KS20260141

Highway

Davis-Bacon Act general wage determination for highway construction in Kansas.

Modification 1, revised 05/18/2026 38 trade rates 1 county View on SAM.gov

Track KS20260141

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP0315-005 Effective 05/01/2023
Trade Rate Fringe Total
CARPENTER (EXCLUDES FORM WORK) $43.28 $21.25 $64.53
ENGI0101-023 Effective 04/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: ROTO MILL $40.17 $22.29 $62.46
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER $40.17 $22.29 $62.46
IRON0010-015 Effective 04/01/2025
Trade Rate Fringe Total
IRONWORKER (REINFORCING AND STRUCTURAL) $39.00 $34.25 $73.25
LABO0663-017 Effective 04/01/2025
Trade Rate Fringe Total
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) $37.45 $15.87 $53.32
LABO1290-002 Effective 04/01/2025
Trade Rate Fringe Total
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR $37.45 $15.87 $53.32
SUKS2019-080 Effective 05/09/2019
Trade Rate Fringe Total
TRUCK DRIVER: OFF ROAD TRUCK $19.06 $0.00 $19.06
TRUCK DRIVER: FLATBED AND LOWBOY $27.96 $14.05 $42.01
TRUCK DRIVER: DUMP AND TANDEM $29.04 $12.45 $41.49
TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) $17.10 $0.00 $17.10
TRAFFIC CONTROL: SERVICE DRIVER $14.15 $2.44 $16.59
OPERATOR: STRIPING MACHINE $27.27 $12.25 $39.52
OPERATOR: ROTO MILL GROUNDMAN $18.43 $0.00 $18.43
OPERATOR: TRACTOR $24.28 $0.00 $24.28
OPERATOR: SCREED $17.38 $3.52 $20.90
OPERATOR: SCRAPER $17.67 $0.00 $17.67
OPERATOR: ROLLER $29.00 $11.40 $40.40
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) $32.88 $15.53 $48.41
OPERATOR: MECHANIC $32.25 $15.31 $47.56
OPERATOR: MATERIAL TRANSFER VEHICLE $14.65 $0.00 $14.65
OPERATOR: LOADER $33.88 $15.07 $48.95
OPERATOR: GRADER/BLADE $29.66 $12.55 $42.21
OPERATOR: CRANE $30.38 $11.08 $41.46
OPERATOR: CONCRETE SAW $33.87 $15.16 $49.03
OPERATOR: CONCRETE FINISHING MACHINE $24.26 $0.00 $24.26
OPERATOR: BULLDOZER $28.15 $11.65 $39.80
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $34.58 $15.13 $49.71
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $35.23 $15.53 $50.76
LINE CONSTRUCTION: LINEMAN $41.52 $17.56 $59.08
LINE CONSTRUCTION: GROUNDMAN $26.76 $12.71 $39.47
LINE CONSTRUCTION: EQUIPMENT OPERATOR $32.15 $15.06 $47.21
LABORER: MASON TENDER - CEMENT/CONCRETE $29.75 $12.83 $42.58
LABORER: FLAGGER $13.20 $0.00 $13.20
LABORER: COMMON OR GENERAL $27.97 $13.76 $41.73
ELECTRICIAN $29.93 $14.14 $44.07
CEMENT MASON/CONCRETE FINISHER $30.06 $14.85 $44.91
CARPENTER (FORM WORK ONLY) $30.23 $12.71 $42.94
TEAM0541-013 Effective 04/01/2025
Trade Rate Fringe Total
TRUCK DRIVER: WATER TRUCK $38.04 $15.85 $53.89

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Kansas.

Get notified when KS20260141 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.