MI20260080
BuildingDavis-Bacon Act general wage determination for building construction in Michigan.
Track MI20260080
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0075-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $37.20 | $0.00 | $37.20 |
BOIL0169-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
BRMI0009-031 Effective 08/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $27.35 | $22.20 | $49.55 |
| TILE FINISHER | $26.24 | $21.13 | $47.37 |
| BRICKLAYER | $35.21 | $24.26 | $59.47 |
CARP0525-002 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $28.29 | $21.42 | $49.71 |
ELEC0153-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $46.00 | $29.23 | $75.23 |
ENGI0324-002 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.37 | $25.25 | $58.62 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
IRON0292-002 Effective 06/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: REINFORCING AND STRUCTURAL | $31.75 | $22.84 | $54.59 |
LABO0355-022 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | $27.21 | $13.45 | $40.66 |
PAIN0312-004 Effective 06/12/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY | $22.75 | $11.94 | $34.69 |
| PAINTER: BRUSH AND ROLLER | $33.45 | $9.62 | $43.07 |
| PAINTER: SPRAY | $22.75 | $11.94 | $34.69 |
| PAINTER: BRUSH AND ROLLER | $33.45 | $9.62 | $43.07 |
PAIN0312-004 Effective 06/12/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY | $22.75 | $11.94 | $34.69 |
| PAINTER: BRUSH AND ROLLER | $33.45 | $9.62 | $43.07 |
| PAINTER: SPRAY | $22.75 | $11.94 | $34.69 |
| PAINTER: BRUSH AND ROLLER | $33.45 | $9.62 | $43.07 |
PLAS0016-014 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.63 | $12.88 | $37.51 |
PLUM0172-004 Effective 05/28/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $33.60 | $19.36 | $52.96 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | $33.60 | $19.36 | $52.96 |
ROOF0023-002 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER: COMPOSITION | $34.55 | $21.04 | $55.59 |
| ROOFER (SLATE & TILE) | $36.05 | $21.04 | $57.09 |
SHEE0020-033 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $44.45 | $30.43 | $74.88 |
SUMI2011-005 Effective 02/01/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: FLATBED AND LOWBOY | $14.50 | $0.44 | $14.94 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $17.26 | $11.42 | $28.68 |
| OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 |
| OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 |
| LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/30/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260080 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.