MI20260119

Building

Davis-Bacon Act general wage determination for building construction in Michigan.

Modification 0, revised 05/18/2026 74 trade rates 1 county View on SAM.gov

Track MI20260119

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BOIL0169-002 Effective 07/01/2025
Trade Rate Fringe Total
BOILERMAKER $43.50 $37.64 $81.14
BRMI0009-018 Effective 08/01/2024
Trade Rate Fringe Total
TILE SETTER $31.43 $21.13 $52.56
PLASTERER $33.09 $26.58 $59.67
BRICKLAYER $35.14 $24.20 $59.34
CARP0706-008 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) $35.86 $23.69 $59.55
CARP0706-011 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER - CARPET) $35.86 $23.69 $59.55
CARP1102-003 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $42.92 $39.13 $82.05
ELEC0692-006 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) $40.00 $26.52 $66.52
ENGI0324-023 Effective 06/01/2022
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) $39.08 $24.85 $63.93
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $36.43 $24.85 $61.28
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) $44.13 $24.85 $68.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) $26.38 $24.85 $51.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) $26.38 $24.85 $51.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) $30.61 $24.85 $55.46
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) $39.08 $24.85 $63.93
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) $34.72 $24.85 $59.57
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) $36.47 $24.85 $61.32
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) $34.72 $24.85 $59.57
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) $26.13 $24.85 $50.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) $42.38 $24.85 $67.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) $39.08 $24.85 $63.93
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $30.61 $24.85 $55.46
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) $36.47 $24.85 $61.32
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) $36.43 $24.85 $61.28
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) $38.18 $24.85 $63.03
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $28.86 $24.85 $53.71
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) $44.13 $24.85 $68.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) $40.83 $24.85 $65.68
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) $34.72 $24.85 $59.57
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $44.13 $24.85 $68.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) $26.13 $24.85 $50.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) $42.38 $24.85 $67.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) $42.38 $24.85 $67.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $36.47 $24.85 $61.32
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) $40.83 $24.85 $65.68
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) $28.86 $24.85 $53.71
OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. $30.61 $24.85 $55.46
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. $36.47 $24.85 $61.32
IRON0025-009 Effective 04/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) $30.02 $27.43 $57.45
IRON0025-010 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL $36.55 $35.93 $72.48
IRONWORKER, REINFORCING $36.55 $33.37 $69.92
LABO1098-029 Effective 07/01/2025
Trade Rate Fringe Total
LABORER: SANDBLASTER $28.21 $13.45 $41.66
LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) $27.68 $13.45 $41.13
PAIN1803-001 Effective 06/01/2025
Trade Rate Fringe Total
PAINTER: DRYWALL FINISHING/TAPING $30.22 $22.22 $52.44
PAINTER: BRUSH, ROLLER AND SPRAY $29.23 $19.11 $48.34
PLAS0016-038 Effective 04/01/2014
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $25.47 $12.38 $37.85
PLUM0085-004 Effective 05/04/2023
Trade Rate Fringe Total
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $43.50 $22.10 $65.60
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $45.50 $21.75 $67.25
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $45.50 $21.75 $67.25
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $43.50 $22.10 $65.60
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $45.50 $21.75 $67.25
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $45.50 $21.75 $67.25
PLUM0085-004 Effective 05/01/2024
Trade Rate Fringe Total
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $43.50 $22.10 $65.60
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $45.50 $21.75 $67.25
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $45.50 $21.75 $67.25
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $43.50 $22.10 $65.60
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $45.50 $21.75 $67.25
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $45.50 $21.75 $67.25
SHEE0007-021 Effective 05/01/2018
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) $26.83 $23.78 $50.61
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) $26.83 $23.78 $50.61
SUMI2011-044 Effective 02/14/2011
Trade Rate Fringe Total
TRUCK DRIVER: FLATBED TRUCK $16.80 $3.97 $20.77
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.65 $3.12 $18.77
SPRINKLER FITTER (FIRE SPRINKLERS) $19.36 $4.53 $23.89
ROOFER $15.73 $7.41 $23.14
OPERATOR: TRACTOR $19.60 $7.31 $26.91
OPERATOR: ROLLER $28.02 $7.07 $35.09
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07
OPERATOR: BULLDOZER $22.34 $1.22 $23.56
OPERATOR: BACKHOE/EXCAVATOR $19.00 $1.22 $20.22
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84
LABORER: COMMON OR GENERAL $11.75 $1.22 $12.97
GLAZIER $16.95 $4.74 $21.69
CARPENTER (FLOOR LAYING-CARPET ONLY) $19.59 $7.57 $27.16
ASBESTOS WORKER/HEAT & FROST INSULATOR $19.82 $7.31 $27.13

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260119 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.