MI20260054
HeavyDavis-Bacon Act general wage determination for heavy construction in Michigan.
Track MI20260054
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP0525-006 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $28.29 | $21.42 | $49.71 |
ELEC0153-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $46.00 | $29.23 | $75.23 |
ENGI0325-009 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
ENGI0326-025 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $35.46 | $25.25 | $60.71 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $41.32 | $25.25 | $66.57 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | $41.32 | $25.25 | $66.57 |
IRON0292-008 Effective 06/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL AND REINFORCING | $31.75 | $22.84 | $54.59 |
LABO0334-011 Effective 09/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER ((5) PIPELAYER) | $22.85 | $12.95 | $35.80 |
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 |
| LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 |
LABO0355-010 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $27.21 | $13.45 | $40.66 |
PAIN0312-014 Effective 06/12/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY | $22.75 | $11.94 | $34.69 |
| PAINTER: BRUSH & ROLLER | $21.75 | $11.94 | $33.69 |
PLAS0016-019 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.63 | $12.88 | $37.51 |
PLUM0172-008 Effective 05/28/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $33.60 | $19.36 | $52.96 |
SUMI2010-052 Effective 11/09/2010 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 | $24.51 |
| TRUCK DRIVER: DUMP TRUCK | $18.00 | $6.43 | $24.43 |
| LABORER: LANDSCAPE | $12.25 | $0.00 | $12.25 |
TEAM0007-011 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.30 | $0.75 | $34.05 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY | $33.55 | $0.75 | $34.30 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260054 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.