MI20260068
HeavyDavis-Bacon Act general wage determination for heavy construction in Michigan.
Track MI20260068
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
CARP0100-009 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | $31.50 | $21.15 | $52.65 |
ELEC0275-001 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $36.52 | $25.15 | $61.67 |
ENGI0325-016 Effective 09/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 |
| POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BORING MACHINE, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 |
ENGI0326-009 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $35.46 | $25.25 | $60.71 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. SWING BOOM TRUCK OPERATOR OVER 12 TONS-$.50 PER HOUR | $41.32 | $25.25 | $66.57 |
IRON0025-011 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $34.04 | $70.59 |
| IRONWORKER: REINFORCING | $36.55 | $34.04 | $70.59 |
LABO0334-006 Effective 09/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER ((4) GRADE CHECKER) | $22.73 | $12.95 | $35.68 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | $22.55 | $12.95 | $35.50 |
| LABORER ((1) COMMON OR GENERAL) | $22.42 | $12.95 | $35.37 |
LABO0355-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | $24.55 | $13.45 | $38.00 |
PAIN0845-017 Effective 05/21/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH, ROLLER AND SPRAY | $21.89 | $11.85 | $33.74 |
PLAS0016-017 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $21.15 | $12.78 | $33.93 |
PLUM0174-003 Effective 07/01/2022 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER | $39.80 | $23.82 | $63.62 |
SUMI2010-066 Effective 11/09/2010 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $16.50 | $4.89 | $21.39 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 | $24.51 |
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 |
| PIPEFITTER | $19.90 | $5.63 | $25.53 |
| OPERATOR: LOADER | $17.41 | $4.97 | $22.38 |
| OPERATOR: GRADER/BLADE | $16.64 | $0.00 | $16.64 |
| OPERATOR: CRANE | $18.50 | $5.10 | $23.60 |
| OPERATOR: BULLDOZER | $21.17 | $5.84 | $27.01 |
| OPERATOR: BACKHOE/EXCAVATOR | $22.61 | $8.40 | $31.01 |
| LABORER: PIPELAYER | $16.00 | $4.66 | $20.66 |
| LABORER: LANDSCAPE | $12.21 | $1.96 | $14.17 |
TEAM0007-010 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY | $33.55 | $0.75 | $34.30 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/23/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260068 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.