MI20260081
BuildingDavis-Bacon Act general wage determination for building construction in Michigan.
Track MI20260081
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0047-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
BOIL0169-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
CARP1004-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING) | $36.21 | $21.06 | $57.27 |
CARP1004-007 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION ONLY) | $36.21 | $21.06 | $57.27 |
CARP1102-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $42.92 | $39.13 | $82.05 |
ELEC0665-001 Effective 05/31/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING) | $40.50 | $28.30 | $68.80 |
ENGI0324-010 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
IRON0025-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL (EXCLUDING METAL BUILDING ERECTION) | $36.55 | $35.60 | $72.15 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 |
LABO0499-012 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER | $32.53 | $13.45 | $45.98 |
PAIN0845-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: DRYWALL FINISHING/TAPING | $28.32 | $16.88 | $45.20 |
| PAINTER: BRUSH, ROLLER, SPRAY AND PAPERHANGING | $28.75 | $18.68 | $47.43 |
PLAS0016-011 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $24.64 | $12.88 | $37.52 |
ROOF0070-003 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $33.18 | $17.22 | $50.40 |
SFMI0669-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
SHEE0007-019 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK; EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 | $64.27 |
SUMI2011-006 Effective 02/01/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER: LOWBOY TRUCK | $14.50 | $0.44 | $14.94 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $16.00 | $7.26 | $23.26 |
| OPERATOR: LOADER | $19.75 | $9.98 | $29.73 |
| OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 |
| OPERATOR: GRADER/BLADE | $22.00 | $6.29 | $28.29 |
| OPERATOR: BULLDOZER | $19.73 | $7.02 | $26.75 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $21.94 | $8.72 | $30.66 |
| METAL BUILDING ERECTOR | $16.92 | $6.32 | $23.24 |
| LABORER: LANDSCAPE & IRRIGATION | $12.50 | $0.50 | $13.00 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND CARPET/RESILIENT FLOOR INSTALLATION | $20.41 | $5.69 | $26.10 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260081 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.