MI20260037

Heavy

Davis-Bacon Act general wage determination for heavy construction in Michigan.

Modification 1, revised 05/18/2026 24 trade rates 1 county View on SAM.gov

Track MI20260037

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP0202-003 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER, INCLUDES FORM WORK $30.83 $21.09 $51.92
ELEC0498-001 Effective 06/01/2024
Trade Rate Fringe Total
ELECTRICIAN $36.62 $23.05 $59.67
ENGI0325-033 Effective 09/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR $39.95 $25.25 $65.20
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) $40.52 $25.25 $65.77
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) $41.25 $25.25 $66.50
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, CRANE, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) $45.98 $25.25 $71.23
ENGI0326-023 Effective 06/01/2025
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.32 $25.25 $66.57
IRON0025-011 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL $36.55 $34.04 $70.59
IRONWORKER: REINFORCING $36.55 $34.04 $70.59
LABO0334-025 Effective 09/01/2022
Trade Rate Fringe Total
LABORER ((4) GRADE CHECKER) $22.73 $12.95 $35.68
LABORER ((1) COMMON OR GENERAL) $22.42 $12.95 $35.37
LABO1098-023 Effective 07/01/2025
Trade Rate Fringe Total
LABORER: COMMON OR GENERAL (EXCLUDES OPEN CUT CONSTRUCTION) $25.02 $13.45 $38.47
PLAS0016-033 Effective 04/01/2014
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $23.10 $12.38 $35.48
PLUM0085-002 Effective 05/04/2023
Trade Rate Fringe Total
PLUMBER $43.50 $21.10 $64.60
SUMI2010-035 Effective 11/09/2010
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $12.63 $1.25 $13.88
OPERATOR: LOADER $13.68 $8.41 $22.09
OPERATOR: ROLLER $13.74 $7.93 $21.67
OPERATOR: GRADER/BLADE $15.50 $3.62 $19.12
OPERATOR: BULLDOZER $16.17 $9.51 $25.68
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $12.98 $6.12 $19.10
LABORER: PIPELAYER $15.28 $3.99 $19.27
LABORER: MASON TENDER - CEMENT/CONCRETE $15.97 $3.51 $19.48
LABORER: LANDSCAPE $10.89 $1.74 $12.63
TEAM0007-010 Effective 06/01/2025
Trade Rate Fringe Total
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY $33.55 $0.75 $34.30

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260037 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.