MI20260083
BuildingDavis-Bacon Act general wage determination for building construction in Michigan.
Track MI20260083
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0047-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
BOIL0169-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
CARP0706-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $36.46 | $23.69 | $60.15 |
ELEC0948-001 Effective 05/25/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $44.83 | $26.96 | $71.79 |
ENGI0324-011 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
IRON0025-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 |
LABO0334-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 |
LABO1075-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE, PIPELAYER; SANDBLASTER | $29.46 | $16.10 | $45.56 |
PAIN1052-001 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D) | $31.01 | $17.29 | $48.30 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $31.01 | $17.19 | $48.20 |
| PAINTER: SPRAY | $31.01 | $17.29 | $48.30 |
| PAINTER: BRUSH & ROLER | $32.58 | $18.12 | $50.70 |
PAIN1052-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| DRYWALL FINISHER/TAPER (DRYWALL SANDING) | $33.54 | $18.12 | $51.66 |
PLAS0016-005 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $25.58 | $12.88 | $38.46 |
PLUM0370-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $46.61 | $22.95 | $69.56 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC SYSTEM INSTALLATION) | $46.61 | $22.95 | $69.56 |
ROOF0149-005 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $30.38 | $19.97 | $50.35 |
SFMI0669-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
SHEE0007-008 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $35.19 | $23.57 | $58.76 |
SUMI2011-008 Effective 02/01/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 1 | 01/23/2026 |
| 2 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260083 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.