MI20260124
BuildingDavis-Bacon Act general wage determination for building construction in Michigan.
Track MI20260124
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0127-004 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $45.24 | $30.56 | $75.80 |
BOIL0169-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
BRMI0006-001 Effective 05/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $32.19 | $24.65 | $56.84 |
| BRICKLAYER | $32.19 | $24.65 | $56.84 |
CARP1510-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $41.00 | $23.43 | $64.43 |
CARP1510-006 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYER - CARPET) | $34.01 | $23.14 | $57.15 |
ELEC0219-015 Effective 06/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING (ELECTRICAL CONTRACTS OVER $180,000) | $33.94 | $21.80 | $55.74 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING (ELECTRICAL CONTRACTS OF $180,000 OR LESS) | $31.75 | $21.73 | $53.48 |
ENGI0324-033 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR:: GROUP 3 OILER | $35.86 | $12.50 | $48.36 |
| POWER EQUIPMENT OPERATOR:: GROUP 2 FORK TRUCK | $37.26 | $25.00 | $62.26 |
| POWER EQUIPMENT OPERATOR:: GROUP 1 BACKHOE, BULLDOZER, CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) | $40.51 | $25.00 | $65.51 |
IRON0008-008 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $35.20 | $32.97 | $68.17 |
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $35.20 | $32.97 | $68.17 |
LABO1329-005 Effective 05/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 |
PAIN1011-001 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (INSULATOR FOAM ONLY) | $28.73 | $15.92 | $44.65 |
PAIN1011-004 Effective 06/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PAINTER (BRUSH AND SPRAY ONLY) | $28.73 | $15.92 | $44.65 |
PLAS0016-037 Effective 04/01/2014 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $20.17 | $10.13 | $30.30 |
PLUM0111-002 Effective 05/27/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 |
PLUM0111-002 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 |
PLUM0111-002 Effective 05/27/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 |
ROOF0149-014 Effective 05/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ROOFER | $26.50 | $15.95 | $42.45 |
SHEE0007-006 Effective 07/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $27.24 | $29.85 | $57.09 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $32.74 | $29.85 | $62.59 |
SUMI2011-049 Effective 02/14/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: FLATBED TRUCK | $17.44 | $4.51 | $21.95 |
| PAINTER: ROLLER | $16.58 | $2.84 | $19.42 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 |
| GLAZIER | $17.50 | $2.27 | $19.77 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260124 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.