Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP1004-017 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $36.21 | $21.06 | $57.27 |
ELEC0252-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (TOWNSHIPS OF BUNKER HILL, LESLIE, ONONDAGA & STOCKBRIDGE) | $56.05 | $30.52 | $86.57 |
ELEC0665-015 Effective 05/31/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (TOWNSHIPS OF ALAIEDON, AURELIUS, DELHI, INGHAM, LANSING, LEROY, LOCKE, MERIDIAN, VEVAY, WHEATFIELD, WHITE OAK AND WILLIAMSON) | $45.00 | $31.37 | $76.37 |
ENGI0325-009 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
ENGI0326-011 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 | $60.71 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 |
IRON0025-006 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 |
LABO0334-013 Effective 09/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER ((5) PIPELAYER) | $23.84 | $13.15 | $36.99 |
| LABORER ((4) GRADE CHECKER) | $23.70 | $13.15 | $36.85 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $23.53 | $13.15 | $36.68 |
| LABORER ((1) COMMON OR GENERAL) | $23.39 | $13.15 | $36.54 |
LABO0499-024 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION) | $32.53 | $13.45 | $45.98 |
PAIN0845-017 Effective 05/21/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, ROLLER AND SPRAY | $21.89 | $11.85 | $33.74 |
PLAS0016-027 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 | $37.52 |
PLUM0333-020 Effective 06/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER/PIPEFITTER | $42.29 | $23.94 | $66.23 |
SUMI2010-056 Effective 11/09/2010 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 | $24.51 |
| TRUCK DRIVER: DUMP TRUCK | $18.00 | $6.43 | $24.43 |
| LABORER: LANDSCAPE | $12.25 | $0.00 | $12.25 |
TEAM0007-011 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.30 | $0.75 | $34.05 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY | $33.55 | $0.75 | $34.30 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260058 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.