ID20260060
HeavyDavis-Bacon Act general wage determination for heavy construction in Idaho.
Track ID20260060
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP0001-045 Effective 06/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | $38.87 | $17.84 | $56.71 |
ELEC0073-011 Effective 08/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $49.55 | $19.09 | $68.64 |
ENGI0370-035 Effective 06/01/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 |
| POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 |
| POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 |
IRON0014-006 Effective 07/03/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: REINFORCING AND STRUCTURAL | $43.40 | $30.27 | $73.67 |
LABO0238-028 Effective 06/01/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (PIPELINE ONLY): COMMON | $26.28 | $12.15 | $38.43 |
LABO0238-031 Effective 07/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER:GROUP 1A FLAGGER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $25.84 | $13.00 | $38.84 |
| LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 |
PLAS0072-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 |
PLUM0044-015 Effective 06/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (ZONE 1) | $37.71 | $23.44 | $61.15 |
SUID2010-053 Effective 08/08/2012 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | $24.48 | $11.67 | $36.15 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 | $33.10 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 | $36.90 |
| OPERATOR: FORKLIFT | $21.20 | $0.00 | $21.20 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 | $20.97 |
| LABORER: PIPELAYER | $17.67 | $7.26 | $24.93 |
| LABORER: LANDSCAPE | $22.13 | $11.13 | $33.26 |
| LABORER: COMMON OR GENERAL | $24.66 | $8.36 | $33.02 |
| CARPENTER, EXCLUDES FORM WORK | $29.92 | $5.20 | $35.12 |
TEAM0690-002 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP (OVER 6 YDS) | $37.02 | $20.93 | $57.95 |
| TRUCK DRIVER: DUMP (6 YDS AND UNDER) | $36.58 | $20.93 | $57.51 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Idaho.
Get notified when ID20260060 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.