MI20260134
BuildingDavis-Bacon Act general wage determination for building construction in Michigan.
Track MI20260134
Get an email when this wage determination gets a new modification.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Wage Rates
Grouped by classification code. Rates shown are base hourly rate plus fringe benefits.
ASBE0047-005 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 |
BOIL0169-002 Effective 07/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | $43.50 | $37.64 | $81.14 |
BRMI0009-026 Effective 08/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | $35.83 | $22.18 | $58.01 |
CARP0202-002 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (DRYWALL HANGER AND FORM WORK) | $30.83 | $21.09 | $51.92 |
CARP0202-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (EXCLUDE DRYWALL HANGER AND FORM WORK) | $30.83 | $21.09 | $51.92 |
CARP1102-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | $40.04 | $26.47 | $66.51 |
ELEC0498-013 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | $36.62 | $23.05 | $59.67 |
ENGI0324-029 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 |
IRON0025-005 Effective 06/01/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 |
LABO0355-018 Effective 06/01/2024 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER - BRICK/CEMENT/CONCRETE EXCLUDES OPEN CUT CONSTRUCTION | $30.72 | $12.95 | $43.67 |
| LABORER: COMMON OR GENERAL; SANDBLASTER EXCLUDES OPEN CUT CONSTRUCTION | $23.34 | $11.60 | $34.94 |
PLUM0174-007 Effective 07/01/2019 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 | $57.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 | $57.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 | $57.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
PLUM0174-007 Effective 07/01/2020 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 | $57.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 | $57.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 | $57.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
PLUM0174-007 Effective 07/01/2021 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 | $57.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 | $57.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PLUMBER (HVAC SYSTEM INSTALLATION ONLY) | $35.26 | $22.52 | $57.78 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $37.09 | $22.52 | $59.61 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION) | $37.89 | $23.67 | $61.56 |
SFMI0669-003 Effective 01/02/2025 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 |
SHEE0007-003 Effective 05/01/2023 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.05 | $25.07 | $56.12 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $31.05 | $25.07 | $56.12 |
SUMI2011-059 Effective 02/14/2011 | Trade | Rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: FLATBED TRUCK | $17.44 | $4.51 | $21.95 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $16.56 | $3.50 | $20.06 |
| ROOFER | $13.64 | $4.58 | $18.22 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $16.20 | $2.19 | $18.39 |
| OPERATOR: LOADER | $24.04 | $6.03 | $30.07 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 |
| OPERATOR: ROLLER | $27.47 | $8.86 | $36.33 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 |
| OPERATOR: BULLDOZER | $22.46 | $7.29 | $29.75 |
| OPERATOR: BACKHOE/EXCAVATOR | $24.04 | $6.03 | $30.07 |
| LABORER: LANDSCAPE & IRRIGATION | $11.04 | $4.39 | $15.43 |
| GLAZIER | $17.19 | $3.83 | $21.02 |
| CEMENT MASON/CONCRETE FINISHER | $17.30 | $4.69 | $21.99 |
| BRICKLAYER | $24.89 | $3.10 | $27.99 |
No trade rates match your search.
Modification History
| Modification | Publication Date |
|---|---|
| 0 | 01/02/2026 |
| 1 | 05/18/2026 |
Counties Covered
This wage determination applies to 1 county in Michigan.
Get notified when MI20260134 is modified
This determination has been revised 2 times. We'll email you when a new modification is published.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Data sourced from SAM.gov and updated weekly. This is an unofficial resource — always verify rates against the official wage determination before using them for bidding or compliance.