ID20260003
rev 1Residential
12 trades
Applies to
Benewah, Bonner, Boundary, Clearwater, Kootenai, Latah, Lewis, Shoshone
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Shoshone County, Idaho are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| BRICKLAYER Residential SUID1981-003 | $11.86 | 0.00 | $11.86 | |
| BRICKLAYER Building BRID0003-001 | $32.05 | $18.27 | $50.32 | |
| CARPENTER Residential SUID1981-003 | $8.30 | 0.00 | $8.30 | |
| CARPENTER Building CARP0001-046 (INCLUDES FORM WORK AND SCAFFOLD BUILDING) | $33.41 | $17.84 | $51.25 | |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) Building SUID2010-011 | $18.13 | $4.39 | $22.52 | |
| CARPENTER (DRYWALL HANGING ONLY) Building SUID2010-011 | $20.77 | $4.19 | $24.96 | |
| CARPENTER (FORM WORK ONLY) Heavy CARP0001-045 | $38.87 | $17.84 | $56.71 | |
| CARPENTER (FORM WORK ONLY) Highway SUID2013-012 | $26.57 | $8.10 | $34.67 | |
| CARPENTER, EXCLUDES FORM WORK Heavy SUID2010-053 | $29.92 | $5.20 | $35.12 | |
| CEMENT MASON/CONCRETE FINISHER Building SUID2010-011 | $26.08 | $9.93 | $36.01 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0072-003 (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0072-001 (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | |
| DRYWALL FINISHER/TAPER Building SUID2010-011 | $22.78 | $8.88 | $31.66 | |
| ELECTRICIAN Residential SUID1981-003 | $9.18 | 0.00 | $9.18 | |
| ELECTRICIAN Building SUID2010-011 | $23.65 | 0.00 | $23.65 | |
| ELECTRICIAN Heavy ELEC0073-011 | $49.55 | $19.09 | $68.64 | |
| ELECTRICIAN Highway SUID2013-012 | $26.83 | $11.94 | $38.77 | |
| HIGHWAY/PARKING LOT STRIPING: PAINTER Highway SUID2013-012 | $23.80 | $6.67 | $30.47 | |
| INSULATOR - MECHANICAL Building SUID2010-011 (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $20.13 | $1.80 | $21.93 | |
| IRONWORKER: REINFORCING AND STRUCTURAL Building IRON0014-003 | $43.40 | $30.27 | $73.67 | |
| IRONWORKER: REINFORCING AND STRUCTURAL Heavy IRON0014-006 | $43.40 | $30.27 | $73.67 | |
| LABORER Residential SUID1981-003 | $7.25 | 0.00 | $7.25 | |
| LABORER Building LABO0238-012 (MASON TENDER (CEMENT/CONCRETE, BRICK (HOD)) | $26.84 | $12.35 | $39.19 | |
| LABORER (PIPELINE ONLY): COMMON Heavy LABO0238-028 | $26.28 | $12.15 | $38.43 | |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR Highway SUID2013-012 | $22.86 | $9.40 | $32.26 | |
| LABORER: CARPENTER TENDER Building SUID2010-011 | $17.71 | $1.82 | $19.53 | |
| LABORER: COMMON OR GENERAL Building SUID2010-011 | $17.17 | 0.00 | $17.17 | |
| LABORER: COMMON OR GENERAL Heavy SUID2010-053 | $24.66 | $8.36 | $33.02 | |
| LABORER: COMMON OR GENERAL Highway SUID2013-012 | $23.18 | $9.40 | $32.58 | |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) Highway SUID2013-012 | $23.98 | $11.05 | $35.03 | |
| LABORER: GRADE CHECKER Highway SUID2013-012 | $23.41 | $10.78 | $34.19 | |
| LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL Heavy LABO0238-031 (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 | $41.48 | |
| LABORER: LANDSCAPE Heavy SUID2010-053 | $22.13 | $11.13 | $33.26 | |
| LABORER: MASON TENDER (CEMENT/CONCRETE) Highway LABO0238-013 | $28.21 | $13.00 | $41.21 | |
| LABORER: PIPELAYER Heavy SUID2010-053 | $17.67 | $7.26 | $24.93 | |
| LABORER:GROUP 1A FLAGGER ZONE DIFFERENTIAL Heavy LABO0238-031 (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $25.84 | $13.00 | $38.84 | |
| OPERATOR: BACKHOE/EXCAVATOR Building SUID2010-011 | $20.75 | $4.42 | $25.17 | |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUID2013-012 | $25.97 | $10.95 | $36.92 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Heavy SUID2010-053 | $20.97 | 0.00 | $20.97 | |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER Highway SUID2013-012 | $25.35 | $11.55 | $36.90 | |
| OPERATOR: BROOM/SWEEPER Highway SUID2013-012 | $26.82 | $11.55 | $38.37 | |
| OPERATOR: BULLDOZER Highway SUID2013-012 | $25.73 | $11.51 | $37.24 | |
| OPERATOR: CONCRETE BATCH PLANT Heavy SUID2010-053 | $24.94 | $11.96 | $36.90 | |
| OPERATOR: CRANE Building SUID2010-011 | $27.29 | $10.53 | $37.82 | |
| OPERATOR: CRANE Highway SUID2013-012 | $27.18 | $10.97 | $38.15 | |
| OPERATOR: CRUSHER Highway SUID2013-012 | $25.06 | $9.23 | $34.29 | |
| OPERATOR: FORKLIFT Heavy SUID2010-053 | $21.20 | 0.00 | $21.20 | |
| OPERATOR: GRADER/BLADE Highway SUID2013-012 | $26.00 | $10.30 | $36.30 | |
| OPERATOR: HYDROSEEDER Highway SUID2013-012 | $24.76 | $11.51 | $36.27 | |
| OPERATOR: LOADER Highway SUID2013-012 | $25.76 | $10.31 | $36.07 | |
| OPERATOR: MECHANIC Highway SUID2013-012 | $26.00 | $9.93 | $35.93 | |
| OPERATOR: OILER Highway SUID2013-012 | $25.66 | $9.23 | $34.89 | |
| OPERATOR: PAVER Highway SUID2013-012 (ASPHALT, AGGREGATE, AND CONCRETE) | $25.66 | $11.03 | $36.69 | |
| OPERATOR: ROLLER Highway SUID2013-012 | $25.49 | $11.55 | $37.04 | |
| OPERATOR: ROLLER (SUBGRADE) Highway SUID2013-012 | $22.24 | $8.57 | $30.81 | |
| OPERATOR: ROTOMILL Highway SUID2013-012 | $29.78 | $4.52 | $34.30 | |
| OPERATOR: SCREED Highway SUID2013-012 | $25.71 | $11.55 | $37.26 | |
| PAINTER Residential SUID1981-003 | $8.00 | 0.00 | $8.00 | |
| PAINTER: BRUSH, ROLLER AND SPRAY Building SUID2010-011 | $19.31 | $4.41 | $23.72 | |
| PLUMBER Residential SUID1981-003 | $8.50 | 0.00 | $8.50 | |
| PLUMBER (ZONE 1) Building PLUM0044-005 | $44.57 | $26.58 | $71.15 | |
| PLUMBER (ZONE 1) Heavy PLUM0044-015 | $37.71 | $23.44 | $61.15 | |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS Heavy ENGI0370-035 (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $27.51 | $15.95 | $43.46 | |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER Heavy ENGI0370-035 (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | $28.44 | $15.95 | $44.39 | |
| POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER Heavy ENGI0370-035 (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.60 | $15.95 | $44.55 | |
| POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE Heavy ENGI0370-035 (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $28.76 | $15.95 | $44.71 | |
| POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE Heavy ENGI0370-035 (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.04 | $15.95 | $44.99 | |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE Heavy ENGI0370-035 (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $29.31 | $15.95 | $45.26 | |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES Heavy ENGI0370-035 (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | $30.41 | $15.95 | $46.36 | |
| POWER EQUIPMENT OPERATORS: (BACKHOE) Residential SUID1981-003 | $8.34 | 0.00 | $8.34 | |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER Residential SUID1981-003 | $8.75 | 0.00 | $8.75 | |
| POWER EQUIPMENT OPERATORS: PAVER; BLADE, SCREED AND ROLLER (ASPHALT) Residential SUID1981-003 | $8.00 | 0.00 | $8.00 | |
| ROOFER Residential SUID1981-003 | $10.00 | 0.00 | $10.00 | |
| ROOFER Building ROOF0189-002 | $35.75 | $15.21 | $50.96 | |
| SHEET METAL WORKER Residential SUID1981-003 | $10.00 | $1.10 | $11.10 | |
| SHEET METAL WORKER Building SHEE0055-002 (INCLUDES HVAC DUCT INSTALLATION) | $39.00 | $22.42 | $61.42 | |
| TRAFFIC CONTROL: FLAGGER Highway SUID2013-012 | $21.46 | $10.12 | $31.58 | |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER Highway SUID2013-012 | $22.66 | $10.90 | $33.56 | |
| TRUCK DRIVER Residential SUID1981-003 | $10.33 | 0.00 | $10.33 | |
| TRUCK DRIVER: DUMP (6 YDS AND UNDER) Heavy TEAM0690-002 | $36.58 | $20.93 | $57.51 | |
| TRUCK DRIVER: DUMP (OVER 6 YDS) Heavy TEAM0690-002 | $37.02 | $20.93 | $57.95 | |
| TRUCK DRIVER: DUMP TRUCK Building SUID2010-011 | $17.82 | $2.18 | $20.00 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUID2013-012 | $23.40 | $10.75 | $34.15 | |
| TRUCK DRIVER: LOWBOY TRUCK Heavy SUID2010-053 | $21.00 | $12.10 | $33.10 | |
| TRUCK DRIVER: LOWBOY TRUCK Highway SUID2013-012 | $22.12 | $13.20 | $35.32 | |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK Highway SUID2013-012 | $22.54 | $12.35 | $34.89 | |
| TRUCK DRIVER: WATER TRUCK Heavy SUID2010-053 | $24.48 | $11.67 | $36.15 | |
| TRUCK DRIVER: WATER TRUCK Highway SUID2013-012 | $23.12 | $10.75 | $33.87 |
No trade rates match your search and filter selection.
Residential
Applies to
Benewah, Bonner, Boundary, Clearwater, Kootenai, Latah, Lewis, Shoshone
Building
Heavy
Highway