MI20260066

Heavy

Davis-Bacon Act general wage determination for heavy construction in Michigan.

Modification 1, revised 05/18/2026 24 trade rates 1 county View on SAM.gov

Track MI20260066

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

CARP0687-009 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER, INCLUDES FORM WORK $42.44 $31.43 $73.87
ELEC0008-011 Effective 05/25/2024
Trade Rate Fringe Total
ELECTRICIAN $48.40 $17.79 $66.19
ENGI0325-019 Effective 09/01/2025
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER $39.95 $25.25 $65.20
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) $40.52 $25.25 $65.77
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) $41.25 $25.25 $66.50
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) $45.98 $25.25 $71.23
IRON0055-010 Effective 07/01/2024
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL AND REINFORCING $35.50 $29.20 $64.70
LABO0334-009 Effective 06/01/2025
Trade Rate Fringe Total
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER $27.71 $9.10 $36.81
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) $29.93 $9.10 $39.03
LABO0334-018 Effective 09/01/2022
Trade Rate Fringe Total
LABORER ((7) LANDSCAPE) $19.59 $12.95 $32.54
LABORER ((524.20) PIPELAYER) $25.65 $12.95 $38.60
LABORER ((4) GRADE CHECKER) $25.50 $12.95 $38.45
LABORER ((2) MASON TENDER-CEMENT/CONCRETE) $22.11 $12.95 $35.06
LABORER ((1) COMMON OR GENERAL) $25.20 $12.95 $38.15
LABO0499-018 Effective 06/01/2025
Trade Rate Fringe Total
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 MASON TENDER - CEMENT/CONCRETE $38.80 $15.70 $54.50
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 COMMON OR GENERAL; GRADE CHECKER $38.58 $15.70 $54.28
PAIN0022-005 Effective 07/01/2008
Trade Rate Fringe Total
PAINTER: SPRAY $25.86 $14.75 $40.61
PAINTER: BRUSH & ROLLER $25.06 $14.75 $39.81
PLAS0886-009 Effective 08/01/2011
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $27.19 $16.00 $43.19
PLUM0671-003 Effective 07/01/2022
Trade Rate Fringe Total
PLUMBER $43.79 $23.94 $67.73
SUMI2010-064 Effective 11/09/2010
Trade Rate Fringe Total
TRUCK DRIVER: OFF THE ROAD TRUCK $20.82 $3.69 $24.51
TEAM0007-006 Effective 06/01/2025
Trade Rate Fringe Total
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY $33.65 $0.75 $34.40
TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER $33.50 $0.75 $34.25
TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY $33.40 $0.75 $34.15

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260066 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.