KS20260044

Building

Davis-Bacon Act general wage determination for building construction in Kansas.

Modification 1, revised 05/18/2026 22 trade rates 71 counties View on SAM.gov

Track KS20260044

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0027-002 Effective 10/06/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $45.60 $35.47 $81.07
BRKS0015-015 Effective 05/01/2025
Trade Rate Fringe Total
BRICKLAYER $29.07 $15.61 $44.68
IRON0010-031 Effective 04/01/2025
Trade Rate Fringe Total
IRONWORKER, REINFORCING $39.00 $34.25 $73.25
PAIN2012-007 Effective 04/01/2025
Trade Rate Fringe Total
PAINTER: BRUSH AND ROLLER $36.18 $19.97 $56.15
PLUM0441-015 Effective 06/30/2025
Trade Rate Fringe Total
PIPEFITTER (EXCLUDES HVAC PIPE AND UNIT INSTALLATION) $45.90 $19.94 $65.84
PLUM0441-016 Effective 06/30/2025
Trade Rate Fringe Total
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $45.90 $19.94 $65.84
SFKS0669-002 Effective 04/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER: FIRE SPRINKLER $41.83 $27.60 $69.43
SHEE0002-016 Effective 07/01/2024
Trade Rate Fringe Total
SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) $52.18 $27.15 $79.33
SUKS2015-013 Effective 07/08/2015
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) $28.20 $10.85 $39.05
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) $23.18 $5.83 $29.01
ROOFER $14.48 $2.96 $17.44
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $27.79 $10.85 $38.64
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.72 $1.95 $17.67
METAL BUILDING ERECTOR $11.19 $1.83 $13.02
LABORER: COMMON OR GENERAL $12.37 $2.77 $15.14
IRONWORKER, STRUCTURAL $23.02 $15.09 $38.11
GLAZIER $18.92 $6.64 $25.56
FORM WORKER $13.33 $0.00 $13.33
ELECTRICIAN, EXCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS $27.63 $10.96 $38.59
CEMENT MASON/CONCRETE FINISHER $18.01 $3.33 $21.34
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK $19.04 $3.95 $22.99
CARPENTER (DRYWALL HANGING ONLY) $17.92 $2.09 $20.01

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 71 counties in Kansas.

Get notified when KS20260044 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.