORERS: $44.04 $8.70 $52.74
LABORERS: $51.82 $8.70 $60.52
LABO0011-007 Effective 09/01/2025
Trade Rate Fringe Total
LABORERS:, ASPHALT SHOVELER (PAVING AND INCIDENTAL GRADING) $23.27 $8.74 $32.01
LABORERS: SAND SETTER & FORM SETTER (PAVING AND INCIDENTAL GRADING) $25.10 $8.74 $33.84
LABORERS: LABORER (PAVING AND INCIDENTAL GRADING) $23.06 $8.74 $31.80
LABORERS: JACK HAMMER (PAVING AND INCIDENTAL GRADING) $23.89 $8.74 $32.63
LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER (PAVING AND INCIDENTAL GRADING) $23.86 $8.74 $32.60
LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR (PAVING AND INCIDENTAL GRADING) $24.30 $8.74 $33.04
LABO0011-008 Effective 06/01/2025
Trade Rate Fringe Total
LABORERS: BRICK MASONRY WORK (SCAFFOLD BUILDERS, MORTARMEN) $24.96 $8.70 $33.66
LABORERS: BRICK MASONRY WORK (MASON TENDERS) $24.31 $8.70 $33.01
MARB0002-003 Effective 04/27/2025
Trade Rate Fringe Total
MARBLE & STONE MASON (INCLUDES POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT STRUCTURES) $45.65 $21.21 $66.86
MARB0003-001 Effective 04/27/2025
Trade Rate Fringe Total
MOSAIC & TERRAZZO WORKER, TILE LAYER $34.34 $14.20 $48.54
MARB0003-004 Effective 04/27/2025
Trade Rate Fringe Total
MARBLE, TILE & TERRAZZO FINISHER $28.85 $12.55 $41.40
PAIN0051-001 Effective 06/01/2025
Trade Rate Fringe Total
PAINTERS: (COMMERCIAL AND MOLD REMEDIATION, PAINTERS, WALLCOVERS AND DRYWALL FINISHERS) $29.16 $11.86 $41.02
PLAS0891-001 Effective 03/01/2025
Trade Rate Fringe Total
CEMENT MASONS: (HEAVY CONSTRUCTION ONLY) $30.50 $14.23 $44.73
PLAS0891-002 Effective 06/01/2025
Trade Rate Fringe Total
CEMENT MASONS: FORM SETTERS (PAVING & INCIDENTAL GRADING) $23.50 $9.75 $33.25
CEMENT MASONS: CONCRETE SAW OPERATORS (PAVING & INCIDENTAL GRADING) $23.50 $9.75 $33.25
CEMENT MASONS: CEMENT MASONS (PAVING & INCIDENTAL GRADING) $23.50 $9.75 $33.25
TEAM0639-001 Effective 06/01/2025
Trade Rate Fringe Total
TRUCK DRIVERS:, HEAVY & HIGHWAY CONSTRUCTION: TRUCK DRIVERS A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE $31.75 $7.30 $39.05
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION: TRACTOR TRAILER, LOW BOY A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE $33.75 $7.30 $41.05
TEAM0639-005 Effective 06/01/2025
Trade Rate Fringe Total
TRUCK DRIVERS: PAVING & INCIDENTAL GRADING: ALL PAVING PROJECTS WHERE THE GRADING IS INCIDENTAL TO THE PAVING A. VACATION: EMPLOYEES WILL RECEIVE ONE (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE $31.75 $7.30 $39.05

Modification History

Modification Publication Date
3 01/23/2026
4 05/18/2026

Counties Covered

This wage determination applies to 2 counties in District of Columbia.

Get notified when DC20260001 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.