MI20260051

Heavy

Davis-Bacon Act general wage determination for heavy construction in Michigan.

Modification 1, revised 05/18/2026 27 trade rates 1 county View on SAM.gov

Track MI20260051

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP0706-009 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER, INCLUDES FORM WORK $35.86 $23.69 $59.55
ELEC0692-003 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN $40.00 $26.52 $66.52
ENGI0325-009 Effective 09/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER $39.95 $25.25 $65.20
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) $40.52 $25.25 $65.77
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) $41.25 $25.25 $66.50
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) $45.98 $25.25 $71.23
ENGI0326-011 Effective 06/01/2025
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $35.46 $25.25 $60.71
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.32 $25.25 $66.57
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $41.32 $25.25 $66.57
IRON0025-006 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL $36.55 $35.93 $72.48
IRONWORKER: REINFORCING $36.55 $33.37 $69.92
LABO0334-007 Effective 09/01/2022
Trade Rate Fringe Total
LABORER ((7) LANDSCAPER) $18.41 $12.95 $31.36
LABORER ((5) PIPELAYER) $22.85 $12.95 $35.80
LABORER ((4) GRADE CHECKER) $22.73 $12.55 $35.28
LABORER ((2) MASON TENDER-CEMENT/CONCRETE) $22.55 $12.95 $35.50
LABORER ((1) COMMON OR GENERAL) $22.42 $12.95 $35.37
LABO0334-012 Effective 06/01/2025
Trade Rate Fringe Total
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER $27.71 $9.10 $36.81
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) $29.93 $9.10 $39.03
LABO1098-007 Effective 07/01/2025
Trade Rate Fringe Total
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) $27.68 $13.45 $41.13
PAIN1803-005 Effective 06/01/2014
Trade Rate Fringe Total
PAINTER: SPRAY $23.58 $12.80 $36.38
PAINTER: BRUSH & ROLLER $22.58 $12.80 $35.38
PLAS0016-030 Effective 04/01/2014
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $25.47 $12.38 $37.85
PLUM0085-005 Effective 05/04/2020
Trade Rate Fringe Total
PLUMBER $38.25 $21.07 $59.32
SUMI2010-049 Effective 11/09/2010
Trade Rate Fringe Total
TRUCK DRIVER: OFF THE ROAD TRUCK $20.82 $3.69 $24.51
TEAM0007-008 Effective 06/01/2025
Trade Rate Fringe Total
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY $33.55 $0.75 $34.30
TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER $33.40 $0.75 $34.15
TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.30 $0.75 $34.05

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260051 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.