MI20260042

Heavy

Davis-Bacon Act general wage determination for heavy construction in Michigan.

Modification 1, revised 05/18/2026 29 trade rates 9 counties View on SAM.gov

Track MI20260042

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP0202-004 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER, INCLUDES FORM WORK (ALL OTHER COUNTIES) $30.83 $21.09 $51.92
CARP0706-015 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER, INCLUDES FORM WORK (IOSCO & OGEMAW COUNTIES) $35.86 $23.69 $59.55
ELEC0498-010 Effective 06/01/2024
Trade Rate Fringe Total
ELECTRICIAN (CRAWFORD (DOES NOT INCLUDE THE TOWNSHIP OF LOVELLS), OTSEGO (DOES NOT INCLUDE THE TOWNSHIPS OF CHARLTON, CHESTER AND DOVER) & ROSCOMMON (DOES NOT INCLUDE THE TOWNSHIPS OF BACKUS, NESTOR AND ROSCOMMON) COUNTIES) $36.62 $23.05 $59.67
ELEC0692-009 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN (ALPENA, CRAWFORD (TOWNSHIP OF LOVELLS); IOSCO (TOWNSHIPS OF AUSABLE, OSCODA, PLAINFIELD & WILBUR), MONTMORENCY, OGEMAW (TOWNSHIPS OF FOSTER, ROSE & GOODAR), OSCODA, OTSEGO (TOWNSHIPS OF CHARLTON, CHESTER AND DOVER) & PRESQUE ISLE COUNTIES) $37.75 $25.60 $63.35
ELEC0692-019 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN (IOSCO (TOWNSHIPS OF ALABASTER, BALDWIN, BURLEIGH, GRANT, RENO, SHERMAN & TAWAS), OGEMAW (ALL TOWNSHIPS EXCEPT FOSTER, GOODAR & ROSE) & ROSCOMMON (TOWNSHIPS OF BACKUS, NESTOR AND ROSCOMMON) COUNTIES) $40.00 $26.52 $66.52
ENGI0325-021 Effective 09/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR $39.95 $25.25 $65.20
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) $40.52 $25.25 $65.77
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) $41.25 $25.25 $66.50
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) $45.98 $25.25 $71.23
ENGI0326-013 Effective 06/01/2025
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT: EXCLUDES UNDERGROUND CONSTRUCTION GROUP 4 BOOM TRUCK (NON-SWINGING) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.32 $25.25 $66.57
IRON0025-006 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48
IRONWORKER: REINFORCING $36.55 $33.37 $69.92
LABO0334-025 Effective 09/01/2022
Trade Rate Fringe Total
LABORER ((4) GRADE CHECKER) $22.73 $12.95 $35.68
LABORER ((1) COMMON OR GENERAL) $22.42 $12.95 $35.37
LABO1098-008 Effective 07/01/2025
Trade Rate Fringe Total
LABORER: COMMON OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) $25.02 $13.45 $38.47
LABORER: COMMON 3.323OR GENERAL (ALPENA, CRAWFORD, IOSCO, MONTMORENCY, OSCODA, OTSEGO & PRESQUE ISLE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) $23.32 $13.45 $36.77
LABO1098-020 Effective 07/01/2025
Trade Rate Fringe Total
LABORER: COMMON OR GENERAL (OGEMAW & ROSCOMMON COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) $27.68 $13.45 $41.13
PLAS0016-032 Effective 04/01/2014
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER (IOSCO & OGEMAW COUNTIES) $25.47 $12.38 $37.85
PLAS0016-034 Effective 04/01/2014
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER (ALPENA, CRAWFORD, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE & ROSCOMMON COUNTIES) $23.10 $12.38 $35.48
PLUM0085-002 Effective 05/04/2023
Trade Rate Fringe Total
PLUMBER $43.50 $21.10 $64.60
SUMI2010-040 Effective 11/09/2010
Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK $11.10 $1.25 $12.35
OPERATOR: LOADER $16.07 $8.37 $24.44
OPERATOR: ROLLER $13.74 $7.93 $21.67
OPERATOR: GRADER/BLADE $15.50 $3.62 $19.12
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $12.98 $6.12 $19.10
LABORER: PIPELAYER $15.28 $3.99 $19.27
LABORER: MASON TENDER - CEMENT/CONCRETE $15.97 $3.51 $19.48
LABORER: LANDSCAPE $10.89 $1.74 $12.63
TEAM0007-010 Effective 06/01/2025
Trade Rate Fringe Total
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY $33.55 $0.75 $34.30

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 9 counties in Michigan.

Get notified when MI20260042 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.