MI20260092

Building

Davis-Bacon Act general wage determination for building construction in Michigan.

Modification 1, revised 05/18/2026 27 trade rates 1 county View on SAM.gov

Track MI20260092

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0045-005 Effective 07/01/2024
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $37.00 $23.85 $60.85
BOIL0085-003 Effective 01/06/2025
Trade Rate Fringe Total
BOILERMAKER $43.50 $37.64 $81.14
BRMI0001-001 Effective 06/01/2024
Trade Rate Fringe Total
TILE SETTER $40.53 $23.62 $64.15
TILE FINISHER $33.50 $23.52 $57.02
BRICKLAYER $41.66 $26.53 $68.19
CARP0687-004 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION; DRYWALL HANGING, FINISHING/TAPING; FORM WORK; METAL STUD INSTALLATION; & SCAFFOLD BUILDING) $42.44 $31.43 $73.87
CARP1102-002 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $42.92 $39.13 $82.05
ELEC0008-006 Effective 05/25/2024
Trade Rate Fringe Total
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING $48.40 $17.79 $66.19
IRON0055-014 Effective 07/01/2024
Trade Rate Fringe Total
IRONWORKER: REINFORCING & STRUCTURAL $35.50 $29.20 $64.70
LABO0334-005 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) $29.93 $9.10 $39.03
LABO0499-003 Effective 06/01/2025
Trade Rate Fringe Total
LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE $38.80 $15.70 $54.50
LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER $38.58 $15.70 $54.28
PAIN0022-006 Effective 06/01/2015
Trade Rate Fringe Total
PAINTER: SPRAY $26.86 $17.66 $44.52
PAINTER: BRUSH AND ROLLER $32.85 $20.41 $53.26
PAINTER: SPRAY $26.86 $17.66 $44.52
PAINTER: BRUSH AND ROLLER $32.85 $20.41 $53.26
PAIN0022-006 Effective 06/01/2022
Trade Rate Fringe Total
PAINTER: SPRAY $26.86 $17.66 $44.52
PAINTER: BRUSH AND ROLLER $32.85 $20.41 $53.26
PAINTER: SPRAY $26.86 $17.66 $44.52
PAINTER: BRUSH AND ROLLER $32.85 $20.41 $53.26
PLAS0067-001 Effective 04/01/2014
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $30.63 $14.07 $44.70
PLUM0671-001 Effective 07/01/2025
Trade Rate Fringe Total
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION $46.71 $26.79 $73.50
PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) $46.71 $26.79 $73.50
ROOF0134-002 Effective 07/01/2024
Trade Rate Fringe Total
ROOFER $30.73 $26.82 $57.55
SHEE0033-014 Effective 07/01/2011
Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $30.80 $21.51 $52.31
SUMI2011-017 Effective 02/01/2011
Trade Rate Fringe Total
TRUCK DRIVER: TRACTOR HAUL TRUCK $13.57 $1.18 $14.75
IRONWORKER, ORNAMENTAL $18.48 $7.93 $26.41

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260092 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.