MI20260102

Building

Davis-Bacon Act general wage determination for building construction in Michigan.

Modification 1, revised 05/18/2026 51 trade rates 1 county View on SAM.gov

Track MI20260102

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0047-005 Effective 07/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65
BOIL0169-002 Effective 07/01/2025
Trade Rate Fringe Total
BOILERMAKER $43.50 $37.64 $81.14
BRMI0009-026 Effective 08/01/2024
Trade Rate Fringe Total
TILE SETTER $35.83 $22.18 $58.01
CARP0202-002 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER (DRYWALL HANGER AND FORM WORK) $30.83 $21.09 $51.92
ELEC0692-026 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN $37.75 $25.60 $63.35
ENGI0324-020 Effective 06/01/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $39.57 $25.25 $64.82
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $39.57 $25.25 $64.82
IRON0025-010 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL $36.55 $35.93 $72.48
IRONWORKER, REINFORCING $36.55 $33.37 $69.92
LABO1098-025 Effective 07/01/2025
Trade Rate Fringe Total
LABORER: SANDBLASTER $26.23 $13.45 $39.68
LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER $25.02 $13.45 $38.47
PAIN1803-004 Effective 06/01/2025
Trade Rate Fringe Total
PAINTER: BRUSH ONLY $29.23 $19.11 $48.34
PLAS0016-036 Effective 04/01/2014
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $23.10 $12.38 $35.48
PLUM0085-001 Effective 05/01/2023
Trade Rate Fringe Total
PLUMBER (HVAC SYSTEM INSTALLATION ONLY) $38.01 $21.73 $59.74
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $38.01 $21.73 $59.74
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $38.01 $21.73 $59.74
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $38.01 $21.73 $59.74
PLUMBER (HVAC SYSTEM INSTALLATION ONLY) $38.01 $21.73 $59.74
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $38.01 $21.73 $59.74
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $38.01 $21.73 $59.74
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $38.01 $21.73 $59.74
PLUM0085-001 Effective 05/04/2023
Trade Rate Fringe Total
PLUMBER (HVAC SYSTEM INSTALLATION ONLY) $38.01 $21.73 $59.74
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $38.01 $21.73 $59.74
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $38.01 $21.73 $59.74
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $38.01 $21.73 $59.74
PLUMBER (HVAC SYSTEM INSTALLATION ONLY) $38.01 $21.73 $59.74
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $38.01 $21.73 $59.74
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $38.01 $21.73 $59.74
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $38.01 $21.73 $59.74
SFMI0669-003 Effective 01/02/2025
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $41.34 $27.39 $68.73
SHEE0007-018 Effective 05/01/2018
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) $26.83 $23.78 $50.61
SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) $31.05 $25.07 $56.12
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) $26.83 $23.78 $50.61
SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) $31.05 $25.07 $56.12
SHEE0007-018 Effective 05/01/2023
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) $26.83 $23.78 $50.61
SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) $31.05 $25.07 $56.12
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) $26.83 $23.78 $50.61
SHEET METAL WORKER (EXCLUDING HVAC DUCT INSTALLATION) $31.05 $25.07 $56.12
SUMI2011-027 Effective 02/14/2011
Trade Rate Fringe Total
TRUCK DRIVER: FLATBED TRUCK $17.44 $4.51 $21.95
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $16.56 $3.50 $20.06
ROOFER $15.28 $6.61 $21.89
PAINTER: SPRAY $17.00 $3.82 $20.82
PAINTER: ROLLER $18.06 $4.34 $22.40
OPERATOR: TRACTOR $19.60 $7.31 $26.91
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07
LABORER: MASON TENDER - BRICK $14.89 $3.10 $17.99
LABORER: LANDSCAPE & IRRIGATION $14.63 $0.00 $14.63
LABORER: COMMON OR GENERAL $15.46 $6.09 $21.55
CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $20.63 $5.80 $26.43
CARPENTER (METAL STUD INSTALLATION ONLY) $14.80 $4.86 $19.66
BRICKLAYER $22.25 $3.10 $25.35

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260102 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.