MI20260121
BuildingDavis-Bacon Act general wage determination for building construction in Michigan.
Track MI20260121
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0047-005 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
BOIL0169-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
BRMI0009-024 Effective 08/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $35.83 | $22.18 | $58.01 |
| BRICKLAYER | $35.83 | $22.18 | $58.01 |
CARP0202-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (DRYWALL HANGER AND FORM WORK) | $30.83 | $21.09 | $51.92 |
CARP1102-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
ELEC0498-013 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $36.62 | $23.05 | $59.67 |
ENGI0324-021 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
IRON0025-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 |
LABO1098-026 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: SANDBLASTER | $26.23 | $13.45 | $39.68 |
| LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $25.02 | $13.45 | $38.47 |
PLAS0016-036 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $23.10 | $12.38 | $35.48 |
PLUM0085-001 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
PLUM0085-001 Effective 05/04/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $38.01 | $21.73 | $59.74 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $38.01 | $21.73 | $59.74 |
SHEE0007-003 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.05 | $25.07 | $56.12 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $31.05 | $25.07 | $56.12 |
SUMI2011-046 Effective 02/14/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: FLATBED TRUCK | $17.44 | $4.51 | $21.95 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $16.56 | $3.50 | $20.06 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $21.56 | $8.41 | $29.97 |
| ROOFER | $13.64 | $4.58 | $18.22 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.38 | $2.00 | $18.38 |
| OPERATOR: LOADER | $24.04 | $6.03 | $30.07 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 |
| OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 |
| LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 |
| LABORER: COMMON OR GENERAL | $13.77 | $3.54 | $17.31 |
| GLAZIER | $17.19 | $3.83 | $21.02 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK | $19.59 | $3.64 | $23.23 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260121 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.