IL20260014
HeavyHighwayDavis-Bacon Act general wage determination for heavy, highway construction in Illinois.
Track IL20260014
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP0004-009 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (HENDERSON AND MERCER COUNTIES) | $38.00 | $35.16 | $73.16 |
CARP0174-003 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (STARK COUNTY) | $40.28 | $38.95 | $79.23 |
CARP0237-003 Effective 05/15/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FULTON AND TAZEWELL (SOUTHERN 2/3) COUNTIES) | $36.16 | $30.07 | $66.23 |
CARP0237-013 Effective 05/15/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PILEDRIVERMAN (FULTON, KNOX, PEORIA, AND TAZEWELL (NORTHERN 1/3) COUNTIES) | $36.16 | $30.07 | $66.23 |
| CARPENTER (FULTON, KNOX, PEORIA, AND TAZEWELL (NORTHERN 1/3) COUNTIES) | $36.16 | $30.07 | $66.23 |
CARP0270-010 Effective 05/15/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PILEDRIVERMAN (MCDONOUGH AND WARREN COUNTIES) | $37.66 | $28.57 | $66.23 |
| CARPENTER (MCDONOUGH AND WARREN COUNTIES) | $37.66 | $28.57 | $66.23 |
CARP0270-011 Effective 05/15/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PILEDRIVERMAN (HANCOCK COUNTY) | $35.05 | $28.57 | $63.62 |
| CARPENTER (HANCOCK COUNTY) | $35.05 | $28.57 | $63.62 |
ELEC0034-006 Effective 03/01/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (FULTON (FAIRVIEW, FARMINGTON, JOSHUA, CANTON, ORION, PUTNAM, BUCKHEART, BANNER, FARMERS, BERNADOTTE, LEWISTOWN, LIVERPOOL, VERMONT, PLEASANT, ISABEL, WATERFORD, ASTORIA, WOODLAND, AND KERTON TWPS), PEORIA, STARK (WEST JERSEY, ESSEX, AND VALLEY TWPS), & TAZEWELL COUNTIES) | $36.51 | $21.19 | $57.70 |
ELEC0034-007 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (FULTON (CASS, DEERFIELD, ELLISVILLE, HARRIS, LEE, UNION, YOUNG, & HICKORY TWPS), HENDERSON, KNOX, MCDONOUGH (BLANDINSVILLE, PRAIRIE CITY, EMMET, TENNESEE, SCOTLAND, SCIOTA, BUSHNELL, CHALMERS TWPS), MERCER (OHIO GROVE, NORTH HENDERSON, AND SUEZ TWPS), AND WARREN COUNTIES) | $38.32 | $24.24 | $62.56 |
ELEC0051-002 Effective 01/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: LINEMAN AND SUBSTATION TECHNICIAN (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $58.58 | $26.29 | $84.87 |
| LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $39.92 | $20.22 | $60.14 |
| LINE CONSTRUCTION: GROUNDMAN/EQUIPMENT OPERATOR (ALL CRAWLER TYPE EQUIPMENT LARGER THAN D-4, 15 TON CRANE OR LARGER) (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N. HENDERSON & SUEZ TWPS), PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $52.63 | $24.35 | $76.98 |
ELEC0145-006 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (MERCER COUNTY (EXCEPT OHIO GROVE, NORTH HENDERSON, AND SUEZ TWPS)) | $46.00 | $28.56 | $74.56 |
| CABLE SPLICER (MERCER COUNTY (EXCEPT OHIO GROVE, NORTH HENDERSON, AND SUEZ TWPS)) | $47.00 | $28.64 | $75.64 |
ELEC0145-007 Effective 12/04/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LINE CONSTRUCTION: LINEMAN, TECHNICIAN, HEAVY EQUIPMENT OPERATOR (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $52.67 | $24.38 | $77.05 |
| LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $36.15 | $18.93 | $55.08 |
| LINE CONSTRUCTION: GROUNDMAN (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $34.64 | $18.43 | $53.07 |
| LINE CONSTRUCTION: DYNAMITER (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $43.92 | $21.49 | $65.41 |
| LINE CONSTRUCTION: CABLE SPLICER (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) INDEPENDENCE DAY, LABOR DAY, AND THANKSGIVING DAY | $53.12 | $24.53 | $77.65 |
| LINE CONSTRUCTION, GROUNDMAN EQUIPMENT OPERATOR (MERCER COUNTY (EXCEPT NORTH HENDERSON AND SUEZ TWPS)) | $41.61 | $20.73 | $62.34 |
ENGI0150-021 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, GROUP 4 AIR COMPRESSOR (400 C.F.M. OR OVER); COMPACT LOADER (RUBBER TIRE, TRACK & UTILITY); ENGINE DRIVEN WELDING MACHINE; MECHANICAL HEATER (OTHER THAN STEAM BOILER); SMALL OUTBOARD MOTOR BOAT (SAFETY BOAT & LIFE BOAT); WATER PUMP (MORE THAN ONE WELL POINT PUMP). (MERCER COUNTY) | $37.80 | $41.25 | $79.05 |
| OPERATOR: POWER EQUIPMENT, GROUP 3 ARTICULATED OFF-ROAD HAUL UNIT; ASPHALT BOOSTER; BOILER (ENGINEER OR FIREMAN); CONVEYOR OVER 20 H.P.; DISTRIBUTOR; DRIVER ON TRUCK CRANE OR SIMILAR MACHINES; ELEVATOR; FARM-TYPE TRACTOR (WITHOUT POWER ATTACHMENT); FIREMAN & PUMP OPERATOR AT ASPHALT PLANT; FORKLIFT (LESS THAN 6000 LB. CAPACITY); GROUT PUMP; LIGHT PLANT; MECHANICAL BROOM; MUD JACK; SELF-PROPELLED ROLLER (OTHER THAN LISTED IN GROUP 2); STRADDLE CARRIER; TRENCH MACHINE (UNDER 40 H.P.). (MERCER COUNTY) | $38.85 | $41.25 | $80.10 |
| OPERATOR: POWER EQUIPMENT, GROUP 1 CRANE (FRICTION OR HYDRAULIC, REGARDLESS OF SIZE OR ATTACHMENTS); TOW OR PUSH BOAT (MERCER COUNTY) | $43.50 | $41.25 | $84.75 |
ENGI0649-002 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ON CRANE, DERRICK BOOMS, AND TOWER CRANES: OPERATOR: POWER EQUIPMENT, GROUP 3 STRAIGHT FRAMED TRUCK AND TRUCK MOUNTED VAC UNIT, STARTING ENGINEER (3 TO 5 PIECES); TRAC AIR MACHINE W/O ATTACHMENTS; ROLLERS, 5 TONS & UNDER ON EARTH & GRAVEL; FORM GRADER; BULK CEMENT PLANT; OILERS. (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) - ESCALATED RATE ADDITIONAL $1.00 PER HOUR OVER SCALE WHEN CRANE OR DERRICK IS POSITIONED 50 FT. OR MORE ABOVE ADJACENT GROUND LEVEL OR WATER LEVEL. $.05 PER HOUR, PER FOOT, OVER 90 FEET INCLUDING JIB. $0.02 PER HOUR, PER TON - OVER 50-TON CAPACITY. - OPERATING ENGINEERS WHO OPERATE LATTICE BOOM CRAWLER CRANES, LATTICE BOOM TRUCK CRANES, TELESCOPIC BOOM CRANES LESS THAN 17.5 TONS, TOWER CRANES, OVERHEAD CRANES AND HAVE BEEN CERTIFIED BY HTE NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS ON THE EQUIPMENT THEY OPERATE SHALL RECEIVE $1.60 PER HOUR OVER SCALE. A. ON DESIGNATED HAZARDOUS WASTE JOBS, OPERATORS SHALL RECEIVE: LEVEL A ADD $4.00 TO THE APPROPRIATE GROUP RATE; LEVELS B AND C ADD ADD $2.00 TO THE APPROPRIATE GROUP RATE | $38.03 | $43.42 | $81.45 |
IRON0046-005 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (FULTON COUNTY (SOUTHERN TIP INCLUDING MARBLETOWN ASTORIA, & SUMMUM TWPS)) | $37.60 | $32.94 | $70.54 |
IRON0111-004 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (KNOX (GALESBURG AND AREA NORTH THEREOF), MERCER (EXCEPT SOUTHWEST PART), AND WARREN (NORTHWEST PART) COUNTIES) | $38.25 | $32.28 | $70.53 |
IRON0112-004 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (FULTON (EASTERN 2/3), KNOX (SOUTH AND EAST OF GALESBURG), PEORIA, STARK, AND TAZEWELL COUNTIES) | $45.48 | $34.13 | $79.61 |
IRON0577-006 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (FULTON (NORTH OF SUMMUM & MARBLETOWN TWPS, WEST 1/3), HANCOCK, HENDERSON, KNOX (WEST AND SOUTHWEST OF GALESBURG), MCDONOUGH, MERCER, AND WARREN (EXCEPT NORTHWEST PART) COUNTIES) | $36.30 | $25.80 | $62.10 |
LABO0165-002 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 3 ABESTOS ABATEMENT WORKER; HAZARDOUS WASTE WORKER (INCLUDING MAINTAINING OF MANIFEST SHEET); LEAD BASE PAINT ABATEMENT WORKER (PEORIA AND TAZEWELL (NORTHWEST) COUNTIES) | $38.07 | $38.14 | $76.21 |
LABO0231-002 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (FULTON AND TAZEWELL (SOUTHEAST) COUNTIES) | $38.50 | $33.45 | $71.95 |
LABO0231-005 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (HANCOCK AND MCDONOUGH COUNTIES) | $33.50 | $30.13 | $63.63 |
LABO0309-003 Effective 01/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 3 CONCRETE SPECIALIST (MERCER COUNTY) | $34.90 | $23.60 | $58.50 |
| LABORER GROUP 2 ASPHALT RAKER OR LUTEMAN, HEAD FORM SETTER, HEAD DYNAMITE MAN (POWDERMAN) HEAD STRING OR WIRELINE MAN (ON PAVING), PIPE SETTER ON SEWER OR WATER MAIN, GUNNITE NOZZIE MAN, ASPHALT OR CONCRETE CURB MACHINE OPERATOR, HEAD GRADE MAN, HEAD TUNNEL MINER, CONCRETE BURNING MACHINE OPERATOR, CORING MACHINE OPERATOR, WELDER, ASBESTOS ABATEMENT AND HAZARDOUS WASTE WORKERS (MERCER COUNTY) | $34.27 | $23.60 | $57.87 |
| LABORER GROUP 1 FLAGMAN, DUMPMAN, SPOTTER, BROOM MAN, REMOVAL OF TREES, FENCING LABORERS, CLEANING OF FORMS OR LUMBER (IN BONE YARD), MOVING AND/OR MAINTENANCE OF FLARES AND BARRICADES, OPERATION OF ALL HAND, ELECTRIC, AIR, HYDRAULIC, OR MECHANICALLY POWERED TOOLS UNDER THE JURISDICTION OF THE LABORERS; INCLUDING JACKHAMMERS, TAMPERS; AIR SPADES, AUGERS, CONCRETE SAWS, CHAINS SAWS, UTILITY SAWS, ROCK DRILLS, VIBRATORS, MORTAR MIXER, POWER AND HAND SAW (WHEN CLEANING TIMBER), GENERAL LABORERS (NOT ELSEWHERE COVERED), CRAFT-TENDER, MATERIAL CHECKER, MATERIAL HANDLER, FORM HANDLER, CONCRETE DUMPER, PUDDLER, EXPLOSIVES HANDLER, CENTER STRIP, REINFORCING IN CONCRETE, WIRE MESH HANDLER AND INSTALLER, PRIME MOVER OR ANY MECHANICAL DEVICE TAKING THE PLACE OF CONCRETE BUGGY OR WHEEL-BARROW, SANDPOINT SETTER, ASPHALT KETTLEMAN, SHEETING HAMMER DRIVERS, LAYING AND JOINING OF TELEPHONE CONDUIT, GAS DISTRIBUTION MEN, PIPE SETTER ON LATERALS, DRAIN TILES, CULVERT PIPE, AND STORM SEWER CATCH BASIN LEADS, CATCH BASINS, MANHOLES, BATCH DUMPERS, TANK CLEANERS, COFFERDAM WORKER, BANKMAN ON FLOATING PLANT, JOINTMAN WITH PIPELAYERS. BACK-UP MAN (CORKER, JOINT MAKER) WITH PIPE SETTER ON SEWER AND WATER MAINS, BATTERBOARD MAN OR LASER OPERATOR ON SEWER AND WATER MAIN, LABORER IN DITCH, OR TUNNEL, ON SEWER OR WATER MAINS AND TELEPHONE CONDUIT, CUTTERS, BURNERS, TORCHMAN, GRAVEL BOX MAN, ASPHALT PLANT LABORER, CONCRETE PLANT LABORER, DECK HAND, UNLOADING OF STEEL AND REBAR, LASER BEAM OPERATOR, WRECKING LABORERS (MERCER COUNTY) | $33.77 | $23.60 | $57.37 |
LABO0538-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORERS: GENERAL LABORER: ALL CLASSIFICATIONS NOT LISTED BELOW (HENDERSON, KNOX, WARREN, AND STARK (WEST) COUNTIES) | $35.23 | $28.10 | $63.33 |
LABO0996-003 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER GROUP 2 DYNAMITE MAN; ASBESTOS ABATEMENT WORKER AND HAZARDOUS WASTE WORKER; AND LEAD BASE PAINT WORKER (STARK COUNTY (EAST)) | $40.17 | $28.01 | $68.18 |
| LABORER GROUP 1 ALL CLASSIFICATIONS NOT LISTED BELOW (STARK COUNTY (EAST)) | $39.17 | $28.01 | $67.18 |
PAIN0030-010 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, ROLLER, PRESSURE ROLLER, SPRAY, AIRLESS SPRAY, SANDBLASTING, TAPER, DRYWALL TAPER/FINISHER, STRUCTURAL STEEL, AND BRIDGES (BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN, PUTNAM AND STARK COUNTIES) | $40.00 | $26.90 | $66.90 |
PAIN0157-001 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, SPRAY, PRESSURE ROLLER, SANDBLASTING, BRIDGES, & NEW STRUCTURAL STEEL WORK (FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND WOODFORD COUNTIES) | $40.00 | $26.90 | $66.90 |
PAIN1178-003 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY, STRUCTURAL STEEL, & SANDBLASTING (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES) | $30.50 | $17.37 | $47.87 |
| PAINTER: BRUSH AND ROLLER (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES) | $30.00 | $17.37 | $47.37 |
| PAINTER: BRIDGES (HENDERSON, KNOX, MERCER, AND WARREN COUNTIES) | $32.00 | $17.37 | $49.37 |
PLAS0018-011 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (FULTON (NORTHWESTERN PART), KNOX, MERCER (SOUTHEASTERN CORNER), AND WARREN COUNTIES) | $35.38 | $27.31 | $62.69 |
PLAS0018-012 Effective 06/01/2015 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (STARK COUNTY) | $36.70 | $22.08 | $58.78 |
PLAS0018-013 Effective 05/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (FULTON (EXCEPT NORTHWEST PART), PEORIA, AND TAZEWELL COUNTIES) | $32.98 | $30.70 | $63.68 |
PLAS0018-028 Effective 05/01/2016 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (HANCOCK, HENDERSON (SOUTHERN HALF), AND MCDONOUGH COUNTIES) | $28.64 | $24.57 | $53.21 |
PLAS0018-037 Effective 01/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER (HENDERSON (NORTHERN HALF) AND MERCER (EXCEPT SOUTHEASTERN CORNER) COUNTIES) | $28.52 | $24.04 | $52.56 |
TEAM0371-003 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK. (MERCER COUNTY) | $47.71 | $25.72 | $73.43 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS (MERCER COUNTY) | $46.60 | $25.72 | $72.32 |
| TRUCK DRIVER, GROUP 3 (MERCER COUNTY) | $46.25 | $25.72 | $71.97 |
| TRUCK DRIVER, GROUP 2 (MERCER COUNTY) | $45.93 | $25.72 | $71.65 |
TEAM0627-002 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER, GROUP 5 DRIVERS WHO REQUIRE SPECIAL PROTECTIVE CLOTHING WHILE EMPLOYED ON HAZARDOUS WASTE WORK (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $45.59 | $24.27 | $69.86 |
| TRUCK DRIVER, GROUP 4 LOW BOY AND OIL DISTRIBUTORS (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $44.49 | $24.27 | $68.76 |
| TRUCK DRIVER, GROUP 3 (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $44.10 | $24.27 | $68.37 |
| TRUCK DRIVER, GROUP 2 (FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK, TAZEWELL, AND WARREN COUNTIES) | $43.83 | $24.27 | $68.10 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 10 counties in Illinois.
Get notified when IL20260014 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.