MI20260036
HeavyDavis-Bacon Act general wage determination for heavy construction in Michigan.
Track MI20260036
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BRMI0006-002 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | $34.19 | $24.65 | $58.84 |
CARP1510-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $34.01 | $23.14 | $57.15 |
ELEC0219-011 Effective 06/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (ELECTRICAL CONTRACTS OVER $180,000) | $33.94 | $21.80 | $55.74 |
| ELECTRICIAN (ELECTRICAL CONTRACTS OF $180,000 OR LESS) | $31.75 | $21.73 | $53.48 |
ENGI0325-032 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BORING MACHINE, BULLDOZER, CRANE, LOADER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
ENGI0326-007 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 |
| OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION) OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 |
| OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 |
IRON0008-009 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 | $74.72 |
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $41.05 | $33.67 | $74.72 |
LABO0334-004 Effective 09/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER ((4) GRADE CHECKER) | $22.96 | $12.95 | $35.91 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.78 | $12.95 | $35.73 |
LABO1329-004 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - CEMENT/CONCRETE (EXCLUDES OPEN CUT CONSTRUCTION) | $32.74 | $13.45 | $46.19 |
PLAS0016-035 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $20.17 | $10.13 | $30.30 |
PLUM0111-009 Effective 05/27/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER/PIPEFITTER | $34.48 | $25.18 | $59.66 |
SUMI2010-034 Effective 11/09/2010 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK | $12.63 | $1.25 | $13.88 |
| OPERATOR: ROLLER | $13.74 | $7.93 | $21.67 |
| OPERATOR: GRADER/BLADE | $16.63 | $5.85 | $22.48 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $12.98 | $6.12 | $19.10 |
| OPERATOR: BACKHOE/EXCAVATOR | $15.61 | $3.58 | $19.19 |
| LABORER: PIPELAYER | $12.50 | $1.06 | $13.56 |
| LABORER: LANDSCAPE | $10.89 | $1.74 | $12.63 |
| LABORER: COMMON OR GENERAL | $14.71 | $3.35 | $18.06 |
TEAM0007-010 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY | $33.55 | $0.75 | $34.30 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260036 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.