KS20260149
HighwayDavis-Bacon Act general wage determination for highway construction in Kansas.
Track KS20260149
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC0271-005 Effective 05/31/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $40.64 | $18.29 | $58.93 |
IRON0010-009 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, STRUCTURAL | $39.00 | $34.25 | $73.25 |
SUKS2019-088 Effective 05/09/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: FLATBED AND LOWBOY | $23.23 | $9.89 | $33.12 |
| TRUCK DRIVER: DUMP AND TANDEM | $16.34 | $0.00 | $16.34 |
| TRUCK DRIVER: WATER TRUCK | $21.94 | $11.51 | $33.45 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $19.06 | $0.00 | $19.06 |
| TRAFFIC SIGNALIZATION: TRAFFIC SIGNAL INSTALLATION (GROUNDMAN) | $16.40 | $0.00 | $16.40 |
| TRAFFIC CONTROL: SERVICE DRIVER | $14.13 | $0.00 | $14.13 |
| OPERATOR: STRIPING MACHINE | $27.02 | $12.14 | $39.16 |
| OPERATOR: ROTO MILL GROUNDMAN | $16.36 | $0.00 | $16.36 |
| OPERATOR: ROTO MILL | $18.53 | $0.00 | $18.53 |
| OPERATOR: TRACTOR | $15.97 | $0.00 | $15.97 |
| OPERATOR: SCREED | $16.77 | $0.00 | $16.77 |
| OPERATOR: SCRAPER | $17.88 | $0.00 | $17.88 |
| OPERATOR: ROLLER | $14.74 | $0.00 | $14.74 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.66 | $0.00 | $16.66 |
| OPERATOR: MECHANIC | $21.18 | $0.00 | $21.18 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | $17.24 | $0.00 | $17.24 |
| OPERATOR: LOADER | $17.13 | $0.00 | $17.13 |
| OPERATOR: GRADER/BLADE | $18.40 | $0.00 | $18.40 |
| OPERATOR: DISTRIBUTOR | $15.55 | $0.00 | $15.55 |
| OPERATOR: CRANE | $22.40 | $4.39 | $26.79 |
| OPERATOR: CONCRETE SAW | $17.80 | $0.00 | $17.80 |
| OPERATOR: CONCRETE FINISHING MACHINE | $24.26 | $0.00 | $24.26 |
| OPERATOR: BULLDOZER | $19.27 | $0.00 | $19.27 |
| OPERATOR: BROOM/SWEEPER | $15.49 | $0.00 | $15.49 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.45 | $0.00 | $16.45 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.06 | $0.00 | $20.06 |
| LABORER: PIPELAYER | $26.56 | $13.05 | $39.61 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.75 | $12.83 | $42.58 |
| LABORER: FLAGGER | $12.83 | $0.00 | $12.83 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $29.21 | $14.63 | $43.84 |
| LABORER: COMMON OR GENERAL | $15.29 | $0.00 | $15.29 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $13.03 | $0.00 | $13.03 |
| IRONWORKER, REINFORCING | $16.32 | $0.00 | $16.32 |
| CEMENT MASON/CONCRETE FINISHER | $16.59 | $0.00 | $16.59 |
| CARPENTER, INCLUDES FORM WORK | $16.74 | $0.00 | $16.74 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Kansas.
Get notified when KS20260149 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.