GA20260105
BuildingDavis-Bacon Act general wage determination for building construction in Georgia.
Track GA20260105
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BOIL0026-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $34.21 | $23.92 | $58.13 |
ELEC0508-005 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (BULLOCH, CANDLER, EMANUEL, EVANS, SCREVEN, TATTNALL, & TOOMBS) | $33.35 | $13.40 | $46.75 |
ELEC1316-022 Effective 09/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (HANCOCK, JOHNSON, MONTGOMERY, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $32.00 | $14.71 | $46.71 |
ELEC1579-013 Effective 10/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (GLASCOCK, JENKINS, TALIAFERRO, WARREN, & WILKES COUNTIES) | $32.25 | $16.95 | $49.20 |
ENGI0474-032 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $34.00 | $17.70 | $51.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $33.00 | $17.70 | $50.70 |
| POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) (BULLOCH, CANDLER, EMANUEL, EVANS, JENKINS, JOHNSON, MONTGOMERY, SCREVEN, TATTNALL, TOOMBS, TREUTLEN, WASHINGTON, & WHEELER COUNTIES) | $32.00 | $17.70 | $49.70 |
ENGI0926-035 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: CRANE (GLASCOCK, HANCOCK, TALIAFERRO, WARREN, & WILKES COUNTIES) | $38.53 | $16.08 | $54.61 |
PLUM0072-027 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $41.18 | $17.01 | $58.19 |
PLUM0188-007 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PIPEFITTER | $35.45 | $17.55 | $53.00 |
SUGA2012-024 Effective 08/11/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $15.77 | $0.00 | $15.77 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.33 | $5.47 | $24.80 |
| ROOFER | $13.62 | $0.00 | $13.62 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $14.77 | $0.27 | $15.04 |
| OPERATOR: OILER | $12.00 | $0.00 | $12.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $14.00 | $0.00 | $14.00 |
| LABORER: PIPELAYER | $15.50 | $0.00 | $15.50 |
| LABORER: COMMON OR GENERAL | $11.69 | $0.46 | $12.15 |
| IRONWORKER, STRUCTURAL | $16.75 | $0.00 | $16.75 |
| IRONWORKER, REINFORCING | $17.72 | $0.00 | $17.72 |
| ELEVATOR MECHANIC | $19.38 | $7.53 | $26.91 |
| CEMENT MASON/CONCRETE FINISHER | $12.89 | $0.00 | $12.89 |
| CARPENTER | $18.91 | $3.37 | $22.28 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 18 counties in Georgia.
Get notified when GA20260105 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.