MI20260127

Building

Davis-Bacon Act general wage determination for building construction in Michigan.

Modification 0, revised 05/18/2026 93 trade rates 1 county View on SAM.gov

Track MI20260127

Get an email when this wage determination gets a new modification.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Wage Rates

Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.

ASBE0047-005 Effective 07/01/2025
Trade Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR $40.00 $23.65 $63.65
BOIL0169-002 Effective 07/01/2025
Trade Rate Fringe Total
BOILERMAKER $43.50 $37.64 $81.14
BRMI0009-017 Effective 08/01/2024
Trade Rate Fringe Total
TILE SETTER $31.43 $21.13 $52.56
BRICKLAYER $35.14 $24.20 $59.34
CARP0706-021 Effective 06/01/2025
Trade Rate Fringe Total
CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) $35.86 $23.69 $59.55
CARP1102-003 Effective 06/01/2025
Trade Rate Fringe Total
MILLWRIGHT $42.92 $39.13 $82.05
ELEC0275-006 Effective 06/01/2022
Trade Rate Fringe Total
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF BLOOMFIELD, COLDWATER, DEERFIELD, FREMONT, GILMORE, NOTTAWA, ROLLAND, & SHERMAN) $34.41 $18.90 $53.31
ELEC0557-011 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF COE & LINCOLN) $40.00 $29.95 $69.95
ELEC0692-025 Effective 06/01/2025
Trade Rate Fringe Total
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF CHIPPEWA, DENVER, ISABELLA, UNION, VERNON, & WISE) $40.00 $26.52 $66.52
ENGI0324-023 Effective 06/01/2022
Trade Rate Fringe Total
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) $39.08 $24.85 $63.93
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) $36.43 $24.85 $61.28
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) $44.13 $24.85 $68.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) $26.38 $24.85 $51.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) $26.38 $24.85 $51.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) $30.61 $24.85 $55.46
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) $39.08 $24.85 $63.93
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) $34.72 $24.85 $59.57
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) $36.47 $24.85 $61.32
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) $34.72 $24.85 $59.57
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) $26.13 $24.85 $50.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) $42.38 $24.85 $67.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) $39.08 $24.85 $63.93
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $30.61 $24.85 $55.46
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) $36.47 $24.85 $61.32
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) $36.43 $24.85 $61.28
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) $38.18 $24.85 $63.03
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $28.86 $24.85 $53.71
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) $44.13 $24.85 $68.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) $40.83 $24.85 $65.68
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) $34.72 $24.85 $59.57
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $44.13 $24.85 $68.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) $26.13 $24.85 $50.98
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) $42.38 $24.85 $67.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) $42.38 $24.85 $67.23
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) $36.47 $24.85 $61.32
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) $40.83 $24.85 $65.68
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) $28.86 $24.85 $53.71
OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. $30.61 $24.85 $55.46
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. $36.47 $24.85 $61.32
IRON0025-009 Effective 04/01/2025
Trade Rate Fringe Total
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) $30.02 $27.43 $57.45
IRON0025-010 Effective 06/01/2025
Trade Rate Fringe Total
IRONWORKER, STRUCTURAL $36.55 $35.93 $72.48
IRONWORKER, REINFORCING $36.55 $33.37 $69.92
LABO1098-030 Effective 07/01/2025
Trade Rate Fringe Total
LABORER: SANDBLASTER $28.21 $13.45 $41.66
LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER $27.68 $13.45 $41.13
PAIN1803-001 Effective 06/01/2025
Trade Rate Fringe Total
PAINTER: DRYWALL FINISHING/TAPING $30.22 $22.22 $52.44
PAINTER: BRUSH, ROLLER AND SPRAY $29.23 $19.11 $48.34
PLAS0016-039 Effective 04/01/2014
Trade Rate Fringe Total
PLASTERER $26.32 $12.88 $39.20
CEMENT MASON/CONCRETE FINISHER $25.47 $12.38 $37.85
PLUM0085-007 Effective 05/04/2023
Trade Rate Fringe Total
PLUMBER (HVAC PIPE INSTALLATION ONLY) $43.50 $22.10 $65.60
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PLUMBER (HVAC PIPE INSTALLATION ONLY) $43.50 $22.10 $65.60
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PLUMBER (HVAC PIPE INSTALLATION ONLY) $43.50 $22.10 $65.60
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PLUM0085-007 Effective 05/01/2025
Trade Rate Fringe Total
PLUMBER (HVAC PIPE INSTALLATION ONLY) $43.50 $22.10 $65.60
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PLUMBER (HVAC PIPE INSTALLATION ONLY) $43.50 $22.10 $65.60
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PLUMBER (HVAC PIPE INSTALLATION ONLY) $43.50 $22.10 $65.60
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PLUM0085-007 Effective 05/04/2025
Trade Rate Fringe Total
PLUMBER (HVAC PIPE INSTALLATION ONLY) $43.50 $22.10 $65.60
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PLUMBER (HVAC PIPE INSTALLATION ONLY) $43.50 $22.10 $65.60
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PLUMBER (HVAC PIPE INSTALLATION ONLY) $43.50 $22.10 $65.60
PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) $46.00 $22.99 $68.99
SFMI0669-003 Effective 01/02/2025
Trade Rate Fringe Total
SPRINKLER FITTER (FIRE SPRINKLERS) $41.34 $27.39 $68.73
SHEE0007-021 Effective 05/01/2018
Trade Rate Fringe Total
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) $26.83 $23.78 $50.61
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) $26.83 $23.78 $50.61
SUMI2011-052 Effective 02/14/2011
Trade Rate Fringe Total
TRUCK DRIVER: FLATBED TRUCK $16.80 $3.97 $20.77
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK $15.65 $3.12 $18.77
ROOFER $15.71 $8.02 $23.73
OPERATOR: TRACTOR $19.60 $7.31 $26.91
OPERATOR: ROLLER $28.02 $7.07 $35.09
OPERATOR: GRADER/BLADE $24.04 $6.03 $30.07
OPERATOR: BULLDOZER $22.34 $1.22 $23.56
OPERATOR: BACKHOE/EXCAVATOR $24.24 $3.06 $27.30
LABORER: MASON TENDER - BRICK $15.36 $3.10 $18.46
LABORER: LANDSCAPE & IRRIGATION $12.84 $0.00 $12.84
LABORER: COMMON OR GENERAL $16.72 $1.22 $17.94
GLAZIER $16.95 $4.74 $21.69
FLOOR LAYER: CARPET $19.59 $7.57 $27.16
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYING-CARPET $21.67 $3.56 $25.23
CARPENTER (FORM WORK ONLY) $23.08 $1.22 $24.30

Modification History

Modification Publication Date
0 01/02/2026
1 05/18/2026

Counties Covered

This wage determination applies to 1 county in Michigan.

Get notified when MI20260127 is modified

This determination has been revised 2 times. We'll email you when a new modification is published.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.