DC20260001
rev 4Heavy, Highway
65 trades
Applies to
Washington, D.C
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering D.C County, District of Columbia are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0024-007 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 | $60.94 | |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR Heavy ASBE0024-001 (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS.) | $40.77 | $20.17 | $60.94 | |
| BOILERMAKERS Heavy BOIL0193-001 | $47.37 | $25.60 | $72.97 | |
| BRICKLAYER Heavy BRDC0001-001 | $38.80 | $15.17 | $53.97 | |
| BRICKLAYER Building BRDC0001-002 | $38.80 | $15.17 | $53.97 | |
| BRICKLAYER Residential SUDC2009-004 | $20.71 | 0.00 | $20.71 | |
| BRICKLAYER: REFRACTORY (FIREBRICK) Heavy BRMD0001-004 | $43.94 | $17.74 | $61.68 | |
| CARPENTER, INCLUDING DRYWALL HANGING Residential SUDC2009-004 | $17.43 | $2.37 | $19.80 | |
| CARPENTER: INCLUDES DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYING-CARPET Building CARP0197-011 | $34.41 | $14.33 | $48.74 | |
| CARPENTER/LATHER Heavy CARP0197-010 | $34.41 | $14.33 | $48.74 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0891-006 | $30.50 | $14.23 | $44.73 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUDC2009-004 | $18.72 | 0.00 | $18.72 | |
| CEMENT MASONS: (HEAVY CONSTRUCTION ONLY) Heavy PLAS0891-001 | $30.50 | $14.23 | $44.73 | |
| CEMENT MASONS: CEMENT MASONS Heavy PLAS0891-002 (PAVING & INCIDENTAL GRADING) | $23.50 | $9.75 | $33.25 | |
| CEMENT MASONS: CONCRETE SAW OPERATORS Heavy PLAS0891-002 (PAVING & INCIDENTAL GRADING) | $23.50 | $9.75 | $33.25 | |
| CEMENT MASONS: FORM SETTERS Heavy PLAS0891-002 (PAVING & INCIDENTAL GRADING) | $23.50 | $9.75 | $33.25 | |
| DIVER Heavy CARP0474-007 | $43.92 | $14.47 | $58.39 | |
| DIVER TENDER Heavy CARP0474-007 | $36.60 | $14.47 | $51.07 | |
| DRYWALL FINISHER/TAPER Residential SUDC2009-004 | $15.00 | 0.00 | $15.00 | |
| ELECTRICAL INSTALLER Building ELEC0026-017 (SOUND & COMMUNICATION SYSTEMS) SCOPE OF WORK: INCLUDES LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, VSAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). WORK EXCLUDED: THE INSTALLATION OF COMPUTER SYSTEMS IN INDUSTRIAL APPLICATIONS SUCH AS ASSEMBLY LINES, ROBOTICS AND COMPUTER CONTROLLER MANUFACTURING SYSTEMS. THE INSTALLATION OF CONDUIT AND/OR RACEWAYS SHALL BE INSTALLED BY INSIDE WIREMEN. ON SITES WHERE THERE IS NO INSIDE WIREMAN EMPLOYED, THE TELEDATA TECHNICIAN MAY INSTALL RACEWAY OR CONDUIT NOT GREATER THAN 10 FEET. FIRE ALARM WORK IS EXCLUDED ON ALL NEW CONSTRUCTION SITES OR WHEREVER THE FIRE ALARM SYSTEM IS INSTALLED IN CONDUIT. ALL HVAC CONTROL WORK | $34.16 | $13.54 | $47.70 | |
| ELECTRICIAN Residential SUDC2009-004 | $19.93 | $3.11 | $23.04 | |
| ELECTRICIAN: INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS Building ELEC0026-016 | $59.50 | $23.06 | $82.56 | |
| ELECTRICIANS Heavy ELEC0026-001 | $59.50 | $23.06 | $82.56 | |
| GLAZIER (GLAZING CONTRACTS OVER $2 MILLION) Building PAIN0051-014 | $36.65 | $14.46 | $51.11 | |
| GLAZIER: GLAZING CONTRACTS $2 MILLION AND UNDER Building PAIN0051-014 | $32.41 | $14.46 | $46.87 | |
| IRONWORKER, REINFORCING Heavy IRON0005-012 | $31.88 | $23.78 | $55.66 | |
| IRONWORKER, REINFORCING Building IRON0005-012 | $31.88 | $23.78 | $55.66 | |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL Heavy IRON0005-005 | $37.86 | $25.86 | $63.72 | |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL Building IRON0005-005 | $37.86 | $25.86 | $63.72 | |
| LABORER: COMMON OR GENERAL Building SUDC2009-003 | $13.04 | $2.80 | $15.84 | |
| LABORER: COMMON OR GENERAL Residential SUDC2009-004 | $12.54 | 0.00 | $12.54 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Building SUDC2009-003 | $15.40 | $2.85 | $18.25 | |
| LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES Building SUDC2009-003 (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT | $11.67 | 0.00 | $11.67 | |
| LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES Residential SUDC2009-004 (RESTORATION WORK); EXCLUDES POINTING, CAULKING AND CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE AND CEMENT | $12.59 | 0.00 | $12.59 | |
| LABORER: SKILLED Building LABO0011-009 | $30.47 | $8.70 | $39.17 | |
| LABORERS GROUP 1 Heavy LABO0011-005 | $34.41 | $8.70 | $43.11 | |
| LABORERS GROUP 2 Heavy LABO0011-005 | $35.48 | $8.70 | $44.18 | |
| LABORERS GROUP 3 Heavy LABO0011-005 | $38.17 | $8.70 | $46.87 | |
| LABORERS GROUP 4 Heavy LABO0011-005 | $39.29 | $8.70 | $47.99 | |
| LABORERS: Heavy LABO0011-006 Scope differs by code/WD | $44.04 | $8.70 | $52.74 | |
| LABORERS: Heavy LABO0011-006 Scope differs by code/WD | $51.82 | $8.70 | $60.52 | |
| LABORERS: ASPHALT RAKER & CONCRETE SAW OPERATOR Heavy LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $24.30 | $8.74 | $33.04 | |
| LABORERS: ASPHALT TAMPER & CONCRETE SHOVELER Heavy LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $23.86 | $8.74 | $32.60 | |
| LABORERS: BRICK MASONRY WORK Heavy LABO0011-008 (SCAFFOLD BUILDERS, MORTARMEN) | $24.96 | $8.70 | $33.66 | |
| LABORERS: BRICK MASONRY WORK (MASON TENDERS) Heavy LABO0011-008 | $24.31 | $8.70 | $33.01 | |
| LABORERS: JACK HAMMER Heavy LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $23.89 | $8.74 | $32.63 | |
| LABORERS: LABORER (PAVING AND INCIDENTAL GRADING) Heavy LABO0011-007 | $23.06 | $8.74 | $31.80 | |
| LABORERS: SAND SETTER & FORM SETTER Heavy LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $25.10 | $8.74 | $33.84 | |
| LABORERS:, ASPHALT SHOVELER Heavy LABO0011-007 (PAVING AND INCIDENTAL GRADING) | $23.27 | $8.74 | $32.01 | |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 1 Heavy LABO0011-003 | $33.25 | $8.70 | $41.95 | |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 2 Heavy LABO0011-003 | $34.27 | $8.70 | $42.97 | |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 3 Heavy LABO0011-003 | $34.27 | $8.70 | $42.97 | |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 4 Heavy LABO0011-003 | $34.32 | $8.70 | $43.02 | |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 5 Heavy LABO0011-003 | $35.00 | $8.70 | $43.70 | |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 6 Heavy LABO0011-003 | $35.93 | $8.70 | $44.63 | |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 7 Heavy LABO0011-003 | $36.81 | $8.70 | $45.51 | |
| LABORERS:, HEAVY AND HIGHWAY AND SEWER & WATER LINES CONSTRUCTION: GROUP 8 Heavy LABO0011-003 | $37.95 | $8.70 | $46.65 | |
| LABORERS:, SKILLED ASBESTOS ABATEMENT LABORERS Heavy LABO0011-004 (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $32.25 | $8.70 | $40.95 | |
| LABORERS:, SKILLED TOXIC AND HAZARDOUS WASTE REMOVAL LABORERS Heavy LABO0011-004 (HAZARDOUS WASTE REMOVAL, EXCEPT ON MECHANICAL SYSTEMS: PREPARATION FOR, REMOVING AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS) | $32.25 | $8.70 | $40.95 | |
| LINE CONSTRUCTION: CABLE SPLICERS Heavy ELEC0070-001 | $44.56 | $17.50 | $62.06 | |
| LINE CONSTRUCTION: EQUIPMENT OPERATORS Heavy ELEC0070-001 | $44.56 | $17.50 | $62.06 | |
| LINE CONSTRUCTION: GROUNDMEN Heavy ELEC0070-001 | $18.00 | $11.66 | $29.66 | |
| LINE CONSTRUCTION: LINEMEN Heavy ELEC0070-001 | $44.56 | $17.50 | $62.06 | |
| LINE CONSTRUCTION: TRUCK DRIVER Heavy ELEC0070-001 | $23.00 | $12.76 | $35.76 | |
| MARBLE & STONE MASON Heavy MARB0002-003 (INCLUDES POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT STRUCTURES) | $45.65 | $21.21 | $66.86 | |
| MARBLE, TILE & TERRAZZO FINISHER Heavy MARB0003-004 | $28.85 | $12.55 | $41.40 | |
| MILLWRIGHT Heavy CARP0219-001 | $39.50 | $17.32 | $56.82 | |
| MILLWRIGHT Building CARP0219-001 | $39.50 | $17.32 | $56.82 | |
| MOSAIC & TERRAZZO WORKER, TILE LAYER Heavy MARB0003-001 | $34.34 | $14.20 | $48.54 | |
| PAINTER: BRUSH AND ROLLER Residential SUDC2009-004 | $15.32 | $5.15 | $20.47 | |
| PAINTER: BRUSH, ROLLER, SPRAY AND DRYWALL FINISHER Building PAIN0051-015 | $29.16 | $11.86 | $41.02 | |
| PAINTERS: Heavy PAIN0051-001 (COMMERCIAL AND MOLD REMEDIATION, PAINTERS, WALLCOVERS AND DRYWALL FINISHERS) | $29.16 | $11.86 | $41.02 | |
| PILEDRIVERMAN Heavy CARP0474-006 | $36.60 | $14.47 | $51.07 | |
| PILEDRIVERMAN Building CARP0474-006 | $36.60 | $14.47 | $51.07 | |
| PIPEFITTER Residential PLUM0602-009 (HVAC PIPE INSTALLATION) A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY | $55.00 | $24.46 | $79.46 | |
| PLASTERER (INCLUDING FIREPROOFING) Building PLAS0891-005 | $32.86 | $10.46 | $43.32 | |
| POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES Building SUDC2009-003 (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT | $18.88 | 0.00 | $18.88 | |
| POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES Residential SUDC2009-004 (RESTORATION WORK); EXCLUDES POINTING, CAULKING, CLEANING OF NEW OR REPLACEMENT MASONRY, BRICK, STONE OR CEMENT | $18.33 | 0.00 | $18.33 | |
| POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2- 35 TON CRANES & ABOVE, DERRICKS, CONCRETE BOOM PUMP, DRILL RIGS Heavy ENGI0077-001 (+50,000 LBS TORQUE), MOLE, MECHANIC. FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $43.44 | $13.27 | $56.71 | |
| POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3 CRANES, HOISTS, DRILL RIGS Heavy ENGI0077-001 (UNDER 50,000 LBS TORQUE), TIE BACK MACHINES, PAVING MIXERS, TUNNEL SHOVELS, BATCH PLANTS, SHIELDS, TUNNEL MINING MACHINES, DRAGLINES, MUCKING MACHINES, GRADERS IN TUNNELS, PILE DRIVING ENGINES, WELDER, HORIZONTAL DIRECTIONAL DRILL OPERATOR, TUG BOATS. A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $40.73 | $13.27 | $54.00 | |
| POWER EQUIPMENT OPERATORS:, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5 BOILERS Heavy ENGI0077-001 (SKELTON), ASPHALT SPREADERS, BULLFLOAT FINISHING MACHINES, CONCRETE FINISHING MACHINES, CONCRETE SPREADERS,CONCRETE MIXER, CONCRETE PUMP, WELL POINTS, HYDRAULIC PUMPS, ELEVATORS, FREEZE UNIITS, TUNNEL MOTORMAN OR DINKY OPERATOR, CONVEYORS, GROUT PUMP, FIREMAN, ULTRA HIGH PRESSURE WATER JET CUTTING TOOL SYSTEM OPERATOR/MECHANIC, HORIZONTAL DIRECTIONAL DRILL LOCATOR, SKID STEERS (FINE GRADING), HIGH LIFTS (LULL TYPE LIFTS). A. PAID HOLIDAYS: NEW YEARS DAY, INAUGURAL DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, MARTIN LUTHER KING'S BIRTHDAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $31.09 | $13.27 | $44.36 | |
| POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 1 GRADALL OPERATOR, CRANE Heavy ENGI0077-002 | $37.07 | $11.17 | $48.24 | |
| POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 3 BROOM TRUCK, ASPHALT ROLLER Heavy ENGI0077-002 | $28.09 | $11.17 | $39.26 | |
| POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 4 AIR COMPRESSOR, GRADE ROLLERS Heavy ENGI0077-002 | $25.14 | $11.17 | $36.31 | |
| POWER EQUIPMENT OPERATORS:, PAVING AND INCIDENTAL GRADING: GROUP 5 MECHANIC Heavy ENGI0077-002 | $37.93 | $10.97 | $48.90 | |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 1 Heavy ENGI0077-003 | $41.40 | $11.55 | $52.95 | |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 2 Heavy ENGI0077-003 | $35.00 | $11.55 | $46.55 | |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 3 Heavy ENGI0077-003 | $33.80 | $11.55 | $45.35 | |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 4 Heavy ENGI0077-003 | $33.26 | $11.55 | $44.81 | |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 5 Heavy ENGI0077-003 | $31.16 | $11.55 | $42.71 | |
| POWER EQUIPMENT OPERATORS:, SEWER, GAS AND WATER LINE CONSTRUCTION: GROUP 6 Heavy ENGI0077-003 | $25.89 | $11.55 | $37.44 | |
| ROOFER Building ROOF0030-016 | $36.26 | $14.91 | $51.17 | |
| ROOFER Residential SUDC2009-004 | $26.33 | 0.00 | $26.33 | |
| SHEET METAL WORKER Residential SUDC2009-004 | $18.33 | 0.00 | $18.33 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SFDC0669-002 | $45.22 | $27.69 | $72.91 | |
| TERRAZZO FINISHER Building MARB0003-007 | $28.85 | $12.55 | $41.40 | |
| TERRAZZO WORKER/SETTER Building MARB0003-006 | $34.34 | $14.20 | $48.54 | |
| TILE FINISHER Building MARB0003-009 | $28.85 | $12.55 | $41.40 | |
| TILE SETTER Building MARB0003-008 | $34.34 | $14.20 | $48.54 | |
| TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCTION: TRACTOR TRAILER, LOW BOY A. VACATION: EMPLOYEES WILL RECEIVE ONE Heavy TEAM0639-001 (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE | $33.75 | $7.30 | $41.05 | |
| TRUCK DRIVERS: PAVING & INCIDENTAL GRADING: ALL PAVING PROJECTS WHERE THE GRADING IS INCIDENTAL TO THE PAVING A. VACATION: EMPLOYEES WILL RECEIVE ONE Heavy TEAM0639-005 (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE | $31.75 | $7.30 | $39.05 | |
| TRUCK DRIVERS:, HEAVY & HIGHWAY CONSTRUCTION: TRUCK DRIVERS A. VACATION: EMPLOYEES WILL RECEIVE ONE Heavy TEAM0639-001 (1) WEEK'S PAID VACATION AFTER ONE (1) YEAR OF SERVICE | $31.75 | $7.30 | $39.05 |
No trade rates match your search and filter selection.
Heavy, Highway
Applies to
Washington, D.C
Building
Applies to
Washington, D.C
Residential
Applies to
Washington, D.C