MI20260035
HeavyDavis-Bacon Act general wage determination for heavy construction in Michigan.
Track MI20260035
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP0202-003 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $30.83 | $21.09 | $51.92 |
ELEC0498-011 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDING THE TOWNSHIP OF WAWATAN) | $36.62 | $23.05 | $59.67 |
ELEC0692-022 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (TOWNSHIP OF WAWATAN) | $37.75 | $25.60 | $63.35 |
ENGI0325-026 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
ENGI0326-017 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 |
IRON0025-011 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $34.04 | $70.59 |
| IRONWORKER: REINFORCING | $36.55 | $34.04 | $70.59 |
LABO0334-003 Effective 09/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 |
PLAS0016-033 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $23.10 | $12.38 | $35.48 |
SUMI2010-033 Effective 11/09/2010 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $12.63 | $1.25 | $13.88 |
| PLUMBER | $17.53 | $4.17 | $21.70 |
| OPERATOR: LOADER | $13.26 | $8.36 | $21.62 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 |
| OPERATOR: GRADER/BLADE | $15.50 | $3.62 | $19.12 |
| OPERATOR: BULLDOZER | $16.17 | $9.51 | $25.68 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 |
| OPERATOR: BACKHOE/EXCAVATOR | $14.24 | $8.11 | $22.35 |
| LABORER: PIPELAYER | $15.28 | $3.99 | $19.27 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $3.51 | $19.48 |
| LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 |
| LABORER: COMMON OR GENERAL | $13.13 | $6.75 | $19.88 |
TEAM0007-010 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY | $33.55 | $0.75 | $34.30 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260035 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.