MA20260022

Highway

Davis-Bacon Act general wage determination for highway construction in Massachusetts.

Modification 1, revised 05/18/2026 25 trade rates 1 county View on SAM.gov

Track MA20260022

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ELEC0103-003 Effective 09/01/2025
Trade Rate Fringe Total
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION) $66.17 $37.08 $103.25
ENGI0004-028 Effective 06/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZER; GRADER/BLADE; MILLING MACHINE; ROLLER $57.18 $33.70 $90.88
POWER EQUIPMENT OPERATOR GROUP 1 BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BROOM/SWEEPER; CRANE; GRADALL; PAVER (ASPHALT, AGGREGATE, AND CONCRETE); POST DRIVER (GUARDRAIL/FENCES) FOOTNOTE FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY $57.83 $33.70 $91.53
IRON0007-026 Effective 09/16/2025
Trade Rate Fringe Total
IRONWORKER: ORNAMENTAL AND STRUCTURAL $57.87 $37.67 $95.54
LABO0022-015 Effective 12/01/2024
Trade Rate Fringe Total
LABORER: FENCE ERECTION $38.95 $29.70 $68.65
LABORER: COMMON OR GENERAL $38.95 $29.70 $68.65
LABORER (LANDSCAPE) $38.95 $29.70 $68.65
LABORER (GUARDRAIL INSTALLATION) $38.95 $29.70 $68.65
LABO0133-001 Effective 12/01/2024
Trade Rate Fringe Total
LABORER: CONCRETE SURFACER $46.20 $29.85 $76.05
PAIN0035-023 Effective 07/01/2024
Trade Rate Fringe Total
PAINTER: STEEL $56.76 $36.00 $92.76
SUMA2014-012 Effective 01/11/2017
Trade Rate Fringe Total
TRUCK DRIVER: FLATBED TRUCK $48.53 $0.00 $48.53
TRUCK DRIVER: DUMP TRUCK $37.74 $11.86 $49.60
TRUCK DRIVER: CONCRETE TRUCK $33.69 $15.79 $49.48
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $53.35 $12.78 $66.13
TRAFFIC CONTROL: FLAGGER $23.00 $20.44 $43.44
PAINTER: SPRAY (LINESTRIPING) $47.30 $6.42 $53.72
OPERATOR: PILEDRIVER $42.56 $17.34 $59.90
OPERATOR: MECHANIC $48.74 $11.79 $60.53
OPERATOR: FORKLIFT $64.67 $0.00 $64.67
LABORER: JACK HAMMER $38.69 $17.33 $56.02
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) $44.43 $14.18 $58.61
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $33.65 $17.32 $50.97
IRONWORKER, REINFORCING $44.52 $19.36 $63.88
CEMENT MASON/CONCRETE FINISHER $56.70 $21.08 $77.78
CARPENTER, INCLUDES FORM WORK $43.64 $22.09 $65.73

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Massachusetts.

Get notified when MA20260022 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.