MA20260021
HighwayDavis-Bacon Act general wage determination for highway construction in Massachusetts.
Track MA20260021
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ELEC0103-007 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $66.17 | $37.08 | $103.25 |
ENGI0004-026 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; GRADALL; LOADER; PAVER (ASPHALT, AGGREGATE, AND CONCRETE) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.83 | $33.70 | $91.53 |
IRON0007-031 Effective 09/16/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER (ORNAMENTAL, REINFORCING, AND STRUCTURAL) | $57.87 | $37.67 | $95.54 |
LABO0039-002 Effective 06/01/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $33.50 | $22.92 | $56.42 |
| LABORER (LANDSCAPE) | $33.25 | $22.92 | $56.17 |
PAIN0035-023 Effective 07/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: STEEL | $56.76 | $36.00 | $92.76 |
SUMA2014-011 Effective 01/11/2017 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: FLATBED TRUCK | $48.53 | $0.00 | $48.53 |
| TRUCK DRIVER: DUMP TRUCK | $38.92 | $9.73 | $48.65 |
| TRUCK DRIVER: CONCRETE TRUCK | $33.69 | $15.79 | $49.48 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $44.49 | $12.41 | $56.90 |
| TRAFFIC CONTROL: FLAGGER | $23.00 | $20.44 | $43.44 |
| PILEDRIVERMAN | $45.65 | $23.33 | $68.98 |
| PAINTER: SPRAY (LINESTRIPING) | $40.87 | $13.86 | $54.73 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | $41.49 | $23.07 | $64.56 |
| OPERATOR: PILEDRIVER | $44.46 | $16.94 | $61.40 |
| OPERATOR: MECHANIC | $48.14 | $17.02 | $65.16 |
| OPERATOR: FORKLIFT | $64.67 | $0.00 | $64.67 |
| OPERATOR: CRANE | $57.61 | $0.00 | $57.61 |
| LABORER: GUARDRAIL INSTALLATION | $37.70 | $15.37 | $53.07 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $41.78 | $18.37 | $60.15 |
| LABORER: COMMON OR GENERAL | $36.58 | $19.40 | $55.98 |
| CEMENT MASON/CONCRETE FINISHER | $56.70 | $21.08 | $77.78 |
| CARPENTER, INCLUDES FORM WORK | $47.93 | $19.46 | $67.39 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Massachusetts.
Get notified when MA20260021 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.