MA20260018
HighwayDavis-Bacon Act general wage determination for highway construction in Massachusetts.
Track MA20260018
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP0339-004 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDES FORM WORK) | $50.10 | $31.45 | $81.55 |
ELEC0103-007 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $66.17 | $37.08 | $103.25 |
ENGI0004-025 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; GRADALL; LOADER; PAVER (ASPHALT, AGGREGATE, AND CONCRETE); POST DRIVER (GUARDRAIL/FENCES) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.83 | $33.70 | $91.53 |
IRON0007-026 Effective 09/16/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $57.87 | $37.67 | $95.54 |
LABO0022-016 Effective 12/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL | $38.95 | $29.70 | $68.65 |
| LABORER (LANDSCAPE) | $38.95 | $29.70 | $68.65 |
| LABORER (ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR) | $38.95 | $29.70 | $68.65 |
LABO0039-001 Effective 06/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: GUARDRAIL INSTALLATION | $35.00 | $25.94 | $60.94 |
PAIN0035-023 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: STEEL | $56.76 | $36.00 | $92.76 |
SUMA2014-008 Effective 01/11/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: FLATBED TRUCK | $48.53 | $0.00 | $48.53 |
| TRUCK DRIVER: DUMP TRUCK | $38.92 | $9.73 | $48.65 |
| TRUCK DRIVER: CONCRETE TRUCK | $33.69 | $15.79 | $49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $44.49 | $12.41 | $56.90 |
| TRAFFIC CONTROL: FLAGGER | $23.00 | $20.44 | $43.44 |
| PILEDRIVERMAN | $45.65 | $23.33 | $68.98 |
| PAINTER: SPRAY (LINESTRIPING) | $41.14 | $15.50 | $56.64 |
| OPERATOR: PILEDRIVER | $44.46 | $16.94 | $61.40 |
| OPERATOR: MECHANIC | $48.14 | $17.02 | $65.16 |
| OPERATOR: FORKLIFT | $64.67 | $0.00 | $64.67 |
| OPERATOR: CRANE | $52.14 | $21.08 | $73.22 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $41.78 | $18.37 | $60.15 |
| IRONWORKER, REINFORCING | $49.94 | $22.45 | $72.39 |
| CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 | $77.78 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Massachusetts.
Get notified when MA20260018 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.