MI20260123

Building

Davis-Bacon Act general wage determination for building construction in Michigan.

Modification 0, revised 05/18/2026 44 trade rates 1 county View on SAM.gov

Track MI20260123

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

BOIL0085-004 Effective 01/06/2025
Trade Rate Fringe Total
BOILERMAKER $43.50 $37.64 $81.14
CARP0525-015 Effective 06/01/2023
Trade Rate Fringe Total
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) $28.29 $21.42 $49.71
CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) $28.29 $21.42 $49.71
CARP1102-005 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $40.04 $26.47 $66.51
ELEC0008-004 Effective 05/25/2024
Trade Rate Fringe Total
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) $48.40 $17.79 $66.19
ENGI0324-028 Effective 06/01/2024
Trade Rate Fringe Total
POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $33.71 $25.25 $58.96
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY $39.57 $25.25 $64.82
IRON0025-005 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL $36.55 $29.51 $66.06
IRONWORKER: REINFORCING $36.55 $29.51 $66.06
IRON0025-009 Effective 04/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) $30.02 $27.43 $57.45
LABO0499-007 Effective 06/01/2025
Trade Rate Fringe Total
LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER) $32.35 $13.45 $45.80
PAIN0022-007 Effective 06/01/2015
Trade Rate Fringe Total
PAINTER: SPRAY (WEST OF M-99) $26.86 $17.66 $44.52
PAINTER: DRYWALL FINISHING/TAPING (WEST OF M-99) $32.85 $20.41 $53.26
PAINTER: BRUSH AND ROLLER (WEST OF M-99) $32.86 $20.41 $53.27
PAINTER: SPRAY (WEST OF M-99) $26.86 $17.66 $44.52
PAINTER: DRYWALL FINISHING/TAPING (WEST OF M-99) $32.85 $20.41 $53.26
PAINTER: BRUSH AND ROLLER (WEST OF M-99) $32.86 $20.41 $53.27
PAIN0022-007 Effective 06/01/2022
Trade Rate Fringe Total
PAINTER: SPRAY (WEST OF M-99) $26.86 $17.66 $44.52
PAINTER: DRYWALL FINISHING/TAPING (WEST OF M-99) $32.85 $20.41 $53.26
PAINTER: BRUSH AND ROLLER (WEST OF M-99) $32.86 $20.41 $53.27
PAINTER: SPRAY (WEST OF M-99) $26.86 $17.66 $44.52
PAINTER: DRYWALL FINISHING/TAPING (WEST OF M-99) $32.85 $20.41 $53.26
PAINTER: BRUSH AND ROLLER (WEST OF M-99) $32.86 $20.41 $53.27
PAIN0312-005 Effective 06/12/2014
Trade Rate Fringe Total
PAINTER: SPRAY (EAST OF M-99) $22.75 $11.94 $34.69
PAINTER: DRYWALL FINISHING/TAPING (EAST OF M-99) $21.75 $11.94 $33.69
PAINTER: BRUSH AND ROLLER (EAST OF M-99) $21.75 $11.94 $33.69
PLAS0886-006 Effective 07/01/2014
Trade Rate Fringe Total
CEMENT MASON/CONCRETE FINISHER $27.18 $18.11 $45.29
PLUM0333-005 Effective 06/01/2025
Trade Rate Fringe Total
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $46.29 $25.43 $71.72
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) $46.29 $25.43 $71.72
PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) $46.29 $25.43 $71.72
SFMI0669-003 Effective 01/02/2025
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $41.34 $27.39 $68.73
SHEE0007-001 Effective 05/01/2024
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) $42.74 $21.53 $64.27
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) $42.74 $21.53 $64.27
SUMI2011-048 Effective 02/14/2011
Trade Rate Fringe Total
TRUCK DRIVER: FLATBED TRUCK $16.80 $3.97 $20.77
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.65 $3.12 $18.77
ROOFER $15.73 $7.41 $23.14
OPERATOR: TRACTOR $19.60 $7.31 $26.91
OPERATOR: ROLLER $28.02 $7.07 $35.09
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07
OPERATOR: BULLDOZER $22.34 $1.22 $23.56
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84
GLAZIER $16.95 $4.74 $21.69
CARPENTER (FLOOR LAYING-CARPET ONLY) $19.59 $7.57 $27.16
ASBESTOS WORKER/HEAT & FROST INSULATOR $19.82 $7.31 $27.13

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260123 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.