Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0047-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
BOIL0169-001 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $36.74 | $80.24 |
CARP0706-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION & DRYWALL HANGING; EXCLUDING FORM WORK) | $35.86 | $23.69 | $59.55 |
CARP1045-003 Effective 06/01/2013 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LATHER | $24.29 | $13.66 | $37.95 |
ELEC0557-001 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDING ALARM INSTALLATION) | $39.50 | $25.03 | $64.53 |
| ELECTRICIAN (ALARM INSTALLATION) | $30.25 | $15.00 | $45.25 |
ENGI0324-016 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
IRON0025-019 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 |
LABO1098-009 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER | $27.68 | $13.45 | $41.13 |
PAIN1803-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: DRYWALL FINISHING/TAPING | $30.22 | $22.22 | $52.44 |
| PAINTER: BRUSH AND SPRAY | $29.23 | $19.11 | $48.34 |
PLAS0016-012 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $25.47 | $12.38 | $37.85 |
PLUM0085-003 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | $46.00 | $22.99 | $68.99 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION | $46.00 | $22.99 | $68.99 |
ROOF0149-003 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $30.38 | $19.87 | $50.25 |
SFMI0669-001 Effective 01/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
SHEE0007-009 Effective 05/01/2018 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | $26.83 | $23.78 | $50.61 |
SUMI2011-022 Effective 02/01/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $12.00 | $0.00 | $12.00 |
| PAINTER: ROLLER | $22.02 | $6.02 | $28.04 |
| OPERATOR: LOADER | $17.62 | $0.00 | $17.62 |
| OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 |
| OPERATOR: BULLDOZER | $17.50 | $8.67 | $26.17 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.31 | $13.84 | $32.15 |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 |
| FLOOR LAYER: VINYL FLOORING | $16.81 | $3.73 | $20.54 |
| CARPENTER (FORM WORK ONLY) | $16.50 | $1.65 | $18.15 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260097 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.