MI20260022

Residential

Davis-Bacon Act general wage determination for residential construction in Michigan.

Modification 1, revised 05/18/2026 19 trade rates 1 county View on SAM.gov

Track MI20260022

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0025-001 Effective 06/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.74 $32.59 $73.33
BRMI0001-004 Effective 06/01/2024
Trade Rate Fringe Total
TILE SETTER $40.53 $23.62 $64.15
CARP1234-004 Effective 08/01/2024
Trade Rate Fringe Total
CARPENTER, INCLUDES FLOOR LAYING-CARPET (EXCLUDES FORMWORK) (SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS) $29.19 $15.76 $44.95
CARPENTER, INCLUDES FLOOR LAYING-CARPET (EXCLUDES FORMWORK) (MULTI-FAMILY CONDOMINIUMS) $31.58 $16.27 $47.85
ELEC0058-004 Effective 09/29/2021
Trade Rate Fringe Total
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $30.12 $14.57 $44.69
IRON0025-004 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL $36.55 $35.93 $72.48
LABO0334-020 Effective 06/01/2025
Trade Rate Fringe Total
LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER $27.71 $9.10 $36.81
LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) $29.93 $9.10 $39.03
LABO1075-004 Effective 06/01/2025
Trade Rate Fringe Total
LABORER (COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE) $31.30 $18.40 $49.70
PAIN1474-005 Effective 06/01/2010
Trade Rate Fringe Total
PAINTER: BRUSH AND ROLLER $23.79 $12.02 $35.81
PLUM0098-002 Effective 06/01/2022
Trade Rate Fringe Total
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) $27.06 $23.52 $50.58
PLUM0636-001 Effective 06/05/2022
Trade Rate Fringe Total
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $41.61 $29.35 $70.96
ROOF0149-013 Effective 06/01/2024
Trade Rate Fringe Total
ROOFER $30.38 $19.87 $50.25
SHEE0080-002 Effective 07/01/2022
Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $28.67 $9.50 $38.17
SUMI2010-020 Effective 09/16/2010
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $17.00 $5.71 $22.71
SPRINKLER FITTER (FIRE SPRINKLERS) $22.32 $4.51 $26.83
LABORER: PIPELAYER $17.99 $5.46 $23.45
GLAZIER $23.00 $8.17 $31.17
CEMENT MASON/CONCRETE FINISHER $19.27 $5.85 $25.12

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260022 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.