Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
BOIL0169-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
CARP0525-014 Effective 06/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $28.29 | $21.42 | $49.71 |
CARP1102-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
ELEC0445-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $41.00 | $25.74 | $66.74 |
ENGI0324-028 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
IRON0025-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 |
IRON0025-009 Effective 04/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | $57.45 |
LABO0355-016 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | $30.72 | $12.95 | $43.67 |
| LABORER : COMMON OR GENERAL; SANDBLASTER | $27.21 | $13.45 | $40.66 |
PAIN0845-013 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY | $27.07 | $16.56 | $43.63 |
| PAINTER: DRYWALL FINISHING/TAPING | $27.32 | $16.72 | $44.04 |
| PAINTER: BRUSH AND ROLLER | $27.07 | $16.46 | $43.53 |
| PAINTER: SPRAY | $27.07 | $16.56 | $43.63 |
| PAINTER: DRYWALL FINISHING/TAPING | $27.32 | $16.72 | $44.04 |
| PAINTER: BRUSH AND ROLLER | $27.07 | $16.46 | $43.53 |
PAIN0845-013 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER: SPRAY | $27.07 | $16.56 | $43.63 |
| PAINTER: DRYWALL FINISHING/TAPING | $27.32 | $16.72 | $44.04 |
| PAINTER: BRUSH AND ROLLER | $27.07 | $16.46 | $43.53 |
| PAINTER: SPRAY | $27.07 | $16.56 | $43.63 |
| PAINTER: DRYWALL FINISHING/TAPING | $27.32 | $16.72 | $44.04 |
| PAINTER: BRUSH AND ROLLER | $27.07 | $16.46 | $43.53 |
PLAS0016-008 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLASTERER | $21.18 | $12.43 | $33.61 |
| CEMENT MASON/CONCRETE FINISHER | $24.63 | $12.88 | $37.51 |
PLUM0333-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $46.29 | $25.43 | $71.72 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $46.29 | $25.43 | $71.72 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $46.29 | $25.43 | $71.72 |
SFMI0669-003 Effective 01/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
SHEE0007-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 | $64.27 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $42.74 | $21.53 | $64.27 |
SUMI2011-035 Effective 02/14/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | $18.77 |
| ROOFER | $15.73 | $7.41 | $23.14 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: ROLLER | $26.64 | $8.09 | $34.73 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 |
| GLAZIER | $16.95 | $4.74 | $21.69 |
| FLOOR LAYER: CARPET | $19.59 | $7.57 | $27.16 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 | $27.13 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260110 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.