MI20260087

Building

Davis-Bacon Act general wage determination for building construction in Michigan.

Modification 1, revised 05/18/2026 40 trade rates 1 county View on SAM.gov

Track MI20260087

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0047-002 Effective 07/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65
BOIL0169-001 Effective 07/01/2025
Trade Rate Fringe Total
BOILERMAKER $43.50 $36.74 $80.24
BRMI0009-031 Effective 08/01/2024
Trade Rate Fringe Total
TILE SETTER $27.35 $22.20 $49.55
TILE FINISHER $26.24 $21.13 $47.37
BRICKLAYER $35.21 $24.26 $59.47
CARP0525-013 Effective 06/01/2023
Trade Rate Fringe Total
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDER) $28.29 $21.42 $49.71
CARP1102-001 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $40.04 $26.47 $66.51
ELEC0131-001 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) $42.78 $21.84 $64.62
ENGI0324-002 Effective 06/01/2024
Trade Rate Fringe Total
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $33.37 $25.25 $58.62
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $39.57 $25.25 $64.82
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $39.57 $25.25 $64.82
IRON0025-005 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL $36.55 $29.51 $66.06
IRONWORKER: REINFORCING $36.55 $29.51 $66.06
LABO0355-022 Effective 06/01/2025
Trade Rate Fringe Total
LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) $27.21 $13.45 $40.66
PAIN0845-013 Effective 06/01/2024
Trade Rate Fringe Total
PAINTER: SPRAY $27.07 $16.56 $43.63
PAINTER: DRYWALL FINISHING/TAPING $27.32 $16.72 $44.04
PAINTER: BRUSH AND ROLLER $27.07 $16.46 $43.53
PAINTER: SPRAY $27.07 $16.56 $43.63
PAINTER: DRYWALL FINISHING/TAPING $27.32 $16.72 $44.04
PAINTER: BRUSH AND ROLLER $27.07 $16.46 $43.53
PAIN0845-013 Effective 06/01/2025
Trade Rate Fringe Total
PAINTER: SPRAY $27.07 $16.56 $43.63
PAINTER: DRYWALL FINISHING/TAPING $27.32 $16.72 $44.04
PAINTER: BRUSH AND ROLLER $27.07 $16.46 $43.53
PAINTER: SPRAY $27.07 $16.56 $43.63
PAINTER: DRYWALL FINISHING/TAPING $27.32 $16.72 $44.04
PAINTER: BRUSH AND ROLLER $27.07 $16.46 $43.53
PLAS0016-003 Effective 04/01/2014
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $22.31 $12.83 $35.14
PLUM0357-001 Effective 07/01/2025
Trade Rate Fringe Total
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (EXCLUDING FORT CUSTER) $32.50 $24.97 $57.47
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION (EXCLUDING FORT CUSTER) $32.50 $24.97 $57.47
ROOF0070-002 Effective 06/01/2025
Trade Rate Fringe Total
ROOFER $33.98 $18.51 $52.49
SFMI0669-001 Effective 01/01/2025
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $41.34 $27.39 $68.73
SHEE0007-010 Effective 05/01/2024
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) $42.74 $21.53 $64.27
SUMI2011-012 Effective 02/01/2011
Trade Rate Fringe Total
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75
TRUCK DRIVER: LOWBOY TRUCK $14.50 $0.44 $14.94
TRUCK DRIVER: DUMP TRUCK $17.26 $11.42 $28.68
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $23.59 $5.66 $29.25
OPERATOR: TRACTOR $19.10 $8.48 $27.58
OPERATOR: BULLDOZER $19.68 $6.64 $26.32
LABORER: LANDSCAPE & IRRIGATION $10.38 $0.50 $10.88
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260087 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.