MI20260096
BuildingDavis-Bacon Act general wage determination for building construction in Michigan.
Track MI20260096
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0047-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
BOIL0169-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
BRMI0009-008 Effective 08/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $32.20 | $23.46 | $55.66 |
| TILE FINISHER | $27.94 | $21.15 | $49.09 |
CARP0100-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING FORM WORK; EXCLUDING DRYWALL HANGING) | $31.50 | $21.15 | $52.65 |
CARP1102-001 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
ENGI0324-014 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
IRON0025-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 |
LABO0355-026 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | $28.56 | $12.95 | $41.51 |
PAIN0845-006 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: BRUSH AND SPRAY | $28.75 | $18.68 | $47.43 |
PLUM0174-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $47.40 | $23.35 | $70.75 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $47.40 | $23.35 | $70.75 |
ROOF0070-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $26.60 | $16.75 | $43.35 |
SHEE0007-014 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $35.41 | $15.86 | $51.27 |
SUMI2011-021 Effective 02/01/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER: DUMP TRUCK | $19.82 | $2.19 | $22.01 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $18.07 | $4.93 | $23.00 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $20.96 | $7.35 | $28.31 |
| PAINTER: ROLLER | $17.28 | $3.43 | $20.71 |
| OPERATOR: LOADER | $16.38 | $3.44 | $19.82 |
| OPERATOR: TRACTOR | $15.72 | $1.92 | $17.64 |
| OPERATOR: BULLDOZER | $17.56 | $4.95 | $22.51 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $14.96 | $4.01 | $18.97 |
| LABORER: PIPELAYER | $18.32 | $3.28 | $21.60 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $14.82 | $3.59 | $18.41 |
| LABORER: MASON TENDER - BRICK | $17.61 | $4.13 | $21.74 |
| LABORER: LANDSCAPE & IRRIGATION | $8.93 | $1.62 | $10.55 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY, EXCLUDES INSTALLATION OF HVAC PIPE AND DUCT) | $18.92 | $4.71 | $23.63 |
| ELECTRICIAN | $20.81 | $5.01 | $25.82 |
| CEMENT MASON/CONCRETE FINISHER | $17.43 | $4.42 | $21.85 |
| CARPENTER (DRYWALL HANGING ONLY) | $17.26 | $2.69 | $19.95 |
| BRICKLAYER | $21.73 | $5.37 | $27.10 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260096 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.